PARLIAMENTARY WRITTEN QUESTION
M1: Exhaust Emissions (23 January 2017)

Question Asked

To ask the Secretary of State for Transport, what estimate he has made of levels of (a) nitrogen dioxide, (b) particulate and (c) other pollution between junctions 33 and 34 of the M1 motorway; what he plans those levels to be at that location once the M1 becomes a Smart motorway there; and what estimate he has made of the potential for reduction in those levels from planned mitigation measures.

Asked by:
Mr Clive Betts (Labour)

Answer

Smart Motorways are at the core of Highways England’s £15bn investment programme to transform England’s Strategic Road Network, helping to ease congestion and improve traffic flow. Keeping traffic moving reduces stop-start decelerations and accelerations, which in itself has air quality benefits.

Highways England will announce any measures to improve air quality on the M1 between junctions 32-35a when the Smart Motorway scheme opens, which is expected to be in March 2017.

Highways England has undertaken environmental assessments of the scheme during the design and construction. These are available on Highways England’s website.


Answered by:
Sir John Hayes (Conservative)
26 January 2017

Contains Parliamentary information licensed under the Open Parliament Licence v3.0.