PARLIAMENTARY WRITTEN QUESTION
M27: Repairs and Maintenance (4 December 2017)
Question Asked
Asked by:
Stephen Morgan (Labour)
Answer
The first Road Investment Strategy funded Highways England to develop a smart motorway scheme for Junctions 4-11 of the M27; they are currently designing that scheme and engaging with local and technical stakeholders.
The M27 between junctions 11 (Fareham) and 12 (Portsmouth) was upgraded with climbing lanes (for heavy goods vehicles) in 2008. Any extension of the smart motorway scheme to reach Junction 12 would be considered for inclusion in the second Road Investment Strategy (RIS2). Decisions on RIS2 will draw on evidence which Highways England has collected about the performance of the Strategic Road Network and its future needs; the Department will consult on Highways England’s initial report shortly.
Answered by:
Jesse Norman (Conservative)
11 December 2017
Contains Parliamentary information licensed under the Open Parliament Licence v3.0.