NHS Digital: Electricity Generation (13 March 2019)
Question Asked
Asked by:
Gareth Snell (Labour)
Answer
NHS Digital has advised that back-up power generation systems are in place at the following locations:
- Leeds - last load bank test carried out on 6 March 2019; and
- Exeter - last load bank test carried out on 25 June 2018.
Answered by:
Dame Jackie Doyle-Price (Conservative)
21 March 2019