PARLIAMENTARY WRITTEN QUESTION
South Western Railway: Timetables (23 November 2021)

Question Asked

To ask the Secretary of State for Transport, if he will publish the timeframe for the (a) publication of the results of the South Western Railway and Network Rail stakeholder consultation and (b) implementation of proposed December 2022 timetable changes on South Western Railway.

Asked by:
Marsha De Cordova (Labour)

Answer

South Western Railway (SWR), Network Rail (NR) and the Department are currently analysing the feedback from the consultation with the aim of NR and SWR publishing a report together with details on next steps by the end of the calendar year.

I recently spoke about the estimated cost savings as a result of the proposed timetable changes on SWR at an adjournment debate and followed this with a letter which is available in the Libraires of the House.

The Department has already published correspondence between the Department and senior SWR representatives which is available online at: www.gov.uk/government/publications/dft-foi-disclosure-log-2021.

The Department has not carried out any assessments into the carbon impact of SWR running a reduced timetable compared to pre-pandemic service levels, and there are no proposed reductions in headcount as a result of the December 2022 timetable proposals.


Answered by:
Chris Heaton-Harris (Conservative)
30 November 2021

Contains Parliamentary information licensed under the Open Parliament Licence v3.0.