PARLIAMENTARY WRITTEN QUESTION
A483: Shropshire (12 March 2024)
Question Asked
Asked by:
Helen Morgan (Liberal Democrat)
Answer
As referenced in PMQs on October 25 2023, National Highways is conducting extensive study work to understand how the safety performance of the A483 in Shropshire can be improved through a detailed route optimisation study. These proposals will be considered alongside other potential small-scale future targeted safety enhancements to the route as part of RIS3 (2025-2030). At this stage, a more substantive upgrade of the A483 between Pant and Llanymynech remains in the RIS Pipeline of schemes being considered for possible delivery beyond 2030.
Answered by:
Guy Opperman (Conservative)
15 March 2024
Contains Parliamentary information licensed under the Open Parliament Licence v3.0.