PARLIAMENTARY WRITTEN QUESTION
Vetting: Standards (24 January 2024)
Question Asked
Asked by:
Rosie Duffield (Independent)
Answer
DBS publishes its performance data on a quarterly basis. For the third quarter of 2023-24, DBS achieved the following performance:
The target to process 85% of Basic checks within 2 days was met, with an average attainment of 88.1%. The 85% target was met on day 2 and the average turnaround time was 0.9 days.
The target to process 85% of Standard checks within 5 days was met, with an average attainment of 88.5%, the 85% target was met on day 3 and the average turnaround time was 1.5 days.
The target to process 80% of Enhanced checks within 14 days was not met during the quarter, with an average attainment of 76.7%. The 80% target was met on day 18 and the average turnaround time was 11.5 days.
For the Canterbury constituency, the average turnaround time between 1/04/2023 and 31/12/2023 was 19.8 days for Enhanced checks and 1.3 days for Standard checks.
For the Kent, the average turnaround time between 1/04/2023 and 31/12/2023 was 19.9 days for Enhanced checks and 1.3 days for Standard checks.
Answered by:
Laura Farris (Conservative)
29 January 2024
Contains Parliamentary information licensed under the Open Parliament Licence v3.0.