PARLIAMENTARY DEBATE
Building Out Extant Planning Permissions - 30 October 2019 (Commons/Westminster Hall)
Debate Detail
That this House has considered building out extant planning permissions.
It is a pleasure, albeit a surprise, to serve under your chairmanship, Ms Nokes.
I am here to talk about planning, which is often a contentious issue for our local councillors, and particularly for local authorities that are developing local plans, especially in constituencies with significant areas of green-belt and other protected land. Some 89% of Guildford borough and 60% of Waverley borough is in the green belt; and 36% of Guildford and 53% of Waverley is in an area of outstanding natural beauty.
In Guildford, we are very short of homes. We have around 3,000 people on Guildford Borough Council’s waiting list, with thousands more unable to buy a home due to excessively high prices, and we have correspondingly high rents. However, in Guildford and Cranleigh we need to build more homes in the right areas, with good transport links and all the necessary infrastructure, without increasing the risk of flooding, while protecting our green belt. To do that, we need investment from Government and developers.
I am sure that many Members of this House and I could spend several hours discussing the need for more homes, including more social housing and more homes that people can afford, and where those homes should be built, but I asked for this debate on a narrower area. Once local authorities have had the arguments about local plans and planning permissions—and they do have torrid arguments about them—and permission has been given, what powers do local authorities have to get the homes built? How can they get the much-needed infrastructure?
In Guildford in 2018-19, the number of homes built was 284. There is a requirement for 518 this year and 928 in 2021-22. In simple terms, that will only cover the backlog of unmet need. There is also a need, year on year, for 570 so-called affordable homes—although what is called “affordable” in Guildford is not affordable in many other parts of the country, or even in Guildford itself, so the word is open to some debate. However, taking into account that development will provide 40% of the overall housing figure, year on year, Guildford will be short of affordable homes until we reach more than 1,000 new dwellings a year.
Schemes such as Weyside urban village are subject to a housing infrastructure fund or HIF bid, which we are still waiting to hear about. We were told by the Ministry of Housing, Communities and Local Government that this was an oven-ready scheme, but still we have not heard back on that, and the Government have recently put up interest rates on local authority loans from the Public Works Loan Board from 0.8% to 1.8%.
Despite my having had numerous meetings with Ministers from the Department for Transport and the Ministry of Housing, Communities and Local Government, Guildford’s infrastructure, both road and rail, is under extreme pressure, as is the two-lane stretch of the A3. That affects many more constituencies than just mine; it affects everybody south of Guildford. Developers will build only where there is a commitment to the delivery of infrastructure. Builders simply will not build without it; they go elsewhere, where it is easier to build.
In Cranleigh, in Waverley borough, a total of 7,640 permissions have been given since 2013, but only 1,906 homes have been built. Cranleigh is required to build 1,700 new homes over the local plan period, which is from 2013 to 2032. Of those, 1,600 have been granted permission. The largest sites in Cranleigh account for 1,348 of those dwellings, of which only 168, or 12%, had been built as of 4 September.
The figures are pretty shocking. A permission for 425 dwellings was granted in 2016, but only eight of those plots are complete; 136 dwellings were given permission in 2014, and only 69 of those plots are complete; 75 dwellings were granted permission in 2017, and 38 of those plots have been developed; 265 dwellings were given permission in 2015—four years ago—and none of those is complete; an application for 54 dwellings got permission in 2017, and of those, we have only one show home; of 125 dwellings given permission in 2015, none is complete; and on one site, where 149 dwellings were given permission in 2016, and 119 in 2018, only 52 plots are complete. As I say, developers will build only where there is infrastructure, but these permissions are crippling Cranleigh.
Cranleigh is in the countryside, beyond the green belt, and although I do not want to see building on the green belt—none of us does—we end up with development pushed on to the countryside beyond the green belt, with no account taken of sustainability, environmental protections or feasibility. Cranleigh is a wonderful village, but it has precious little transport infrastructure and no realistic means of achieving it. That has an impact on housing delivery, and developers want to keep prices high, well beyond the reach of many. Build-out is slow. I could talk about the inappropriateness of the development in Cranleigh, but that would take me into another Westminster Hall debate.
Local authorities simply do not possess enough tools to force the hand of developers. The housing delivery test is based on the completion of new dwellings, rather than planning permissions granted. In granting planning permission, local authorities can set shorter time periods in which the development must be begun, but as starting a development can mean as little as commencing an access road, or creating a hard-standing for the parking of vehicles, those time periods mean precious little. Local authorities have no carrots and no sticks at their disposal.
There are numerous options available to Government to make a real difference in getting the homes that we need built. We need houses that people can afford in areas such as Guildford and Cranleigh, where prices are eye-wateringly high—the average house price in Guildford is more than £550,000—and socially rented homes. However, it sometimes feels as if successive Governments are simply unwilling to do anything that will upset the developers’ apple cart.
The options that could be available to Government include requiring developers of strategic sites in local plans to come forward with a full permission application. They already have the benefit of being in the local plan—a factor that carries significant weight when it comes to granting permission. They should have to come forward with a full application. The pretty development pictures that we see at the outline stage, which are generally in watercolours and made to look a bit like something out of a storybook, are rarely carried through into reserved matters.
Phased development on larger sites should be agreed in advance between the developer and the local planning authority and written into the section 106 agreements, so that the LPA has a more realistic idea of what will be delivered. Currently, provision of affordable housing is written into any agreement, but if all housing is viewed as a social benefit—I think all housing is a social benefit—we could include phased development targets, particularly on strategic sites, in local plans.
Starting a development should involve completing a dwelling, not just putting a bit of concrete on the land. Once the developer has committed money to laying on services and so on, they are more likely to continue. Council tax could become due on every dwelling, whether completed or not, based on agreed delivery rates. There could be compulsory purchase by Government of sites that had not delivered over, say, 10 years. There could be a higher rate of tax on land banking by non-building companies that push up the value of land. We could apply heavier taxes on developers’ land banks that contain more than five years-worth of house building, based on their current build rate. Developers can make money selling on plots rather than building houses; we need to capture more of the uplift value of the land, so that house building becomes the better option. We could decide not to sell public land to developers. Land capture value should be captured for the benefit of the public, not for plugging funding gaps.
Local authorities face significant sanctions for not building homes in housing development targets; developers that do not build have none whatever on them. The only cost that they bear is the cost of interest on loans that they acquire to buy the land. In fact, it is not uncommon for developers to build out just short of their targets but not up to the trigger points. For instance, I recently heard a story of a developer from whom significant amounts of money were due when it reached the 300th house—money that was critical for the infrastructure for a large site. But the developer stopped at 299. None of the other developers building on that strategic site was prepared to go ahead without that infrastructure.
I cannot see, despite protestations from many people, any real action from Government. You, Ms Nokes, raised with me an interesting point about Romsey brewery. This is a long-running case in Test Valley. The last brew was on your 11th birthday on 26 June 1983. Every time it looks like development is about to make progress, it stalls. There are residents on a site that has been partially developed for years and years. There is a similar site in Guildford; it was demolished in, I think, the 1980s. It stands right in the town centre—minutes’ walk from the station—but nothing is being built on the site. In an area such as Guildford, where, as I said, 89% of the borough is green belt, it is criminal that people who need homes—socially rented homes, homes to rent, and homes to buy at prices that they can afford—see that site sitting empty.
If we want more homes, at the very least Government need to help local authorities to deliver the infrastructure and penalise the developers, or give them significant incentives to get on and build the houses that are needed. We need the Government to take action so that we get truly sustainable development—not just development anywhere, but development that allows rewilding of our countryside, for example, and enables building on brownfield land. I am thinking of sites such as the Romsey brewery and the Plaza site in Guildford.
Guildford will remain unbuilt on for years and years unless Government do something. I know that this Government have, and previous Governments had, the best intentions. What I would like to hear from the Minister and perhaps the hon. Member for Stockton North (Alex Cunningham) is some ideas about how we get things to happen in the foreseeable future, not five years down the line.
The right hon. Lady talked about high demand for property in Guildford and real shortages. That is reflected across the country and even in the north of England, where land prices are of course less expensive. She made a comprehensive speech, and my speech will reflect much of what she said. There were interesting comments particularly on affordability. Of course, we have very different markets across the UK. I do not know what it costs to buy a three or four-bedroom house in Guildford, but if someone comes to Stockton-on-Tees, they can buy a brand-new four-bedroom house for under £200,000.
[Geraint Davies in the Chair]
My point is that if we had investment in the north of England similar to what there has been in the south—investment in infrastructure and in business development —perhaps people would find tremendous advantages in heading north and living there, where the standard of living can be much higher and people have so much more disposable income even after they have paid their mortgage.
The problem is that this country is facing a housing crisis. There are 126,000 children without a home to call their own. Rough sleeping has more than doubled since 2010. Home ownership among the under-45s has fallen by 900,000 since 2010. More than 1 million people are on council waiting lists.
Labour has made many commitments on how we will address the housing crisis. We will launch the biggest council building programme for a generation. We will build for those who need it, including the very poorest and the most vulnerable, with a big boost to new social rented homes. We will stop the sell-off of social rented homes by suspending the right to buy. We will look closely at how local authorities deal with land—how they sell land if they need to sell land. The right hon. Lady talked about that, and we will look closely at how we contain the value and the price of land. We will transform the planning system with a new duty to deliver affordable homes.
We also want to encourage greater use of brownfield sites. I mentioned the site in Stockton where someone can buy a four-bedroom house for £200,000. I visited that just last week. It was a brownfield site—a big joinery company used to be on the site. People are starting to build there, so I hope that the centre of Guildford might see a similar development in the near future.
A Government can take many actions to alleviate the housing crisis, but of course the real answer is to build more genuinely affordable homes. To truly address homelessness of all kinds, we need those affordable homes for people to live in. To enable more young people to buy a house, there needs to be the stock available at a price that they can afford. My researcher, Kerri Prince, lives in Greater London and is saving desperately to buy a house, but she needs £40,000 or £50,000 to put a deposit on a house, so it is almost an impossible task for her.
Unfortunately, it is not as simple as giving developers planning permission, as the right hon. Member for Guildford outlined. We have situations where planning permission has been given and building has begun, but residents in the locality are left with an eyesore of a building site for many months, or even years, due to the project being suspended or halted. There is no requirement for developers to finish the building and bring the project to completion, and there are no deadlines for the building to be completed. She gave lots of examples of developers failing the people they are meant to be providing for.
Some developers get their hands on the land and then fail to build even one house within a reasonable timescale. The developers always get what they want but, for many reasons—probably related to their projected sales, income and profit generation—they chose to go at a pace that suits them, not the need for new homes. We believe that councils should be given “use it or lose it” planning powers. They should be able to levy the tax that I mentioned on sites where planning permission has been granted but it has not been built out in a reasonable timeframe, or where the building has begun but been halted for the long term, so the homes do not get built because it is not convenient for the developer to do so.
At the planning permission stage, we could place more stringent timetables on when parts of the development should be delivered. That would result in a minimum number of homes being developed within fixed timescales and would not leave the early inhabitants living on a building site for years on end. I know that major developments can face uncertainty and setbacks, but I am under no illusion: some developers enter the process in the full knowledge that they will abandon the land for a time, depending on their own needs and processes. For me, that is not on.
Local authorities grant planning permission in good faith, to provide homes for their residents. Some developers may hold up the delivery of the houses for the sake of profit, as prices may have dropped, or they have been unable to increase them as much as they claim they need to. For too long we have tolerated profits for developers being put ahead of housing for the many. We should be much stronger on regulations and the planning system for delivering new affordable homes.
Last week, during a visit to Sheffield, the Minister spoke about a corridor of prefab house building factories across the north of England—a bold and welcome vision—yet it was a shame to hear that most of the £38 million to boost construction went to councils in the south. That seems to be the story with this Government: investment for the south while the north continues to be disregarded and discounted. I hope that the Minister will have tough new measures to announce.
I hope that the Minister will announce tough new measures that outline how she thinks we can bring these housing developments to completion within a reasonable timescale. That must include measures to support councils in getting the required level of affordable housing to ease their waiting lists; measures to be firm with developers who are sitting on developments with no completion date in sight; and measures to be tougher during the planning permission process, to give councils the assurances they need to grant the green light.
Our housing and planning systems are long overdue an overhaul. Over the past decade, this Government have failed on housing on all fronts, so it will fall to the next Labour Government, in a few weeks’ time, to deliver the change that is needed.
The right hon. Member for Guildford raised many important points: the shortage of homes, unmet need, future need, green belt protections, and the fact that we need to be building homes of all types—social, council or private, to rent or to purchase—and we, as a Government, agree with that. We are tenure-blind, because everybody will need a home at some time in their life—of course they do—whatever type of home that is at that time. We know from surveys that 87% of people would rather own than rent, so we know that people ultimately want to own a home, because they feel it gives them security and a stake in society. It is about providing all those homes, with a view to helping people on to the housing ladder.
I remember only too well the opportunity afforded to people who bought their own home in the 1980s and earlier. It worked as well for local councils and the Government as it did for the individual because at that time, when council homes were not necessarily being kept in the condition that they should have been, a person living in a council home could take over the property to maintain it, and bought it at a price that worked for them and for Government; and they then had a home.
As the right hon. Lady said, we need to keep that cycle going so that there are more homes coming forward, and that is what we must continue to do. So many people have said, and continue to say, that the opportunity afford through the right to buy fundamentally changed not only their lives, but those of their children.
When we talk about the number of homes coming forward, we all agree that there have been many decades of not building enough; demand has outstripped supply for many years. In the past year, however, more than 220,000 homes have been built—more than in all but one of the past 31 years. We need to do more, and more is being done—but a significant amount has been done already. We are going in the right direction. The Government are putting another £44 billion into home building.
We have helped people in various ways. Some 560,000 people have benefited from our Help to Buy scheme, and we are helping 310,000 first-time buyers. We have the highest number of first-time buyers in a decade, and there was an increase of 84% between 2010 and 2018, so we are helping people to get on the housing ladder. Local authority waiting lists went down by about 40% in that time. We are helping people across the board, whether they are on housing waiting lists or whether they want to buy homes, but I agree that there is more to do.
We all want sustainable development. We want homes that are fit for the future and future-proof. The hon. Gentleman mentioned that in Sheffield I talked about the fact that the Government are setting up a centre of excellence across the north. Our vision is that the north will be the centre for engineering and modern methods of construction. We will be building homes for people to live in, so the UK can be a global leader in modern methods of construction and in safe homes, technological homes, green homes, modern homes and beautiful homes. That is our goal and ambition; if we achieve it, a mature market will be worth £40 billion a year to this country. That industry will be led from the north, as it needs to be. We selected the north because of the vision that it already has. We need to capitalise on the arc that stretches from Liverpool right across to Sheffield. I am glad that the hon. Gentleman shares my vision and view of the opportunities.
On sustainable developments and homes for the future, the Government are paving the way for a green revolution with eco-friendly and affordable homes. We are looking in the round at how to have homes with considerably reduced heating costs, so that they are affordable in every way, but also good for the environment. We need homes that give the people in them value for money, that are good for the environment and that reduce carbon emissions.
Some of these homes can be built off-site, using modern methods, in a couple of weeks, and can then be put on-site in a couple of days. That stops the disruption for everyone living close by, which stops some of the opposition to planning permissions and building out, because it is very considerate to everybody living close by. That is key, and it is exactly what we are doing.
The companies coming forward in this area include Urban Splash, up in Manchester, which is engaging in a joint venture with a Japanese company, Sekisui, that is coming over to England. In Speke in Liverpool, there is a new, emerging company called Ideal Modular Homes, and in Yorkshire there is Ilke Homes. This new development is happening, and these new products are coming forward. The Government are getting behind that, and supporting these new and emerging industries, because that is the future of housing in this country. However, housing is all about choice, and that is what we will always push; we will not only back industry, business and creativity but ensure that houses are built and delivered to local neighbourhoods in a considerate way.
The right hon. Member for Guildford and the right hon. Member for Romsey and Southampton North talked about brownfield sites. They are key, especially when we consider that possibly 1 million homes could be built on them across the country. Once again, through the home building fund, the Government are putting more than £2 billion into supporting work on brownfield land that is coming forward, which is key.
I go on visits around the country, looking at what is happening with housing. I went to Northstowe, the biggest complete new town since the 1950s. It was built on public brownfield land. We have to make sure that there is a steady supply of brownfield land coming forward, and we must provide support to make sure that people do the remediation work on that land and build on it. They must not only start building on that land, but continue that building until completion.
The right hon. Lady is correct to say that after developers receive planning permission and start building, we need to see the end point. We are working with our strategic partner, Homes England. If we are selling off public land, we will make sure that we divide the plots up, so that we can have small, medium-sized and big builders involved, and can ensure a path to completion, with companies of different sizes building properties with different types of tenure. That matters, because a lot of research we have done shows that a lot of the difficulty is not about people land banking; it is about the need for variation in the types of tenure coming forward. Obviously, we need people to want to buy properties, so we must understand the marketplace, and bring through the array of types of home wanted; that is key.
We have talked about the number of homes that will be needed in the future. The Chartered Institute of Housing has reported that we need around 340,000 new homes a year to meet unmet need, although KPMG and Shelter project that there will be future demand for a minimum of 250,000 homes per year. That is why we are looking to increase the figure to 300,000 new homes a year by the mid-2020s.
We must ensure that new homes fit in with the demands and wants of local communities. Obviously, we live in a democracy; we have to take everybody’s views into account. We have to make sure that people are happy with what is being built; that is why we brought in the national planning policy framework, and it is vital that we keep such things updated, which will help us as we work towards establishing communities that people want.
We have helped to cut red tape while making it quicker to plan and build new developments of homes that people want. That is how we have managed to increase building rates this year. Furthermore, I am delighted that in the year to June 2019, new build dwelling completions—not permissions, but completions—increased by 8% from the year to June 2018. Indeed, in the year ending June 2019, the planning system granted permission for 375,200 new homes, which is a positive step, so we have planning permissions in the pipeline for the future. That means things are going in the right direction, but we recognise that more needs to be done, and more homes need to be built out.
Key measures will obviously include the housing delivery test: what is needed in an area, how do we work towards meeting that need, and how do we get the local plan working in the way that is needed? Also, we will look at the independent review of build-out rates. What is inhibiting development? What is stopping people building out? I have mentioned the answer: it is ensuring that the right tenures and types of homes are built, so that there is variation.
The housing infrastructure fund of £5.5 billion will ensure that the correct infrastructure is in place and will unlock about 650,000 homes. Marginal viability funding will help people to unlock the land. We will probably need to understand a little more about why some of the brownfield land has not been built out and perhaps help people apply for viability funding. If it is about remediation or infrastructure, we could provide support to make sure it is built.
How do we make sure that brownfield sites or sites that have planning permission come to fruition and get built? We have been doing that all across the country. I have travelled to Gosport to look at a new significant size building there, partnering with Homes England. I have looked at what is happening in Cambridgeshire and Northstowe. I am looking at a new development in Manchester and bringing back into play what I call unloved land, or we are renovating old buildings. That is exactly what we are doing, but each part of the country wants, and requires, a different type and style of home. We must have solutions for all of them, to ensure that we keep to the character of different areas.
The Government also want to bring back many small and medium-sized businesses. A third were lost in the financial crash of 2007-08. How do we stimulate the marketplace and ensure that we bring those builders back into it, so that the big builders do not dominate? That is key, because we are the party of small businesses, and of innovation and aspiration. We can bring those elements back in by working with our strategic partner, Homes England, which has increased in size considerably and is stretching out across the country. We are looking at how we can subdivide land to bring in new developers, so that they too can get building. Equally, if those developers are from the local area, the local area benefits too, in terms of jobs, the survival of businesses, and understanding the character of an area.
Another key point is how to get the skills and the labour force. That involves working through the industrial strategy, and working with the Department for Education to ensure that we will have a workforce that can build the homes that are needed. We are doing significant work and putting significant funding behind that too.
European citizens who are here, working with us, will remain here. We support them and thank them for the work they have done. Looking forward, how can we ensure that our workforce is homegrown as well as including those we need for the time being? The right hon. Lady is correct to mention those issues, but I have not just thought about them today; I have been working on them for nine years. That is why our country has such robust employment figures. However, she is right to mention those concerns.
It has been hard work for the Government to turn around the economy and get people into employment. That is the truth, and it has to be on record. I am particularly pleased that the Government have reduced youth unemployment by 50%. When we started in 2010, meeting young people who thought that they might never get a job was shameful, yet we have turned that around, ensuring that there are opportunities for everyone in this country.
With regard to ensuring that people work together, including big companies giving work to smaller companies, people do that on site anyway, ensuring that small, local companies work on site. That needs to be pushed even further. We are working with our strategic partner, Homes England, to ensure not just that there is a single big developer, but that the land is subdivided so that small and medium-sized enterprises can come forward. I am also working closely with Homes England on ensuring that smaller sites are given to SMEs to build on first.
We agree that it is key that local people benefit from the house building that is needed, not only through places to live, but through jobs. Some 300,000 homes will have to be built every year from the mid-2020s. Look at the size of the opportunities, and at the workforce that needs to be created. They will be very good jobs with very good career prospects. That needs to be planned for, which goes back to the question the right hon. Member for Romsey and Southampton North asked about the workforce. Significant planning needs to go into that, which has been done and continues to be done. Again, that is why we are looking at modern methods, so that we can cater for a highly skilled workforce.
I think that we are coming to the end of the debate. We have covered an array of issues. I will take various matters back and will write to the right hon. Member for Guildford, particularly on the HIF fund that she is working for. However, I want people to be reassured that we are building more homes, and we will continue to do so. We have incentives and support to ensure that people are building on brownfield sites, and where they are not, we will look at what levers we can pull to make sure that people build out those sites, whether using carrots or sticks. I will take that question back and consider it. We are also talking about how we make the planning process easier, making sure that we are working with local communities.
I will give the final word to the right hon. Member for Guildford.
The key point is that we want to protect our green belt, but that does not mean simply pushing housing on to the countryside beyond the green belt, which is the case in Cranleigh. It is not sustainable; it is not the right place to build homes. All these planning permissions are being given but the homes are not being built, and unless something happens soon, Waverley Borough Council will be penalised for that.
I appreciate that the Minister is going to be bringing forward a Green Paper, but I, like many members of the public, get so frustrated: “A Green Paper? Goodness gracious me, when is something actually going to happen?” It feels like a long way ahead, so I urge the Minister to look at some small things that could be done. I know that the housing market is complex, and that Governments have to be careful about where they interfere in it because that can have unintended consequences, but council tax on undeveloped planning permissions is one small thing that might alter the balance of the economics for developers, and get them building.
There is another thing I urge the Minister to do. Governments always talk about joined-up working, but they never join anything up. That is not a criticism of the Minister, but she and her colleagues in the Department for Transport need to work closely together, because in an area such as Guildford—I am sure this is the case in Romsey, too—we have to get transport and housing lined up.
I thank you, Mr Davies, for your patience, and I thank the Minister and the hon. Member for Stockton North (Alex Cunningham). I look forward to receiving the Minister’s letter about the HIF bid within the next couple of days.
Question put and agreed to.
Resolved,
That this House has considered building out extant planning permissions.
Contains Parliamentary information licensed under the Open Parliament Licence v3.0.