Bridges: Stockport (6 September 2023)
Question Asked
Asked by:
Navendu Mishra (Labour)
Answer
Network Rail maintain a rigorous cyclical inspection process for all their bridges and structures, which includes Stockport Viaduct. The most recent detailed inspection of the viaduct was conducted over 2018/2019, to ensure its continued safety and structural integrity. These detailed inspections take place every six years, with visual examinations being completed by Network Rail’s structural engineers once a year. Network Rail’s structures team have confirmed that some brick work repairs are planned later this year, with additional drainage repairs scheduled to take place in 2024.
Answered by:
Huw Merriman (Conservative)
11 September 2023