High Speed 2 Line: Construction (8 July 2021)
Question Asked
Asked by:
Esther McVey (Conservative)
Answer
The latest estimate for the total permanent and temporary land requirement for the HS2 scheme, across Phases One, 2a and 2b (Western Leg), is 129.47 sqkm (this will include a degree of overlap between phases).
This is broken down between phases as follows, noting that the figures for the land required for Phase One and 2a are based on the design as at Royal Assent of the hybrid Bills for those phases, while the estimate for Phase 2b (Western Leg) is at a much lower level of design maturity as temporary and permanent land requirements for the scheme are being refined. The current estimates are as follows:
Phase 1 – 68.74 sqkm (excludes depots at Langley and Longsite)
Phase 2a – 29.20 sqkm
Phase 2b west – 31.53 sqkm
Answered by:
Andrew Stephenson (Conservative)
16 July 2021