ROADWORKS SUMMARY
Carlisle Road, CARLISLE, CA5 7NG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Carlisle Road, CA5 7NG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Carlisle Road, CARLISLE, CA5 7NG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Carlisle Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cumberland Council logo
LONG TERM
Between
1 Oct 2023 and 29 May 2025
Details
View Map
Share
Follow
Road Leading From Durdar Crossroads South To The Crownstone Bridge

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2023 and could run through until 29 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 5 Jul 2023 at 09:59.

Cumberland Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Devonshire Street

Cumberland Council are proposing to carry out Highway improvement works on Devonshire Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2023 and could run through until 30 April 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 31 May 2023 at 13:48.

Cumberland Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Devonshire Street

Cumberland Council are proposing to carry out Highway improvement works on Devonshire Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2023 and could run through until 30 April 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 8 Jun 2023 at 09:11.

Cumberland Council logo
LONG TERM
Between
8 Oct 2023 and 29 May 2025
Details
View Map
Share
Follow
Peter Lane

Cumberland Council are proposing to carry out roadworks on Peter Lane, Newby West.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 October 2023 and could run through until 29 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 12 Jul 2023 at 17:07.

The Environment Agency logo
LONG TERM
Between
12 Nov 2023 and 24 May 2024
Details
View Map
Share
Follow
Adelaide Street

The Environment Agency are proposing to carry out Section 50 on Adelaide Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2023 and could run through until 24 May 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by The Environment Agency on 22 Aug 2023 at 13:21.

Cumberland Council logo
LONG TERM
Until
21 Jun 2024
Details
View Map
Share
Follow
Water Street

Cumberland Council are carrying out Highway repair and maintenance works on Water Street, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 08:00 and could run through until 21 June 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 18 Dec 2023 at 16:59.

The Environment Agency logo
LONG TERM
Between
8 Jan and 31 May 2024
Details
View Map
Share
Follow
Adelaide Street

The Environment Agency are proposing to carry out Section 50 on Adelaide Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by The Environment Agency on 7 Nov 2023 at 14:07.

The Environment Agency logo
LONG TERM
Until
14 Jun 2024
Details
View Map
Share
Follow
Adelaide Street

The Environment Agency are carrying out Section 50 on Adelaide Street, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 January 2024 at 10:00 and could run through until 14 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by The Environment Agency on 31 Jan 2024 at 14:54.

Cumberland Council logo
LONG TERM
Until
11 May 2024
Details
View Map
Share
Follow
Newby Cross Village

Cumberland Council are carrying out Highway improvement works on Newby Cross Village, Newby Cross.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 January 2024 at 04:00 and could run through until 11 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 4 Apr 2024 at 17:03.

Cumberland Council logo
LONG TERM
Until
12 Jul 2024
Details
View Map
Share
Follow
Devonshire Street

Cumberland Council are carrying out Highway improvement works on Devonshire Street, Carlisle.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2024 at 09:00 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 9 Feb 2024 at 10:49.

Cumberland Council logo
LONG TERM
Until
25 May 2024
Details
View Map
Share
Follow
Road Leading From Brisco To Wreay

Cumberland Council are carrying out Highway improvement works on Road Leading From Brisco To Wreay, Wreay.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2024 at 08:00 and could run through until 25 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 25 Apr 2024 at 11:18.

Cumberland Council logo
LONG TERM
Until
24 May 2024
Details
View Map
Share
Follow
Peter Lane

Cumberland Council are carrying out Highway improvement works on Peter Lane, Newby West.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 February 2024 at 08:00 and could run through until 24 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 28 Mar 2024 at 14:46.

Cumberland Council logo
LONG TERM
Until
30 Jun 2024
Details
View Map
Share
Follow
Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite

Cumberland Council are carrying out roadworks on Road Leading From Newbiggin Road South To Greenlands Farm Via Burthwaite, Wreay.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 March 2024 at 07:00 and could run through until 30 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 12 Mar 2024 at 16:17.

Cumberland Council logo
LONG TERM
Between
18 Mar and 14 Jun 2024
Details
View Map
Share
Follow
Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Kingmoor Road Junction To Bridge South Of Rockcliffe Estate, Cargo.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2024 and could run through until 14 June 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cumberland Council on 20 Feb 2024 at 11:14.

Northern Gas Networks logo
LONG TERM
Until
10 May 2024
Details
View Map
Share
Follow
Yewdale Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Yewdale Road, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 08:00 and could run through until 10 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 25 Mar 2024 at 08:53.

Northern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
London Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2024 and could run through until 29 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Jan 2024 at 10:48.

Cumberland Council logo
LONG TERM
Until
6 May 2024
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are carrying out roadworks on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 March 2024 at 07:00 and could run through until 6 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 25 Mar 2024 at 14:30.

Cumberland Council logo
LONG TERM
Between
31 Mar and 29 Jun 2024
Details
View Map
Share
Follow
English Street

Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 29 June 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Cumberland Council on 8 Jun 2023 at 09:13.

Cumberland Council logo
LONG TERM
Between
31 Mar and 29 Jun 2024
Details
View Map
Share
Follow
Citadel Row

Cumberland Council are proposing to carry out Highway improvement works on Citadel Row, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 29 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 7 Jun 2023 at 10:56.

Cumberland Council logo
LONG TERM
Between
31 Mar and 30 Aug 2024
Details
View Map
Share
Follow
Victoria Viaduct

Cumberland Council are proposing to carry out Highway improvement works on Victoria Viaduct, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 16 Jun 2023 at 13:44.

Cumberland Council logo
LONG TERM
Between
31 Mar and 30 Aug 2024
Details
View Map
Share
Follow
English Street

Cumberland Council are proposing to carry out Highway improvement works on English Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2024 and could run through until 30 August 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Cumberland Council on 3 Aug 2023 at 13:50.

Northern Gas Networks logo
LONG TERM
Until
10 May 2024
Details
View Map
Share
Follow
Dalston Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Dalston Road, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 April 2024 at 08:00 and could run through until 10 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 8 Apr 2024 at 12:48.

Northern Gas Networks logo
LONG TERM
Until
5 Aug 2024
Details
View Map
Share
Follow
Durdar Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Durdar Road, Carlisle.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 April 2024 at 07:00 and could run through until 5 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 10 Apr 2024 at 07:02.

Northern Gas Networks logo
Until
10 May 2024
Details
View Map
Share
Follow
Birdoswald Drive

Northern Gas Networks are carrying out Utility repair and maintenance works on Birdoswald Drive, Carlisle.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 April 2024 at 07:00 and could run through until 10 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 15 Apr 2024 at 07:05.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Blundell Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Blundell Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 30 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Jan 2024 at 13:31.

Northern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
London Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 30 April 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 19 Jan 2024 at 13:23.

Electricity North West (NorWeb) logo
Between
22 Apr and 20 May 2024
Details
View Map
Share
Follow
Viaduct Estate Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Viaduct Estate Road, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2024 and could run through until 20 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Mar 2024 at 10:12.

Cumberland Council logo
LONG TERM
Between
24 Apr and 12 Jul 2024
Details
View Map
Share
Follow
Lowther Street

Cumberland Council are proposing to carry out Highway improvement works on Lowther Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2024 and could run through until 12 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 3 Nov 2023 at 15:46.

Northern Gas Networks logo
Between
29 Apr and 17 May 2024
Details
View Map
Share
Follow
Cartmel Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cartmel Drive, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 17 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 Mar 2024 at 11:35.

Cumberland Council logo
Between
29 Apr and 19 May 2024
Details
View Map
Share
Follow
Durdar Road

Cumberland Council are proposing to carry out Highway improvement works on Durdar Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 19 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 8 Feb 2024 at 15:59.

Cumberland Council logo
LONG TERM
Between
29 Apr and 17 Jun 2024
Details
View Map
Share
Follow
Road Leading From Durdar Crossroads South To The Crownstone Bridge

Cumberland Council are proposing to carry out roadworks on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 17 June 2024. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 25 Apr 2024 at 15:27.

Cumberland Council logo
LONG TERM
Between
30 Apr and 29 Jul 2024
Details
View Map
Share
Follow
Botchergate

Cumberland Council are proposing to carry out Highway improvement works on Botchergate, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2024 and could run through until 29 July 2024. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Cumberland Council on 7 Jun 2023 at 10:55.

Northern Gas Networks logo
Between
6 and 24 May 2024
Details
View Map
Share
Follow
Lodore Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodore Drive, Carlisle.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2024 and could run through until 24 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 Mar 2024 at 11:34.

Northern Gas Networks logo
Between
7 and 24 May 2024
Details
View Map
Share
Follow
Mayfield

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mayfield, Blackwell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 24 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Mar 2024 at 10:08.

Cumberland Council logo
LONG TERM
Between
7 May and 1 Dec 2024
Details
View Map
Share
Follow
Road Leading From Stoneraise Through Ratten Row

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Stoneraise Through Ratten Row, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 25 Apr 2024 at 11:37.

Northern Gas Networks logo
Between
13 May and 7 Jun 2024
Details
View Map
Share
Follow
Dalston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Dalston Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 7 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 Nov 2023 at 08:49.

Electricity North West (NorWeb) logo
Between
13 and 17 May 2024
Details
View Map
Share
Follow
Back Of Cecil Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Back Of Cecil Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2024 and could run through until 17 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Mar 2024 at 09:41.

Northern Gas Networks logo
Between
14 and 27 May 2024
Details
View Map
Share
Follow
Warwick Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Warwick Road, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 27 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 24 Apr 2024 at 08:12.

Northern Gas Networks logo
Between
14 and 27 May 2024
Details
View Map
Share
Follow
Rotary Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Rotary Way, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 27 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2024 at 10:02.

Northern Gas Networks logo
Between
14 and 26 May 2024
Details
View Map
Share
Follow
Montgomery Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Montgomery Way, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 May 2024 and could run through until 26 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 23 Apr 2024 at 11:44.

Northern Gas Networks logo
LONG TERM
Between
20 May and 21 Jun 2024
Details
View Map
Share
Follow
Housesteads Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Housesteads Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 21 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 Mar 2024 at 11:30.

Northern Gas Networks logo
Between
20 May and 7 Jun 2024
Details
View Map
Share
Follow
Eden Bridge

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Eden Bridge, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 7 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Apr 2024 at 07:28.

Northern Gas Networks logo
Between
20 and 22 May 2024
Details
View Map
Share
Follow
Backhouses Walk

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Backhouses Walk, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 May 2024 and could run through until 22 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 4 Apr 2024 at 08:51.

Cumberland Council logo
Between
25 May and 7 Jun 2024
Details
View Map
Share
Follow
Road Leading From Pow Bank To Durdar Crossroads

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Pow Bank To Durdar Crossroads, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 May 2024 and could run through until 7 June 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 25 Apr 2024 at 11:23.

Fibrus Networks logo
Between
27 and 29 May 2024
Details
View Map
Share
Follow
From The C1037 To The C1041 At Wreay

Fibrus Networks are proposing to carry out Utility asset works on From The C1037 To The C1041 At Wreay, Wreay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 29 May 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Fibrus Networks on 25 Apr 2024 at 08:05.

Electricity North West (NorWeb) logo
Between
27 May and 4 Jun 2024
Details
View Map
Share
Follow
Road Leading From Kirkbampton To Langwath Cottage Junction Via Thurstonfield

Electricity North West (NorWeb) are proposing to carry out New service connection on Road Leading From Kirkbampton To Langwath Cottage Junction Via Thurstonfield, Thurstonfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 25 Apr 2024 at 11:38.

Cumberland Council logo
Between
28 May and 14 Jun 2024
Details
View Map
Share
Follow
Beverley Rise

Cumberland Council are proposing to carry out Highway improvement works on Beverley Rise, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 14 June 2024. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 4 Mar 2024 at 14:08.

Northern Gas Networks logo
Between
28 May and 21 Jun 2024
Details
View Map
Share
Follow
Low Moor Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Moor Avenue, Blackwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 21 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Mar 2024 at 10:09.

Northern Gas Networks logo
LONG TERM
Between
28 May and 19 Jul 2024
Details
View Map
Share
Follow
Stockwell Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Stockwell Road, Blackwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 19 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 18 Mar 2024 at 09:56.

Cumberland Council logo
LONG TERM
Between
1 Jun and 9 Aug 2024
Details
View Map
Share
Follow
Victoria Viaduct

Cumberland Council are proposing to carry out Highway improvement works on Victoria Viaduct, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2024 and could run through until 9 August 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 28 Mar 2024 at 18:24.

Northern Gas Networks logo
LONG TERM
Between
3 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Scotland Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scotland Road, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 5 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 28 Mar 2024 at 09:41.

Northern Gas Networks logo
Between
3 and 19 Jun 2024
Details
View Map
Share
Follow
Queen Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Queen Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 19 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2024 at 13:02.

Northern Gas Networks logo
Between
3 and 28 Jun 2024
Details
View Map
Share
Follow
Castlesteads Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castlesteads Drive, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 1 Mar 2024 at 11:34.

Cumberland Council logo
LONG TERM
Between
8 Jun and 9 Sep 2024
Details
View Map
Share
Follow
Dalston Road

Cumberland Council are proposing to carry out Highway improvement works on Dalston Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 June 2024 and could run through until 9 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 25 Apr 2024 at 11:28.

Cumberland Council logo
Between
10 and 16 Jun 2024
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Cumberland Council are proposing to carry out Utility asset works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 16 June 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 17 Apr 2024 at 17:21.

Northern Gas Networks logo
Between
10 and 24 Jun 2024
Details
View Map
Share
Follow
Milbourne Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Milbourne Street, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 24 June 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2024 at 13:06.

Cumberland Council logo
Between
17 Jun and 5 Jul 2024
Details
View Map
Share
Follow
A595 Crofton Bridge To Junction With B5302

Cumberland Council are proposing to carry out Highway repair and maintenance works on A595 Crofton Bridge To Junction With B5302, West Woodside.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 5 July 2024. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 21 Mar 2024 at 13:19.

Cumberland Council logo
Between
17 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Dalston Road

Cumberland Council are proposing to carry out Works for road purposes on Dalston Road, Carlisle.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 22 Mar 2024 at 15:17.

Northern Gas Networks logo
LONG TERM
Between
17 Jun and 19 Jul 2024
Details
View Map
Share
Follow
Castle Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Castle Way, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2024 at 13:09.

Northern Gas Networks logo
Between
17 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Devonshire Walk

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Devonshire Walk, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 5 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2024 at 13:10.

Northern Gas Networks logo
LONG TERM
Between
17 Jun and 19 Jul 2024
Details
View Map
Share
Follow
Bridge Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridge Street, Carlisle.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 22 Jan 2024 at 13:07.

Cumberland Council logo
LONG TERM
Between
24 Jun 2024 and 1 Dec 2025
Details
View Map
Share
Follow
Court Square

Cumberland Council are proposing to carry out Works for road purposes on Court Square, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 1 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cumberland Council on 19 Apr 2024 at 12:54.

Cumberland Council logo
LONG TERM
Between
1 Jul and 1 Aug 2024
Details
View Map
Share
Follow
Backhouses Walk

Cumberland Council are proposing to carry out Highway improvement works on Backhouses Walk, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 1 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cumberland Council on 23 Apr 2024 at 08:08.

Cumberland Council logo
Between
1 and 5 Jul 2024
Details
View Map
Share
Follow
Road Leading From District Boundary To Junction North Of Orton Rigg Via Woodhouses

Cumberland Council are proposing to carry out Highway repair and maintenance works on Road Leading From District Boundary To Junction North Of Orton Rigg Via Woodhouses, Great Orton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 5 July 2024. The works will impact the verge only.

This roadwork event was last updated by Cumberland Council on 14 Mar 2024 at 10:05.

United Utilities Water (formerly North West Water) logo
Between
10 and 14 Jul 2024
Details
View Map
Share
Follow
Longlands Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Longlands Road, Carlisle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 July 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Apr 2024 at 09:23.

Cumberland Council logo
LONG TERM
Between
22 Jul and 1 Sep 2024
Details
View Map
Share
Follow
Road Leading From Durdar Crossroads South To The Crownstone Bridge

Cumberland Council are proposing to carry out Highway improvement works on Road Leading From Durdar Crossroads South To The Crownstone Bridge, Durdar.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 1 September 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cumberland Council on 7 Dec 2023 at 16:37.

Electricity North West (NorWeb) logo
Between
22 Jul and 9 Aug 2024
Details
View Map
Share
Follow
Road Leading From Brisco Crossroads To Motorway Roundabout

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Road Leading From Brisco Crossroads To Motorway Roundabout, Durdar.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 9 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Apr 2024 at 10:30.


Roadworks Map near to Carlisle Road, CARLISLE, CA5 7NG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 26 Apr 2024 05:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Carlisle Road, CARLISLE, CA5 7NG (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.