Question Asked

To ask the Secretary of State for Energy Security and Net Zero, pursuant to the answer of 17 December 2024 to question 19898 on Wind Power: Fylde, what account the cost assessments have taken of existing infrastructure connecting Stanah to Penwortham.

Asked by:
Mr Andrew Snowden (Conservative)

Answer

National Energy System Operator (NESO) recommended the transmission infrastructure required to connect Morgan and Morecambe offshore wind projects to the grid as part of its Holistic Network Design (HND). In producing the HND, NESO assessed multiple onshore and offshore design options against future generation and demand scenarios, existing infrastructure in the National Electricity Transmission System, and total capital and operational costs. NESO then used an economic optimiser to determine the optimal economic design from the options.