PARLIAMENTARY DEBATE
Building Safety Bill (Thirteenth sitting) - 21 October 2021 (Commons/Public Bill Committees)
Debate Detail
Chair(s) Philip Davies, †Peter Dowd, Clive Efford, Mrs Maria Miller
Members† Amesbury, Mike (Weaver Vale) (Lab)
† Bailey, Shaun (West Bromwich West) (Con)
Baillie, Siobhan (Stroud) (Con)
† Byrne, Ian (Liverpool, West Derby) (Lab)
† Cadbury, Ruth (Brentford and Isleworth) (Lab)
† Clarke, Theo (Stafford) (Con)
† Clarke-Smith, Brendan (Bassetlaw) (Con)
† Cooper, Daisy (St Albans) (LD)
† Hopkins, Rachel (Luton South) (Lab)
† Hughes, Eddie (Walsall North) (Con)
† Logan, Mark (Bolton North East) (Con)
† Mann, Scott (Lord Commissioner of Her Majesty’s Treasury)
Osborne, Kate (Jarrow) (Lab)
† Pincher, Christopher (Tamworth) (Con)
† Rimmer, Ms Marie (St Helens South and Whiston) (Lab)
† Saxby, Selaine (North Devon) (Con)
† Young, Jacob (Redcar) (Con)
ClerksYohanna Sallberg, Adam Mellows-Facer, Abi Samuels, Committee Clerks
† attended the Committee
Public Bill CommitteeThursday 21 October 2021
(Morning)
[Peter Dowd in the Chair]
Building Safety BillQuestion proposed, That the clause stand part of the Bill.
The Government are committed to ensuring that leases reflect the duties and obligations placed on landlords and tenants to keep buildings safe, and that the costs associated with the regime are fair and transparent. Clause 120 implies terms relating to building safety into leases, so that both landlord and tenant have obligations associated with the new regime clearly set out in their leases. This cements the duties set out in other parts of the Bill.
Clause 120 also ensures that the landlord passes costs associated with the new regulatory regime, via the building safety charge, to leaseholders with long leases of seven years or more. The overriding principle behind the building safety charge is to give leaseholders further information about what they are paying for to keep the building safe and assurance that the manager of the building is charging reasonably. Without the building safety charge, many of these costs would be charged via a service charge. We are introducing this separate mechanism to deliver greater protection to leaseholders, ensuring that costs are transparent and reasonable. By introducing the building safety charge, the Government are ensuring that costs are clearly set out to leaseholders and that certain costs, such as the cost of enforcement against an accountable person, can never be recovered from leaseholders. In well-run buildings, leaseholders will likely see costs partially offset by a corresponding reduction in service charge costs.
Schedule 7 will enable the Government to set out certain obligations for the landlord to fulfil, including providing details of the building safety charge together with a summary of their rights and obligations to leaseholders. Schedule 7 will also give leaseholders the right to request further information about the charge, and they will be able make a written request for a summary of the relevant building safety costs. Once a summary has been obtained, the leaseholder can request more detailed accounts.
We expect that the protections included around the building safety charge will provide the necessary transparency to drive competition to reduce costs for leaseholders. Leaseholders will be able to challenge the costs associated with keeping a building safe in the same way as they can challenge the costs of unreasonable service charges—that is, through the first-tier tribunal.
Clause 120 is key to ensuring the smooth implementation of the new regulatory regime. Setting out further requirements in respect of the building safety charge in secondary legislation—for example, on the obligations of landlords, consultation requirements and excluded costs—ensures that the provisions remain relevant and responsive to changes in the duties of the accountable person or broader leasehold reform. Leasehold law is a highly technical policy area, and it would be inappropriate and counterproductive to include it in the Bill.
We wish to make it clear that remedial costs are not included in the building safety charge. This clause does not make leaseholders liable for the costs of remedial works. Whether or not leaseholders are liable for works is governed by the terms of their existing leases. Clause 120 is vital to ensure transparency on the costs of the new regime, empowering leaseholders to interrogate bills and hold their building owner to account.
I have a number of questions. The building safety charge has proved to be somewhat controversial among leaseholders, residents, tenants and cladding campaigners—the UK Cladding Action Group, the Leasehold Knowledge Partnership, the National Leasehold Campaign and so on. The Minister has mentioned that charges will be fair and transparent. What is the definition of fair and transparent? What is the Department’s assessment of what will be fair and transparent? Given that on 17, if not 18, occasions a promise was made not to put charges for historical remediation costs, which we will get on to in a moment, on to the shoulders of leaseholders, there is a real fear that there could be considerable interplay between the building safety charge, historical remediation costs, service charges and so forth. I would like the Minister to expand on that. Of course, many leaseholders over the past two weeks have had massive invoices arrive through the door for remedial costs relating to historical building safety defects. Some are going bankrupt, as I know he and Department officials will know.
With regard to what might be considered fair, I genuinely feel that, as the system develops people will be able to see within one building what amount is being charged for a particular service or constituent elements of it, and to make a direct comparison with other buildings, how they are being managed and what charges are being applied. They will then be able to use that as evidence to challenge their own bill in the future. Ensuring that people can challenge their bill and ask for further details will be pivotal to the success of the process.
Question put and agreed to.
Clause 120 accordingly ordered to stand part of the Bill.
Schedule 7 agreed to.
Clause 121
Provision of building safety information
Question proposed, That the clause stand part of the Bill.
The clause amends the Landlord and Tenant Act 1987 by placing a requirement on landlords to include relevant building safety information when giving a tenant a written demand for payment. If the relevant building safety information is not provided with the written demand, any amount demanded, other than in respect of rent, will not be treated as due until such time as the information is provided. The clause specifies that the relevant building safety information will include information about the higher-risk status of the building, and the name and contact details of each person responsible for building safety in their buildings, including details of the Building Safety Regulator. It also makes an exception to those requirements where a court or tribunal-appointed receiver or manager is in place.
Finally, clause 121 allows the Secretary of State to prescribe additional information that must be included in the notice or the written demand. These are key provisions to ensure that tenants have access to vital building safety information about their building—an important principle of our new reforms, which give residents a more transparent understanding of their building’s safety information.
Question put and agreed to.
Clause 121 accordingly ordered to stand part of the Bill.
Clause 122
Amendments to the Commonhold and Leasehold Reform Act 2002
Clause 122 amends the Commonhold and Leasehold Reform Act 2002 to ensure that building safety management is adequately considered in higher-risk commonhold buildings. As per clause 69, the commonhold association will be the accountable person and will be subject to the fire and structural safety building regime. Clause 122 makes it mandatory for a commonhold association to include in its commonhold community statement provision to ensure compliance with its duties under part 4 of the Bill. It also makes amendments to the Commonhold and Leasehold Reform Act 2002 to ensure that the directors of the commonhold association make an annual estimate of the income required to meet the building safety expenses. That must be detailed in the commonhold community statement of a higher-risk commonhold building.
The clause also ensures that each commonhold unit holder makes payments in relation to building safety expenses to meet the building safety expenses income requirement. The amendments made by the clause are necessary to ensure that the commonhold legislation aligns with the Bill’s requirements.
Question put and agreed to.
Clause 122 accordingly ordered to stand part of the Bill.
Clause 123
Interpretation of part 4
Question proposed, That the clause stand part of the Bill.
“a risk to the safety of people in or about a building”
due to “the spread of fire” or “structural failure”. We see those definitions as appropriate and considered, and they are an important addition to aid the understanding of the various clauses that refer to those terms. The clause provides for a specific place in part 4 that can act as a helpful index of the defined terms used in said part.
Question put and agreed to.
Clause 123 accordingly ordered to stand part of the Bill.
Clause 58 ordered to stand part of the Bill.
Clause 124
Service charges in respect of remediation works
Question proposed, That the clause stand part of the Bill.
The Government are committed to ensuring that landlords exhaust all other avenues of cost recovery before billing leaseholders, and this clause puts that commitment in statute. It places a new legislative requirement on landlords to take reasonable steps to pursue other cost recovery avenues before passing on the cost of remediation works to leaseholders. We know that some building owners are not fully exploring all the cost recovery avenues and are passing costs on to leaseholders as a default. Many are, but too many are not. The clause will help to bring those unfair practices to an end.
The clause will enable the Secretary of State to prescribe the reasonable steps that the landlord must take, and how that landlord can demonstrate to leaseholders that they have taken them. Landlords will need to comply with guidance issued by the Secretary of State, which will provide clarity on the reasonable steps that the landlord must take. The guidance should act as an important resource for all leaseholders and landlords alike, providing clarity and transparency for landlords, and assurances for leaseholders that the requirements have been met.
The clause also requires landlords to provide leaseholders with details of the steps that they are taking and their reasons for their course of action. The Government will be able to prescribe in regulations the information that must be provided to leaseholders. That will mean that leaseholders have sufficient understanding of decisions taken about their building and why any remediation costs have been passed on to them. Landlords will be required to have regard to observations made by leaseholders or a recognised tenants association.
The clause contains a power to define the scope of works that can be classified as remediation works for the purposes of this clause. That will ensure that the Government have sufficient flexibility to make sure that works defined as remediation works are those that are essential for ensuring that buildings are safe. We will define remediation works and relevant buildings in secondary legislation, and that will create scope to amend the regulations at pace, so that they remain relevant and respond to changes in our analysis of risk over time.
The clause is vital to ensuring that all possible avenues for funding remedial works are explored by the landlord and evidenced to the leaseholder before any remediation costs are sought from them. Leaseholders should not have to pay for works when there are other routes for funding. I commend the clause to the Committee.
In principle, the clause seems to be a step forward, but in reality, it will hardwire into the Bill the injustice that thousands—indeed, millions—of people are familiar with: they are trapped in their properties, and the Bill will ensure that historical remediation falls on the shoulders of leaseholders. The Ministers and the Department have been in a difficult position because it looks as though the Treasury’s door has been closed to any further financial progress.
“I am ruined. Shared owner (50% for £63,000) and in May was billed £101,500 for remedial works. Block 13.5m tall so doesn’t qualify for BSF but possibly new loan scheme that’ll take 161 years to repay. Madness!”
That is a perfect example of what we are talking about. The clause hardwires unfairness into the Bill. As my hon. Friend the Member for Luton South has just mentioned, many leaseholders will be in the same position as Mr Matthews. How can that be fair?
“15 months in the BSF”—
that is, the building safety fund—
“application process. Our managing agent/FH”—
that is, the freeholder—
“won’t agree to the BSF terms (likely those requiring the FH guarantee the works be done to an acceptable standard). The joys of the leasehold system—you own nothing, you control nothing + you pay everything.”
How will the clause solve the problem when that particular landlord—the freeholder in this case—has already decided that they have exhausted the process? The levy is thousands and thousands of pounds, and people are going bankrupt in the current climate. How will this move things forward?
The Government have already committed a significant amount of public money to the remediation of unsafe tall buildings—£5.1 billion—and I am sure we will discuss these matters further when we come to the new clauses tabled by various members of the Committee, so there will be several opportunities to come back to this point.
I am grateful to Committee members for their questions. Clause 124 is key to making certain that the landlord explores and evidences to the leaseholder—that is very important—all possible avenues for funding remedial works before any remediation costs are sought from the leaseholder. I commend the clause to the Committee.
Question put and agreed to.
Clause 124 accordingly ordered to stand part of the Bill.
Clause 125
Duties relating to work to dwellings etc
Question proposed, That the clause stand part of the Bill.
The clause expands the Defective Premises Act by inserting proposed new section 2A into it. The new section will create a duty to ensure that any work done to a dwelling does not render that dwelling unfit for habitation. It will cover subsequent works done to the building after construction. The clause applies where a person takes on work in relation to any part of a relevant building in the course of a business. That means that it does not apply, for example, to homeowners doing work on their own properties. As in the case of the 1972 Act, the person to whom the duty is owed—the person who has the right to bring a claim—is the person for whom the work is done and any person who holds or subsequently acquires a legal or equitable interest in a dwelling in the building. That includes the freeholder of a block of flats as well as leaseholders.
The “fit for habitation” test is the same test used in the 1972 Act. Subcontractors also owe the same duty for the work that they take on. The clause applies to any relevant building defined as a building consisting of or containing one or more dwellings. The new provision will apply to work completed after the clause comes into force. Clause 126 will provide for a 15-year limitation period in relation to this clause.
The Minister referred to case law. Others have referred to the nightmare of litigation and the costs in a David and Goliath process. How many claims have been made under the existing regime? The Minister referred to the existing case law, so I am assuming that the Department has made an assessment.
The hon. Gentleman mentioned the evidence given eloquently by Justin Bates—I think that was his name; I apologise if I have got that wrong.
Question put and agreed to.
Clause 125 accordingly ordered to stand part of the Bill.
Clause 126
Limitation periods
This amendment changes the period for claims under the Defective Premises Act 1972 and the Building Act 1984 to 30 years.
It is important that we do not mistake this change to the Defective Premises Act as giving more than some relief to a small number of leaseholders and residents in the current building safety crisis. Many of their building owners have become insolvent, as Ministers know. As has been mentioned, many leaseholders will simply not be able to tie themselves up in lengthy legal battles with wealthy developers. The Government must fund remediation up front. That does not require a Bill—it is a political decision. The polluter pays principle should be used to recoup the costs. That is the only way to address this.
Our time is certainly not wasted in this Committee Room. Over the last few weeks we have discussed some really good, solid, life-changing proposals and clauses, but the Bill does not address the fundamental principle of polluter pays. The amendment would certainly strengthen the clause. We might not believe it, but sometimes people listen to our debates, read Hansard and go through it line by line, so it is important that collectively we show this place at its best, give life to people’s voices and pass the amendment.
I have had the honour and pleasure to represent Brentford for over 30 years, and a lot of new homes have been developed during that time. My office is keeping tabs on construction issues with blocks of flats, including those in Brentford ward. I can tell which blocks have required no casework during all my years of representation—it is those that were built more than 30 years ago under a regime of good quality construction and in a culture of safety. Those constructed after that were built at a time when standards were starting to fall. The culture of competition and the privatisation of building control meant that there was price competition and a reduction in inspections. There was the demise of the role of the clerk of works, corners were cut, and there was a skills shortage in the construction industry. Taken together, as we have said many times, that created this crisis. My casework shows that well over 25 separate estates in my constituency that were built in the last 20 years—since around 2000—have issues with cladding, lack of compartmentalisation, and shoddy workmanship.
I also picked up casework on damp and safety as a councillor. I will give two examples Even before Grenfell, leaseholders at Holland Gardens, which was built by Barratt, had forced Barratt to replace all the window fixings because they had not been done properly. It was subsequently found that the building had flammable cladding, so scaffolding was put up again. I have already mentioned the Paragon, which was built in about 2003. We do not know what its future is, but it is empty because it is too dangerous to occupy. I absolutely endorse the amendment’s aim of extending the timescale from 15 to 30 years. There is so much evidence. I can see it on my own patch, but we all have evidence.
The metaphor of David and Goliath comes to mind. If the Government are committed to supporting leaseholders who, through no fault of their own, have found themselves in very difficult situations with regard to their homes, the period of time that we are talking about should be longer. That could have a life-changing effect on people working in our communities—we are talking about social workers and teachers—who may be made bankrupt, and who may therefore lose their professional accreditation and no longer be able to work. As one small step among many that we are trying to take, the Government’s acceptance of this amendment would be life-affirming for so many of our leaseholders. I urge the Government to consider it carefully and adopt the 30-year period.
The Defective Premises Act 1972 applies not simply to the tall buildings that we are addressing primarily through the Building Safety Bill, but to all buildings. This clause extends the limitation period of the 1972 Act, and under section 38 of the Building Act 1984, from six to 15 years. That is a highly unusual retrospective change, which we believe will provide a legal route to redress that previously would not have been possible for hundreds of buildings, benefiting thousands of leaseholders.
Limitation periods serve several important purposes. They give legal and financial security and certainty; they protect defendants from stale claims, which may be difficult to counter—that is important, too, and we must remember that we are talking about all buildings covered by the Defective Premises Act—and they prevent injustice that may arise from the courts being required to decide on past events on the basis of evidence that may have become unreliable because of the passage of time.
Various limitation periods are set in the Limitation Act 1980 for different types of civil claim, of which this would be one. They range from 12 months for defamation or late payment of insurance claims, to six years for claims relating to some types of contracts, and to 15 years for cases involving negligence. That is where this type of case sits.
To speak specifically to clause 126, it means that claims will be able to be brought for buildings completed up to 15 years prior to commencement of this clause. There has been some criticism—or some other criticism—of the clause, on the basis that individual leaseholders would have neither the expertise nor the funds to bring actions against large developers. We have said that building owners are responsible for ensuring that their buildings are safe, and as we have set out in clause 124, which we have discussed and agreed, they must meet the costs of remediation without passing them on to leaseholders, wherever possible—for example, by recovering costs from applicable warranty schemes, or from the developers or contractors who were responsible for the building and the defects in the first place. Making a claim under the Defective Premises Act will be one of the measures that we would expect building owners to explore. This clause and the previous one expand their opportunity for taking such action, and thereby amplify the culture that we are trying to inculcate across the sector.
Clause 126(1) makes the substantive change to the limitation periods by inserting new section 4B into the Limitation Act 1980. As a result, where a claim is brought under either section 1 or new section 2A of the Defective Premises Act, which we discussed under clause 125, the time limit to bring proceedings is extended from six to 15 years. The same extended limitation period will also apply to actions brought under section 38 of the Building Act 1984.
It might assist the Committee if I explain briefly how the various types of action differ. Section 1 of the Defective Premises Act allows an action for damages to be brought where a dwelling is unfit for habitation as a result of the way it was constructed or converted into a dwelling in the first place. Section 2A, which we have just discussed, allows action to be brought where a dwelling is unfit as a result of other work done to it. That is an addition to the existing Act. Finally, section 38 of the Building Act, which we will bring into force alongside the Defective Premises Act changes, allows an action to be brought for damages where a breach of building regulations in respect of any building, not just domestic premises, has caused damage. That “damage” is a human term rather than damage to a building, so, for example, poor ventilation or a crack in the wall that caused damage to a lung would be a reason for utilising that particular provision in the Act.
Clause 126(2) is technical and reflects changes to limitation provisions since the 1972 Act was passed. Subsections(5) and (6) provide protection for the legal rights of those against whom legal action may be brought under the retrospectively extended limitation period. In very limited circumstances—this is another reason why the hon. Member for Weaver Vale might consider withdrawing his amendment—there is the potential for the defendant’s convention rights, human rights, to be breached by the retrospective extension of a limitation period. I suggest that the longer that period is, the more appetite there might be for a defendant in a case to bring forward action under human rights legislation. We have therefore included subsections (5) and (6), which are important safeguards to ensure that our changes to the Defective Premises Act do not conflict with human rights legislation. That does not mean to say that people may or may not choose to bring court action under human rights legislation.
Finally, I draw the Committee’s attention to subsection (3), which provides that the clause will be commenced automatically two months after Royal Assent. That will be the date from which the extended limitation period is calculated, including the retrospective period for action under section 1 of the Defective Premises Act. With that, I commend the clause to the Committee.
Amendment, by leave, withdrawn.
Clause 126 ordered to stand part of the Bill.
Clause 127
Establishment of the new homes ombudsman scheme
Question proposed, That the clause stand part of the Bill.
Clause 128 stand part.
That schedule 8 be the Eighth schedule to the Bill.
Clause 129 stand part.
The Government are committed to improving redress for new build homebuyers and improving the quality of new build homes. The clause places a duty on the Secretary of State to ensure that a new homes ombudsman is—finally, I might say—established in England. The clause should be read alongside clause 128, which sets out the conditions that must be met for the new homes ombudsman scheme.
There is no existing provision in legislation for purchasers of new build homes to complain to an ombudsman or redress scheme. The new homes ombudsman is intended to provide clearer and more comprehensive means of redress when problems arise. It will provide a place for new build homebuyers to go with complaints, and it will be able to undertake objective determinations based on its investigations. By creating a trusted independent redress system that is easily accessible, we can drive up performance and create a better housing market.
The arrangements are flexible to ensure that the best provider can establish and maintain the service. The scheme will be free for homebuyers and is intended to be funded by fees that are paid by the scheme’s members. However, should it be necessary, the clause provides the power to give financial assistance to a person for the establishment and maintenance of the scheme.
Clause 128 relates to the conditions that the new homes ombudsman scheme must meet under clause 127, and it sets out who can make a complaint to the scheme. The clause requires the scheme to be open to all developers to join as members so that qualifying complainants can escalate complaints about the scheme’s members. A qualifying complainant is a person who, at the time of the complaint, is a relevant owner of a new build home in England. The scheme is given the flexibility to set out other persons who can complain about the scheme’s members.
Schedule 8 details the other provisions that the scheme must or may include. This includes provision on which matters may be complained about; how complaints are to be made, investigated, determined and enforced; and complaints about the scheme itself. The scheme must also contain certain provisions required by schedule 8, such as the procedure for developers to become and remain members of the scheme.
To avoid duplication, the scheme may provide that the ombudsman will not be required to investigate and determine complaints that are dealt with under another redress scheme, or complaints that are subject to legal proceedings. The scheme may make provision about working with another redress scheme.
The scheme will require developers to provide complainants with redress if a complaint is well founded. This includes the ombudsman requiring the scheme members to provide compensation, make an apology, provide an explanation or take such other action in the interests of the complainant as the new homes ombudsman may specify. The scheme may also include provision about how the ombudsman’s determination will be enforced. This may include provision for the ombudsman to request a member to take action and, where a developer does not meet its requirements, the scheme may as a last resort include the expulsion of a member from the scheme. In such cases, provision must be made for how they can then rejoin the scheme.
The new homes ombudsman scheme will allow new build homebuyers to complain to the new homes ombudsman about a developer for up to two years following the purchase of a home from a developer. Clause 129 provides definitions which determine who may complain to the new homes ombudsman, and a definition of a developer, who the Government can require to belong to the ombudsman scheme. The definition of developer includes those constructing new homes and converting existing buildings into new homes, so that complaints about developers of converted homes under permitted development rights, or those creating additional homes from larger buildings with the intention to dispose, sell or grant them to someone else, can be required to become scheme members and subject to the scheme’s rules under clause 130. I hope that offers the hon. Lady some reassurance. Clause 129 also includes a power to include an additional description of a developer, which could include organisations connected to developers.
On the New Homes Quality Board, which is operating as a shadow board at the moment, sits Jennie Daly, a group director of Taylor Wimpey. The board has representatives of housebuilders and the finance sector, and the hon. Member for Dover (Mrs Elphicke) is the independent chair. I can think of examples in my constituency of Taylor Wimpey homes that have considerable snags and are what we call leaky homes. The 19 million leaky homes that are not properly insulated have been constructed with gas boilers, fossil fuels and the rest of it. All of them will need to be retrofitted and a number have snags. In fact, there is one such development that will probably go forward in the Sandymoor and Daresbury part of my constituency, on former farmers’ fields, despite all the rhetoric that we hear in this place. I would hope that they will not be leaky homes, full of snags. It is very important that those on the shadow board take things forward in future.
On the reassurance about independence, if someone is part of the club, whether they be Taylor Wimpey or another housebuilder, they are paying for that service. Then the complaint goes from our constituents—our residents—to the ombudsman. I have real concerns about the checks and balances, and the independence. The Minister mentioned that there are various models to take it forward. It could be done in-house or at arm’s length as a Government agency. That would certainly by the Opposition’s preference, via a principle, to ensure that checks and balances are hardwired into the process. In principle, we welcome the new homes ombudsman, which is very much needed, but we already have concerns about the evolution of the process, if we look at the shadow board.
On the point that the hon. Member for Weaver Vale made regarding the number of snags in a property, we will all have seen that. A comparison that has been made previously is that someone has more rights if they buy a faulty kettle than if they buy a faulty home that has minor problems that do not qualify under the National House Building Council regulation. They do not have something such as subsidence; they just have niggly problems. The developer has taken the money and perhaps trades are no longer on site, and the buyer wants to see those things addressed.
I genuinely think that we will see the industry taking quality much more seriously than they might have previously, particularly with that line of accountability coming back to Parliament. I understand that the hon. Gentleman may have reservations about members of the shadow board. We need to draw the sector into the programme and get them bought into the idea that we will raise quality. I do not think that this Secretary of State or any future one would want to be associated with a product that was not delivering for the public, so they will ensure that that confidence remains.
Question put and agreed to.
Clause 127 accordingly ordered to stand part of the Bill.
Ordered, That further consideration be now adjourned. —(Scott Mann.)