PARLIAMENTARY WRITTEN QUESTION
Midland Main Line: Electrification (22 June 2015)
Question Asked
Asked by:
Lilian Greenwood (Labour)
Answer
Work undertaken to enable the electrification of the Midland Main line includes detailed design, bridge construction and some of the piling for overhead masts. The financial value of work undertaken by the Department before the project was included in the 2012 High Level Output Specification cannot be differentiated from other development work undertaken in preparation for the Specification.
Answered by:
Claire Perry (Conservative)
25 June 2015
Contains Parliamentary information licensed under the Open Parliament Licence v3.0.