PARLIAMENTARY DEBATE
Planning and Infrastructure Bill (Fifth sitting) - 13 May 2025 (Commons/Public Bill Committees)
Debate Detail
Chair(s) † Wera Hobhouse, Derek Twigg
Members† Amos, Gideon (Taunton and Wellington) (LD)
† Caliskan, Nesil (Barking) (Lab)
† Chowns, Ellie (North Herefordshire) (Green)
† Cocking, Lewis (Broxbourne) (Con)
† Dickson, Jim (Dartford) (Lab)
† Ferguson, Mark (Gateshead Central and Whickham) (Lab)
† Glover, Olly (Didcot and Wantage) (LD)
† Grady, John (Glasgow East) (Lab)
† Holmes, Paul (Hamble Valley) (Con)
† Kitchen, Gen (Wellingborough and Rushden) (Lab)
† Martin, Amanda (Portsmouth North) (Lab)
† Murphy, Luke (Basingstoke) (Lab)
† Pennycook, Matthew (Minister for Housing and Planning)
† Pitcher, Lee (Doncaster East and the Isle of Axholme) (Lab)
† Shanks, Michael (Parliamentary Under-Secretary of State for Energy Security and Net Zero)
† Simmonds, David (Ruislip, Northwood and Pinner) (Con)
† Taylor, Rachel (North Warwickshire and Bedworth) (Lab)
ClerksDominic Stockbridge, Committee Clerk
† attended the Committee
Public Bill CommitteeTuesday 13 May 2025
(Morning)
[Wera Hobhouse in the Chair]
Planning and Infrastructure Bill
Clause 21
Long duration electricity storage
Question proposed, That the clause stand part of the Bill.
The clause is about long-duration electricity storage, or LDES, which is an incredibly important part of an electricity system, allowing us to store cheap renewable energy when the wind is blowing and the sun is shining, and to generate electricity when people need it most. It is a crucial part of our clean power mission.
Across Great Britain, we already have 2.8 GW of LDES on the grid. I have had the pleasure of visiting some pumped hydropower stations that have been part of our system for decades. They allow excess electricity to pump water high up to a mountain reservoir, where it can be released when we need it to drive turbines and generate electricity. The most recent of those sites, however, was completed more than 40 years ago. The clean power 2030 action plan suggests that we need another 1.2 GW of LDES in the next five years. The National Energy System Operator suggests that we could need up to 15 GW by 2050, so a significant increase on where we are today.
Despite low operating costs and high system-wide benefits, which in 2024 were estimated at £24 billion, the large up-front capital costs to build such stations in the first place, and the revenue uncertainty over such a long lifespan of an asset, have deterred private investment in LDES over the decades. The clause therefore introduces a cap and floor scheme to develop new long-duration energy storage in Great Britain.
Those wishing to develop an LDES asset will be able to apply to Ofgem for protected revenues, conditional on satisfactory delivery and operation and on sharing excess profits with consumers. That provides the revenue certainty needed for investors, giving the green light for the next generation of those important assets. We expect—we have set out deliberately—that this will be technology-agnostic. We therefore expect that we will have more pumped hydro, as well as more novel technologies such as liquid air energy storage.
The clause imposes a duty on Ofgem to establish and operate a cap and floor scheme to encourage the development of LDES assets across Great Britain. The clause also defines the minimum eligibility requirements for the scheme: assets will need a minimum power output of 50 MW, and to be able to discharge at full power for eight hours without recharge. Simply meeting those requirements, however, will not guarantee success, and Ofgem will only select the projects that are most useful for system-wide benefits and for consumers. The clause gives the Secretary of State the power to update that definition by regulation. It also defines in broad terms how Ofgem will set the cap and floor, and how it will fund floor payments.
This is a really important step. As I say, after 40 years of not building long-duration energy storage in this country, we are incredibly excited to be building it once again. It is also crucial to how we deliver the clean power system in the future. I commend the clause to the Committee.
The clause amends the Electricity Act 1989, requiring the Gas and Electricity Markets Authority to implement a cap and floor scheme for long-duration energy electricity storage or LDES. We are concerned that the clause introduces unnecessary bureaucracy and will distort the market with the introduction of the scheme. I have several questions on this. Can the Minister explain what criteria will determine the initial cap and floor levels? More importantly, how frequently will they be reviewed to stay responsive to market changes?
We know that the scheme aims to provide financial stability to LDES for operators by setting revenue caps and income floors, and to encourage investment in this technology. However, will LDES operators and investors have a role in reviewing or adjusting the scheme to ensure that it reflects real-world conditions? Will there be eligibility criteria for a formal application process for operators to access the scheme, ensuring fair access for all players? Those concerns, we would argue, highlight the need for clarity and effective integration with broader energy policies and to ensure the scheme’s success. I look to the Minister for clarification on those elements of the clause. We do not intend to divide at this stage, but we will provide further scrutiny at further stages of the process.
There are instances of fires in battery storage facilities, but there is no reason why they should not be built safely—they can and are built safely. We ask the Ministers to consider whether fire brigades should be statutory consultees in applications for battery storage proposals. That is not the case at the moment, which seems perverse, given that there is an acknowledged fire risk that needs to, and can, be dealt with. We should have fire services as statutory consultees to ensure that happens.
As someone who has been involved in the energy sector for almost 30 years, the simple fact of the matter is that this technology will not be invested in without additional support. The plan for a cap and floor mechanism is well worked through, and has a reasonable pedigree in the electricity industry for supporting investment. Clause 21 seeks to introduce that. Quite properly, it is technology-agnostic, because there is a great deal of innovation in this sector. The provision is important for decarbonisation, energy security and jobs across the British Isles; I therefore support it.
The shadow Minister, the hon. Member for Hamble Valley, raised a number of important questions. Ofgem has consulted on the process for the first window of the cap and floor scheme. It has published detailed, technical guidance on what we would expect those projects to be able to deliver. We, and Ofgem as the regulator, have very deliberately been technology-agnostic to allow more of these innovative projects to come forward. That first round will run its course, but we absolutely would expect that Ofgem and the Government will look at the results of that review and see if there are areas that we might improve on for a further round if that is deemed necessary. We will keep the scheme constantly under review.
The cap and floor scheme that Ofgem has run for interconnectors has been an incredibly successful way of delivering value for money for consumers and of giving that revenue certainty over the long term. It is a model that works very well. We will review the projects that move forward in the scheme. As I outlined, there are technical requirements that they must meet, but there will also be a process of ensuring that the projects deliver value for money for consumers.
The hon. Member for Taunton and Wellington rightly recognises the role that LDES plays in the mix. We could see some battery projects coming forward in this round. Traditionally, they have not been part of long-duration energy storage, but that technology is moving forward rapidly and some might be able to bid into this process. There are some really innovative projects in that space.
It is important to take the question of how we deal with safety risks for batteries in a balanced way. There are safety incidents for a whole range of infrastructure in our country; some get a lot more attention than others in the media, and we need to be careful not to draw more attention to one particular technology at the exclusion of others. But the hon. Member for Taunton and Wellington is right that safety should be paramount in everything we do with every energy system and every part of infrastructure.
We are looking at the wider question of how we might introduce additional safety measures on battery storage sites more generally, not just as part of the LDES scheme. The Health and Safety Executive has a key role in regulating battery designers, installers and operators to ensure that they take the necessary measures to ensure health and safety. It is an important step, and one that we take seriously.
In the grand scheme of things, batteries are not more serious than, for example, oil storage, but they require different equipment and differently trained and equipped crews to respond. Will the Minister say more about how, as batteries become a more significant part of the energy mix, he will ensure that fire brigades are able to take a view at the planning stage and are made aware of the risks—just in case they have to respond?
On a general point, I am glad that hon. Members across the Committee recognise the importance of LDES. It is genuinely an exciting moment for the country that we will build some of these important engineering projects to deliver the long-duration energy storage that the country needs.
Question put and agreed to.
Clause 21 accordingly ordered to stand part of the Bill.
Clause 22
Benefits for homes near electricity transmission projects
“of £1,000 per year for ten years”.
Clause stand part.
New clause 102—Community benefits from major energy infrastructure projects—
“(1) The Secretary of State must by regulations establish a scheme under which communities with a specified connection to a major energy infrastructure project are entitled to financial benefits.
(2) In subsection (1), ‘major energy infrastructure project’ and ‘specified connection’ have such meaning as the Secretary of State may by regulations specify, provided that any such definition includes all newly consented renewable energy projects.
(3) Financial benefits provided for by a scheme under this section must—
(a) be provided by the owner of the relevant major energy infrastructure project, and
(b) amount to 5% of the annual revenue of the relevant project.
(4) Where a major energy infrastructure project is onshore, regulations made under this section must—
(a) provide for two-thirds of the financial benefits accruing to a community under this section to be paid to the council of that community, and
(b) provide for one third of the financial benefits accruing to a community under this section to be paid into a strategic fund operated by the council.
(5) Where a major energy infrastructure project is offshore, regulations made under this section must provide for the financial benefits accruing to a community under this section to be paid into a strategic fund operated by the relevant council.
(6) Regulations made under this section may, among other things—
(a) specify the powers, purposes, responsibilities and constitution of a council strategic fund;
(b) make further provision determining which communities are qualifying under this section, and defining community for this purpose;
(c) confer functions in connection with the scheme;
(d) provide for delegation of functions conferred in connection with the scheme.”
This new clause sets out a scheme for providing financial benefit to communities in areas connected with major energy infrastructure schemes.
Where there is a disagreement, however, is on the level of that compensation. Amendment 83 would require the Secretary of State to establish a scheme under which persons with a specified connection to qualifying premises are entitled to a financial benefit of £1,000 per year for 10 years, provided directly or indirectly by electricity providers. We believe that this would be able to be monitored under the current scope of the legislation, particularly where it says that the Secretary of State may provide funding from Parliament to those administering the scheme.
Provisions would also be made for complaints, procedures, appeals or dispute resolution related to the scheme. The regulations would be subject to an affirmative procedure—we do not see any need to change that. The clause would apply to England, Scotland and Wales and come into force on Royal Assent. We would argue that the level set out in the amendment would not need to change the Bill. The scheme would allow eligible residents, mainly through electricity suppliers, to receive benefits based on the proximity to above-ground transmission projects, including past projects, which are fair and proportionate.
Under our amendment, any scheme established under proposed new section 38A(1) of the Electricity Act 1989 would have to include provision for, for example, homeowners residing within 500 metres of qualifying premises to be entitled to financial benefits of £1,000 a year for 10 years. The Minister and I did not argue—we never argue—but debated last time, and the Opposition accept the nature of what the Minister intends to do, but we feel that there needs to be more clarity for the consumer and for local people. There were stories on Sky News that the consumer benefit for homes near electricity transmission infrastructure would be set at about £250 a year, so I would be grateful if the Minister would state what he expects the level of compensation to be and clarify that for the rest of the Committee.
Whether the Minister chooses to accept our very reasonable offer of £1,000 a year or not, will he answer how errors or instances of fraud will be handled within the administration of the benefit scheme? What rights do residents or other parties have to appeal decisions or penalties related to the benefit scheme? What role will the Secretary of State play in ongoing monitoring and enforcement of the scheme, with particular regard to regulatory powers?
As I said, I do not want to go over the arguments again, but the Opposition believe that we must take communities with us, when it comes to consumers and people affected by large-scale planning decisions through centralisation and an attempt—to be fair to the Minister—to reduce the bureaucracy and deliver the infrastructure that we need. We talked last time about community benefit under other amendments and clauses of the Bill. The Opposition believe that residents and local communities deserve to know that there will be a certain amount for a certain period, and we believe that £1,000 a year for 10 years is something that local people would welcome. I commend amendment 83 to the Committee.
It is disappointing that the shadow Secretary of State for Scotland, the hon. Member for West Aberdeenshire and Kincardine, is not here to explain further his comments in the newspapers today. He has moved from saying that he opposes electricity pylons to the issue of scientists themselves, suggesting that climate targets are not, in fact, science-based. It is disappointing that he is not here to defend his amendment, but I very much welcome the Government’s proposal.
I do have some concerns. It has been raised in Committee before that this provision cannot be a simple solution to not doing any consultation. We still need a belt-and-braces consultation, and I want to hear some clear words from the Minister to say that this will not replace that—residents will still be able to have their say, and there will still be a full and proper consultation when new energy infrastructure comes forward.
I am disappointed to see in the legislation hardly any detail about what the community benefit scheme will be. I have said before that if we leave too much ambiguity, electricity providers and developers will want to get away with paying nothing at all or as little as possible. We should not allow that to happen. We should allow people—our constituents—who live near energy infra-structure projects to get the best deal possible, considering that they will have to put up with a lot of disruption. I have some constituents who live near large housing developments. There is a lot of disruption during the construction phase, so I want more detail about what the Government intend to set out.
As I have said, a House of Commons Library paper said that the Government were minded to go to £2,500 a year. The Government should therefore have no issue supporting the amendment because it does not go as far as that. It sets out reasonable benefits that everyone should expect across the country, leaving less to ambiguity and putting power into the hands of this Parliament scrutinising this legislation rather than developers and electricity providers because, as I said, they will want to get away with paying as little as possible.
Safeguarding the future by tackling climate change is vital, but we are only going to achieve that if we bring communities with us and make it affordable for households. We recognise, and of course welcome, the provision in the Bill for community benefits for those near transmission lines, but those living beside nuclear, gas, coal-fired or other power stations are not eligible for any community support. For example, I supported the development of Ham Farm solar park in Taunton, but none the less the community gets no benefit for the significant impact it is having on that community.
It is time that we had a system that gave community benefit for all energy infrastructure if we are to persuade communities and work with communities to host that infrastructure. If we are going to move Britain to a low pollution energy future with more home-grown energy—something the Liberal Democrats strongly support—we must be willing to compensate those expected to live with and host these enormous developments. It is time, in short, that local people benefited from national energy projects.
Liberal Democrats have consistently led the way on community benefit. My right hon. Friend the Member for Kingston and Surbiton (Ed Davey) brought in the first community benefit system of this kind. In 2013, when he was Secretary of State and making the UK the biggest offshore energy generator in the world, he said:
“Communities hosting renewable energy installations play a key role in meeting the national need for secure, clean energy. It is only right that local people should be recognised and rewarded for that contribution”.
He continued:
“developers already offer community benefit packages on a voluntary basis, we challenged them to do more”. —[Official Report, 6 June 2013; Vol. 563, c. 116WS.]
He then announced an increase in the recommended community benefit package in England from £1,000 per megawatt of installed capacity per year to £5,000, which remains the basis of the system today. Now it is time to extend that benefit to all energy, and to make it proportional to the revenue raised by energy projects. My hon. Friend the Member for Inverness, Skye and West Ross-shire (Mr MacDonald), who is a real champion for his constituency, proposed a scheme such as is set out in new clause 102 to Highland council back in 2021. It is important to recognise that the industry has contributed in this area, and in renewables especially.
In February 2024 the Government, in their document, “Developing Local Partnerships for Onshore Wind in England: Government response”, endorsed the 2013 system of £5,000 per megawatt installed capacity. Our new clause would mean that 5% of revenue from all energy projects goes to local communities. To put some figures on that, Grubb and Garjardo at UCL Bartlett estimate that, in a good year for energy generators such as 2022, UK revenue from renewables was £15.5 billion. Put that across 53,000 megawatts of installed capacity, meaning that £288,00 revenue per megawatt of installed capacity was raised, and 5% of that would be around £14,000 in community benefit per megawatt of installed capacity. In less good years, such as 2021, it might be around £7,000 per megawatt of installed capacity.
With average electricity bills in households being £730 in the UK, it is also important to secure reductions in bills by adopting the Liberal Democrat policy in our manifesto of finally decoupling electricity prices from the wholesale gas price. Based on Energy UK’s figures, that would mean a reduction in electricity costs per household of around £200 per year. The sums yielded to communities through the new clause—around £7,000 in 2021—would be comparable with the volunteered figure of £5,000 from the industry, but with the added benefit that when revenues increase, the community benefit would also increase.
So far the Government have taken only limited steps, which are welcome; but as part of the proposals that we put forward for a similar system in a debate in Westminster Hall in October, we were encouraged by the Minister, the hon. Member for Rutherglen, who said:
“On community benefits in particular, we are continuing—at pace”—
that key word—
“the work started by the previous Government to review how we can effectively deliver benefits for communities living near this infrastructure.”
He said that they were,
“developing clear guidance on community benefits for both the infrastructure and the transmission networks.”—[Official Report, 15 October 2024; Vol. 754, c. 276WH.]
My hon. Friend the Member for Inverness, Skye and West Ross-shire provides an example from the highlands. It is in the periphery of the UK—the highlands and elsewhere—that many of the biggest energy projects are located. Typically, they are areas where there are high levels of fuel poverty, limited access to affordable housing, lower wages, and high costs for electricity connection and heating. Rural areas, where many major projects are built across the UK, share the characteristics of departing young people, sparse and remote public services, especially after the ending of the rural service delivery grant, and poor infrastructure.
Other countries provide compelling examples of what can be done. Denmark, for example, requires new renewable projects to offer at least 20% ownership to local residents. In Germany, local authorities, or Länder, such as Munich, develop their own offshore wind farms, and community benefit comes from the tax revenue that they provide.
Our new clause would see two thirds of the benefit funds designated for the community, by which we mean to be spent in the council ward affected, where community groups themselves could and should be delegated with the power to manage and distribute those funds, with one third used for community benefit at a more strategic level for the council area decided by elected councillors. Fuel vouchers, affordable housing and investment into health and social care could be among the priority candidates for the spending of these benefits. It is unacceptable that these communities, which provide the backbone of our energy revolution, often see little financial benefit from hosting such infrastructure.
The amendment seeks to set the level of benefit at £1,000 per year over 10 years. First, I should say I welcome the fact that across the Committee today there is support for that principle. That is really important, because the principle that we want to recognise—to be fair, the previous Government did when they launched the consultation—is that if we host nationally important energy infrastructure, particularly transmission infra-structure, which so often has less of a community benefit in the communities that it passes through, there should be some benefit from it. That is a really important point.
The balance that we sought to strike was to find a way to give a benefit to those households affected by the transmission infrastructure, but also make sure that the wider bill payers across the country that will pay for those community benefits are not saddled with a significant bill as a result. So the balance that we struck was £250 per year over 10 years. I would never seek to question the House of Commons Library, but I think perhaps the hon. Member for Broxbourne might not be correct in his interpretation of its figures. It would be £2,500 over the course of the 10 years that the scheme would be in place. I think that is what he was referring to.
In our view, the point here is that this still provides a significant benefit regarding bills for those households for a substantial amount of time—10 years—but at the same time does not result in significant amounts being added to the bills of other people right across the country who will pay for this. We think £1,000—which we looked at carefully as part of this process—is too much.
To the point made by my hon. Friend the Member for Basingstoke, this is not the only part of the Bill—we will also have a community benefits fund for infrastructure like substations, where if there is one particular piece of infrastructure built in a community, with all the disruption that goes with building that, wider community benefits come from that as well. It is not one or the other; we are doing both, but in a legislative sense, we only have to legislate on the Bill discount scheme, which is what we are talking about in this amendment.
The shadow Minister asked for detail on some important points—including that we should set out in secondary legislation the specific level of benefit and the duration over which it will be paid. Of course, the £250 a year is a “minded to” position that we have come to as a result of the consultation that the previous Government did and the evidence that we have seen, but that will be set out in secondary legislation, which—to the hon. Lady’s point—allows us to alter that over time if the scheme is successful. This is, in some ways, a trial to find out whether the intended policy outcomes result. I hope that for those reasons—I will come to some others—the hon. Member for Hamble Valley might withdraw his amendment.
Clause 22 is about creating a financial benefit scheme for eligible households living near certain new or significant increases in network transmission infrastructure, and inserts new sections into the Electricity Act 1989. It empowers the Secretary of State to establish and determine the overall design of the scheme, including qualification criteria, scheme administration, enforcement, and provisions requiring the benefit to be passed on.
The “pass-through provision” is outlined in new section 38B(2), and is essential to ensure that the right consumers benefit and to ensure that when an intermediary sits between the electricity supplier and the end user—as happens in some cases—the intermediary will be required to obtain the full benefit and then pass it on to the end user. If this is not complied with, new section 38B(3) allows regulations to provide for the withdrawal or recovery of benefits made to intermediaries.
To enforce compliance with the scheme, new section 38C details the enforcement provisions that may be made in regulations, and I hope this answers the shadow Minister’s point around potential fraud in the system and the imposition of penalties that we will make through secondary legislation for instances of regulations not being complied with. Finally, new section 38D deals with provisions around data collection for the purposes of administering the scheme. Overall, it is worth remembering the purpose of this clause: it is to improve the public acceptability of network transmission infrastructure.
This is not a compensation scheme, and landowners that currently are compensated for infrastructure being built will continue to be compensated through whatever channels that is decided in. This is a community benefit, so it is additional. It is about recognising that it is critical for the future of the country that we build new grid infrastructure, and that if someone hosts that infrastructure they should gain some benefit from doing so. This is our proposal for doing that, alongside the community benefit funds that we have announced.
The Government believe that it is appropriate to set out the full detail on this in regulations, as is the case in many such schemes that have been set up over the years, due to the technical level of detail that will be required, and have drafted this clause to make sure that it applies only to transmission infrastructure, as it is not the intention that it should apply to other technologies. I commend clause 22 to the Committee.
That brings me to new clause 102, tabled by the hon. Member for Taunton and Wellington, which seeks to introduce a scheme that would ensure communities are provided with financial benefits from hosting major energy infrastructure projects from a range of technologies. I welcome the intent of this measure. Indeed, I have had a number of conversations with the hon. Gentleman’s colleagues on this very topic over the past nine months in which I have had the privilege of having this job, and spoken fairly recently to his colleague, the hon. Member for Inverness, Skye and West Ross-shire (Mr Angus MacDonald)—I was in his constituency yesterday, seeing the investment that this Government have made in port infrastructure in his constituency.
We therefore agree broadly with the hon. Member for Taunton and Wellington’s point about how communities should benefit from all this energy infrastructure, but the new clause is not the right way to do it. We are already considering—he quoted myself to me, and I was delighted to hear I was fairly coherent in that debate—the question of wider community benefits. Clearly, at the moment most such community benefit schemes are voluntary schemes run by developers. It is important to say that some of those are actually hugely successful, and communities welcome the collaborative approach in drawing them up, but others are very unsuccessful, and leave communities without the genuine benefits that they should get. We are therefore looking at this really closely at the moment.
As my hon. Friend the Member for Basingstoke noted, we published guidance in May 2025 on community benefit funds for those who live near electricity transmission infrastructure, and shortly we will publish updated guidance for onshore wind in England, which, of course, follows the 10 years of the previous Government’s ban in England. We are also exploring options for our overall approach to community benefits, to provide consistency across different technologies and to maximise the ambition from that. We have left on the table the option of that being mandatory in every case, but we want to look closely at how that would work, and how the design would work to ensure that we are not setting a scheme that does not suit the flexibilities that individual communities might want to take advantage of.
I reiterate that communities are providing a service to this country when they host clean energy infrastructure and there should be a benefit from it. Towards the end of the hon. Gentleman’s speech, he rather veered off community benefits and into an equally important space on community ownership, which is something that I have also had a number of important conversations about. We see ownership of energy by communities as a really important step as well, and that is a step up from community benefits.
I have regular meetings on the subject. It is really important that we get this right, because we need to strike the balance: ultimately, the community benefit funds will, one way or another, be paid for by bill payers, but we want communities to have a real benefit. The balance has to be right because we are trying to bring down bills for everyone across the country. The Conservative amendment would increase people’s bills, but we are determined to try to bring them down. There is a balance to be struck.
We feel that this is an exciting moment to drive community ownership forward. A key aim of Great British Energy will be to drive forward the local power plan, so that communities do not just have benefits from infrastructure, but own some of those benefits. A number of hon. Members across the House have mentioned the real benefits of communities having a stake in projects—they can spend the money on whatever they want to spend it on, rather than on what a scheme might define. The two go hand in hand.
The bill discount scheme is an important step to drive forward community acceptance of new network infrastructure. We will develop proposals at pace for the hon. Member for Taunton and Wellington and for communities right across the country on the wider aspects of energy infrastructure. I hope that he will not move his new clause 102.
I understand what the Minister said about the amount of money given to local people being legislated for in secondary legislation, but there is a question about why he will not put that into primary legislation. He could be clear—the £250 a year was clearly leaked to the press a few months ago—but the Government have still not produced any legislation to give certainty to the consumer. That is symptomatic of the Government: in lots of areas of the legislation, they simply have not provided any detail to the people it affects. We will get to those other examples later, when we come to the specific issue of planning reform.
The hon. Member for Basingstoke seems to have an encyclopaedic knowledge of Opposition politicians’ quotes; I suggest that the Whips Office makes more use of him, given his ability to get an Opposition quote quickly, just like that. He might want to get a hobby, I don’t know, but he is good on quotes.
My hon. Friend did say that the target date was not based on evidence, but he was talking about the arbitrary nature of the 2050 target for net zero; he clearly did not say that there was no science behind the concept of climate change. The hon. Member for Basingstoke is a doughty champion and fiery Back Bencher, destined for high ministerial office. He would be a good Minister, but he needs to read out the whole of a quote and give the genuine context of any comments by Opposition politicians.
To come back to the amendment, Mrs Hobhouse—I feel your beady eye upon me—the shadow Scottish Secretary has a clear record. In his earlier comments, he talked about bills going down, but bills are up by £300 a year. There was a manifesto commitment to reduce energy bills for people by £300 a year, and that is simply not happening because of the record of the Department for Energy Security and Net Zero. At the moment, it is closing down oilfields and relying far too much on renewable energy, without getting to the sustainable level at which energy bills could come down. The Minister keeps saying that he wants to bring them down, but when will they come down?
We understand and support the aims and ambitions of new clause 102, tabled by the Liberal Democrat spokesman, the hon. Member for Taunton and Wellington. However, we think there is some question about its practical implementation, specifically taking into account
“5% of the annual revenue of the relevant project”
and the provision
“for two-thirds of the financial benefits accruing to a community under this section to be paid to the council of that community”.
We do not necessarily think that that is how the money should be distributed. As we discussed in the last sitting, and I agree with the Minister entirely, if a local authority gets money dedicated for a community, that does not necessarily mean that the money will get to the community. That is part of the flaw of the section 106 system and the community infrastructure levy. We all know examples of when money has been given, with the good intentions shown in this honourable new clause, but the community that needed to be helped simply was not. We feel that is not the best way to distribute the money; I believe the Minister feels the same, following our lengthy discussion on whether he can or cannot award money to Scottish Ministers or local authorities. I am sure he will come back to that line another time.
On new clause 102, the point is what the Minister said earlier about lines going through multiple local authorities; the well-intentioned money would not get to the right people at the right time. It would be diluted, and we do not think that that is the right way forward. However, we absolutely support the Liberal Democrats in their ambition to make sure. That is why we put a specific figure into our amendment 83: we absolutely want to make sure that the people desperately affected by some of the infrastructure investment genuinely get some of that money. We also understand and endorse the element of community improvements, which I know we will come on to in other areas of the legislation.
The Minister is a good man. We entirely endorse him and will work together on the need for benefits for the people affected. But he needs to be more ambitious—he should have come the Committee today with a specific figure; he should not have said to the Committee that he is “minded”. He could have put in primary legislation the amount the Government were willing to give. I put down in my notes too soon that the Minister was very tight, with £250 a year—I think that was unfair to him.
But the Minister needs to be more ambitious: he should match our commitment to £1,000 a year and to local people affected by such infrastructure knowing that they would be guaranteed that for 10 years. Most people are responsible when spending their own money; we believe they would put that into the community, which would benefit it and improve its infrastructure. I commend amendment 83 to the Committee, and we will press it to a Division.
Question put, That the amendment be made.
Clause 23
Electricity transmission systems: extension of commissioning period
Question proposed, That the clause stand part of the Bill.
This is an incredibly important clause. It provides a competitive market for offshore electricity transmission, which is important because it helps us to achieve cost-effectiveness in the building and operation of offshore wind farm connections on to the national grid. The clause is part of our efforts to ensure the regime supports the UK’s continuing ambition to be a world leader in offshore wind.
The clause extends the time that wind farm developers who build their own transmission assets have to divest those assets to an independent offshore transmission owner. That time is currently 18 months and the clause increases it to 27 months. That period is known as the generator commissioning clause, or the GCC.
The clause addresses the increase in size and complexity of wind farms since the GCC was first introduced. My Department issued a call for evidence on the OFTO regime, which closed in February 2024 under the previous Government. The responses suggested that the GCC period was too short and should be extended due to the increase in the size and complexity of wind farms, which has led to an increased risk of developers experiencing technical faults, and has meant more time is required for more complex commercial negotiations.
Without the clause, we would expect to continue to see many offshore wind farms needing to request individual transmission licence exemptions, which we bring to this House for decision, if they are unable to transfer transmission assets within the current 18-month period. The vast majority of offshore wind farms entering the process since 2016 have needed to apply for one of these exemptions, with each exemption requiring a separate statutory instrument to be considered each time.
The clause is therefore expected to reduce very significantly the number of offshore wind farms requiring an exemption. The requirement for an exemption leaves wind farms at risk of shutting down, taking a source of renewable energy off the grid and endangering the UK’s energy security, which is of course something we all want to avoid. This is a technical but very important clause and I commend it to the Committee.
Question put and agreed to.
Clause 23 accordingly ordered to stand part of the Bill.
Clause 24
Use of forestry estate for renewable electricity
Question proposed, That the clause stand part of the Bill.
Our public forests are a national asset, providing vital environmental, social and economic benefits. They also offer an opportunity to contribute to our clean power by 2030 mission through the development of home-grown renewable electricity proposals. The clause will support this by enabling Forestry England to undertake activity relating to both small and large-scale renewable electricity projects on the public forestry estate.
Developments may take place on both forested and non-forested land within the public forest estate. There will, however, be no reduction in size of the estate and sites will be carefully selected. These powers will see us integrating technologies including solar, hydro and wind energy into our natural landscape, accelerating progress to net zero and helping to tackle climate change.
Principles underpinning renewable energy developments include ensuring that there is no net loss of woodland area, positive habitat restoration and maintaining a sustainable home-grown timber supply. Forestry England has already developed around 40 small-scale renewable energy installations, but under current legislation any excess electricity that Forestry England generates is wasted and cannot be exported to the grid. That includes rooftop solar and biomass heating to generate energy used at their various visitor centres and offices. The new powers will allow Forestry England to export electricity generated from its own projects to the national grid.
Without this change to legislation, there would continue to be an imbalance between English activities in this space and those that take place in Scotland in connection to renewables. Public land being managed by the forestry authorities in Scotland is currently able to be used to generate renewable electricity at commercial scale. I commend the clause to the Committee.
I have a couple of questions for the Minister on these very well intentioned measures. Again, there is a need for clear consultation with people who live locally. We accept that these forests are run by experts, and we pay tribute to them for the way in which they run our forests across the country, but there will be people who have an absolute passion for our forests. Believe me: we saw them in our inbox when I worked for an MP. We need some clarity on that.
My first question is how the powers will balance commercial activity with conservation duties. The Minister said that there are examples of where we have done that before. It is a genuine question. We must make sure that when there is a drive to allow this to happen, some of the conversation elements are not lost in the management of the forests, and that renewable projects do not undermine biodiversity, recreation or climate resilience.
Secondly, what criteria will determine when ministerial consent is required for projects? As I am sure we agree, clear thresholds are necessary for consistency and community confidence. Within that, there must be consultation of local people. As I said, it can be an incredibly emotive topic when people find out from their local forestry commission that it is engaging in some electricity generation. When it comes to our beautiful forests, such wording can mean that people need to be told about it properly and consulted properly. What is the Minister doing to ensure that that will be at the forefront of these projects? As I said, we have been there before.
Does the Minister have any concept of how income from renewable generation will be managed? Oversight mechanisms will be vital to ensure transparency and accountability in these commercial activities. Are there limits on the scale or type of renewable projects on public land to prevent industrial-scale developments, and how will local communities be engaged in decisions affecting their access to public land?
While the clause offers opportunities, it poses risks that need careful management, so I urge the Government to provide more details to ensure that the powers are used responsibly, and that there is no mission creep at the end of the day from this very well intentioned clause.
On page 35, line 20, the excluded types of fuel are listed, to determine what may be considered to be renewable. Waste to energy is not included; nor is the sustainable fuel mandate, which is currently focused on aviation fuel, but ultimately involves producing a gasoline product entirely from waste the purpose of which is to create energy. The fuel may go into aircraft, but it could be used for other purposes. The concept of waste to energy means, essentially, building an incinerator on forestry land to burn waste and generate electricity. By implication, that is something that the Government envisage as a result of that subsection. Could the Minister say more about that?
We expect the footprint from the projects to be incredibly small. In fact, the most successful projects in Scotland are often on the rooftops of visitor centres, alongside toilet blocks, and in those sorts of places, so we are not talking about cutting down huge areas of forest to build ground-mounted solar. However, the point the hon. Gentleman made about consultation is critical. There will be comprehensive public and statutory consultation, and I fully expect Forestry England to carry out an even more detailed engagement process, given its stewardship role for certain pieces of land.
In fact, in Scotland, where some projects have been carried out, groups of people who frequently use the forest have been involved in designing the projects and deciding what the money will be spent on. There are real benefits to that. Although there is sometimes short-term disruption from construction, often the projects have resulted in accessible routes being opened in Scottish forests, including new wheelchair-accessible paths, so previously inaccessible land is being made accessible. However, the hon. Gentleman is right about consultation.
On the subject of revenue stream, we expect the measures to enhance Forestry England’s wider role and its existing objectives, which do not shift as a result of the measures. Of course, those objectives relate to environmental conservation. In fact, the revenue, which is currently being wasted—the critical point is that these projects cannot export to the grid—could actually create a net benefit, and we would expect it to do so. That is an important point, as is the issue of mission creep. We will certainly keep that in mind.
I say the same to the hon. Member for Ruislip, Northwood and Pinner. As I think he would expect, schemes such as those he mentioned are not intended to be part of these measures However, I will consider whether we can tighten the guidance. The clause is intended to be about using land that, in some cases, already has some of these projects on it, but they cannot export to the grid. Small-scale solar or hydro—those are the sorts of schemes that we see as fitting alongside the wider mission of Forestry England. The hon. Gentleman raised an important point, and I am happy to write to the Committee about it.
Question put and agreed to.
Clause 24 accordingly ordered to stand part of the Bill.
Clause 25
Fees for certain services
Chapter 3 of part 1 of the Bill deals with reform of transport infrastructure. Its various clauses—all of which, I hope, are uncontroversial—are designed to streamline and improve the efficiency of delivering transport infra- structure projects. Clauses 25 to 29 of the chapter make various amendments to the Highways Act 1980.
As hon. Members will be aware, local authorities and statutory consultees provide advice, share information and prepare responses to consultations on proposed highway projects. However, they currently do not have a statutory basis on which to recoup the costs associated with the work they do to review the applications. That can lead to delays in processing applications due to a lack of resources, or information being received late in the process.
Clause 25 inserts a new section 281B into the 1980 Act, providing a new regulation-making power for the Secretary of State in England and for Welsh Ministers in Wales to charge applicants for services in connection with certain schemes and orders on a cost-recovery basis. To be clear, it will not allow them to make a profit; instead, it will support the capacity and capability of local planning authorities and statutory bodies to carry out those processes, which in turn will encourage timely and high-quality inputs into the process.
The charges will apply to parts of the Highways Act associated with approving new roads, making changes to existing ones and making other legal orders necessary for highway projects. Furthermore, we will use a proportionate delegated power to ensure that cost recovery and the provision of services remain flexible and responsive in the light of changing circumstances over time, such as inflation.
The clause will bring the Highways Act into line with cost recovery provisions established under other infrastructure consenting regimes. By resourcing the input from critical stakeholders, this power will contribute to the acceleration of highway infrastructure project delivery, supporting the Government's economic growth mission now and in the future. On that basis, I commend the clause to the Committee.
As I said, we welcome clause 25, which allows public authorities to charge fees for services related to specific highway schemes. None the less, some clarity is needed on several points. While recovering costs is reasonable, the clause must be carefully implemented with safeguards to ensure fairness, accessibility and consistency across England and Wales.
The Minister has stated that this is a reserved matter for certain statutory bodies and local planning authorities, but will he outline how this goes with his perfectly admirable stance on devolution? Will he look to allow new combined authorities and mayoralties to take on some of the powers, or is he planning for them to be devolved even further, to mayoral authorities coming on stream rapidly from the Department under this Government? We would like some clarity on how he sees the powers being amended once local authorities and some of those statutory bodies no longer exist or are reformed.
Has the Minister considered the impact of the fees on small developers, charities and community groups? Could they create barriers or delays in any process? Will there be provisions allowing fee waivers or reductions for certain applications, such as for community-led or rural projects? How will disputes about fee fairness be resolved, and will there be an appeals process? What guidance will there be to ensure consistency in fee application across regions, to avoid significant variations from one local authority or statutory body to another? Finally, could the fees delay or discourage essential infrastructure development, especially in areas with planning capacity challenges?
I think that the offset in costs will be welcomed by small developers. This provision is particularly important in the small authorities that cover large geographical areas, because it will enable them to go out and make visits. To give an example, my client was required to build a pavement but could not do so while there was a vaccination centre up the road. The local authority could not, under the fee structure, find the time to come out and visit the site, which would have enabled it to make a more sensible decision. In general terms, this provision is really welcome and developers, both small and large, will see this as a very positive step forward.
I have some concerns that I would like the Minister to comment on. Some authorities still have section 106 agreements, and I am concerned that developers will just move money from those section 106 agreements—money that is to be put into education or healthcare, for example—by saying in a viability assessment that they now have to pay these fees to the local authorities, particularly around highways. How can we stop it being the same money, just moved around? These fees should be additional to the money from section 106 agreements that the council was already getting, as they are going directly into capacity issues within planning departments. I am worried that developers will try to play games by just moving the same money around the system or cutting the same pie in a different way, which will not help local authorities. I would like to hear the Minister’s response to those comments, but I wholeheartedly support what the Government are trying to do in this specific case.
All the clause does is bring the Highways Act 1980 into line with the cost recovery provisions established under other infrastructure consenting regimes. It is broadly accepted that we need to support local planning authorities and statutory consultees to process applications in a timely manner. We think that will drive high-quality and timely—
It will be for the Secretary of State and Welsh Ministers to set out in regulations those bodies that are able to charge the fees; they may include bodies such as the Environment Agency and Natural England. Regulations and guidance will set out in more detail what advice and information will be covered by the cost recovery process, as well as other matters, including how fees are calculated, when fees can and cannot be charged and the point at which fees are charged.
We will get into separate issues relating to build out, but to respond gently to the point made by the hon. Member for Broxbourne, I cannot see how a very specific highways-related application will necessarily bleed over into section 106 negotiations. None the less, I will reflect on that point, as we do not want cost recovery provisions in the clause to allow developers to reduce section 106 contributions on the basis that they are having to pay this charge. As I said, delegated powers will ensure that the cost recovery power is future-proofed by ensuring that it is flexible enough to account for changes, not least in inflation, which we have discussed before.
Question put and agreed to.
Clause 25 accordingly ordered to stand part of the Bill.
Clause 26
Power of strategic highways company in relation to trunk roads
Question proposed, That the clause stand part of the Bill.
Trunk roads are major routes in our highways network that are managed by National Highways instead of local authorities. Having the power to make a road a trunk road is an essential step in ensuring that key roads are maintained at the national level. Trunk roads perform an important role in enabling safe, reliable and often long-distance journeys by both people and goods between our major towns and cities, and provide access to our international gateways.
The current system places much of the process for handling requirements of these section 10 orders—namely their preparation and publicity—on the Secretary of State, rather than the highways body itself. Clause 26 will simply transfer the administrative control of the application from the Secretary of State to the strategic highways authority—National Highways. It will also align the handling process with the way in which applications under other parts of the Highways Act are currently managed.
I stress that the Secretary of State will remain the ultimate decision maker on the application. However, by removing the administrative burden from the Secretary of State, clause 26 will create a more efficient process, which we believe will lead to faster decisions on new and upgraded trunk roads. This will help to deliver road improvements more quickly, support economic growth, enhance transport links and reduce congestion.
I gently say to the shadow Minister, the hon. Member for Ruislip, Northwood and Pinner, that he is comparing apples and pears. To be as clear as I possibly can be, all the requirements set down in the legislation in respect of preparing and publishing materials, and the fact that the Secretary of State remains the decision maker, remain in place. The clause purely changes the body overseeing the administrative actions associated with those applications. On that basis, I think this is a fairly uncontroversial procedural change. We have committed to write to the hon. Gentleman about any possible interactions with the Greater London Authority’s management of red routes. On that basis, I commend the clause to the Committee.
Question put and agreed to.
Clause 26 accordingly ordered to stand part of the Bill.
Clause 27
Deadlines for consultation and decisions on certain orders and schemes
Question proposed, That the clause stand part of the Bill.
Reducing the objection period will speed up the consenting process without sacrificing the safeguards that are essential for the fair consideration of objections. An objection period of 30 days aligns with the relevant objection periods for other transport consenting regimes, such as the Planning Act 2008. Again, I draw the shadow Ministers’ attention to the fact that, as per the previous clauses, we intend to align the Highways Act provisions with those in other consenting regimes, to provide for a more uniform arrangement across the piece.
Additionally, the clause will introduce a 10-week deadline for the Secretary of State to make decisions on these schemes and orders. Currently, there are no statutory deadlines for the decision-making stage for the relevant processes, unlike in other consenting regimes, such as the Planning Act 2008. Bringing the Highways Act into alignment with other consenting regimes will improve certainty and the efficiency of the process. The power for the Secretary of State to extend the decision deadline, if necessary, ensures flexibility in cases where additional time may be required.
By shortening the objection period and setting a clear decision timeframe, the clause makes the process more predictable for all stakeholders. Faster, more predictable decisions will result in more efficient delivery of transport infrastructure projects, contributing to better transport networks. We think this change strikes the right balance between improving speed and maintaining fairness, ensuring that the process remains transparent and accountable. I commend the clause to the Committee.
The clause updates the objection and decision-making timelines under the Highways Act 1980. Although the goal is to align with other planning regimes, several concerns remain. First, the clause reduces the objection period in England to a minimum of 30 days, but maintains it at six weeks in Wales. What justifies that discrepancy? Should there not be consistency across all authorities?
Furthermore, is it not the case that reducing the objection period may limit the time available for affected parties to prepare responses? I know that this is outside the remit of this very prescriptive clause, but many constituents will say that they did not get the letter or see the things that were posted, or that local people simply were not able to see things. I really think that this 30-day restriction will harm many average Joes—I hate that term, but I do not know how else to put it. People out there, who have busy lives, busy jobs and families, and who are working on their daily lives, will really struggle, in the first place, to see things within 30 days. However, they will also not know that the period is now 30 days and may therefore not be consulted on some of the actions that authorities may take.
I ask the Minister to assess whether 30 days is the right length of time. I am not talking about having an unrestricted length of time for consultation, and we absolutely need to make sure, if we want to deliver on some of these policies, that the timeframe is reasonable. However, I question whether 30 days is far too rapid and will cause more harm than good to the consultation rights of the British public. I would also ask what systems will be in place to notify stakeholders of deadline changes and extensions in individual cases, to ensure clear and accessible communication.
I have a last question. While the intent of the clause is to streamline processes, we must ensure fairness, transparency and quality decision making, allowing stakeholders to engage meaningfully. We absolutely accept that there is currently no statutory deadline. Ten weeks is adequate, but on the 30 days element of the consultation period, when we think about people out there with busy lives, I think could cause a huge problem for democratic accountability and for the transparency of the system in allowing local people to have their say. I ask the Minister to look at that 30 days again, but we will not press the clause to a Division.
We think that 30 days is the appropriate period, that the existing arrangements, which set out a period of not less than six weeks, are too long, and that we should bring the Highways Act into line with the other regimes. On that basis, we do not think that the clause sets a precedent for the shortening of objection periods, because objection periods of about four weeks, as I have said, can be found in other infrastructure consenting regimes. That is an adequate period of time in which to submit objections.
The shadow Minister asked another, separate question about the Secretary of State’s ability to extend deadlines from the 10-week period. Again, in any such instances, the Secretary of State would need to send written notice of the extension to the relevant parties in those cases, setting out why an extension is required. I hope that on that basis the shadow Minister is reassured about the use of that particular part of the clause.
Question put and agreed to.
Clause 27 accordingly ordered to stand part of the Bill.
Clause 28
Procedure for certain orders and schemes
Question proposed, That the clause stand part of the Bill.
An SI is currently required for applications to make or unmake a trunk road or special road, to construct a special road, or to build a road bridge over or road tunnel under navigable waters. Those statutory instruments are not subject to any parliamentary procedure, but they take extra time to prepare. That represents an unnecessary and disproportionate burden of bureaucracy in our view.
As I have mentioned, the Highways Act already contains a quicker process for confirming other types of application via a confirmation document issued by the Department for Transport. The clause will simply allow the applications to which I have referred to be confirmed via a confirmation document issued by the Department. In short, that again aligns the handling processes across the relevant parts of the Highways Act. That will support the Government’s goal of speeding up the consenting of transport infrastructure by streamlining the process.
To maintain transparency in the decision-making process, the clause ensures that a confirmation notice must be published in the public domain. I commend the clause to the Committee.
Question put and agreed to.
Clause 28 accordingly ordered to stand part of the Bill.
Clause 29
Compulsory acquisition powers to include taking of temporary possession
Question proposed, That the clause stand part of the Bill.
The intention of the clause is to provide clarity that project promoters, under the Highways Act 1980 regime, can temporarily use and possess land by compulsion. It does so by introducing a clear and proportionate legal power to require authorities that have already identified a piece of land as necessary for the planned construction of the proposed highway works to temporarily use land when they cannot reach agreement with the landowner, while also protecting landowner rights to regain their land and support compensation mechanisms.
By reducing legal ambiguity, the power will help to shorten often protracted land negotiations, speeding up the process to submit an application for highways works, ultimately thereby delivering transport projects quicker. In doing so, it will contribute to the Government’s ambition to simplify the consenting of major transport infrastructure projects.
Will there be an assurance that that process will provide for an appropriate level of compensation for the landowner whose land is being taken temporarily, as that often seems to be a source of dispute? This should not become a back-door way by which a highways agency, as the lead body, says, “We are going to take that at no recompense,” rather than going through a process of negotiation to achieve an agreed sum in respect of the loss of amenity to the owner of the land.
It is worth saying that there is a temporary possession power in the Neighbourhood Planning Act 2017. It is a different mechanism; it has not yet been enacted. We are trying to achieve a fairly simple clarification through the Bill, which will not require us to enact powers that are above and beyond what is required under the simplification to which the clause gives effect. It is an uncontroversial procedural change that will make the process more certain and efficient for both parties and provide them with reassurances.
Question put and agreed to.
Clause 29 accordingly ordered to stand part of the Bill.
Clause 30
Replacement of model clauses with guidance
Question proposed, That the clause stand part of the Bill.
Clause 30 allows the Secretary of State in England and Welsh Ministers in Wales the power to move template model clauses from legislation into guidance. The model clauses are intended to streamline the drafting of Transport and Works Act orders, but they can currently only be amended through secondary legislation. Setting them out in more flexible guidance, rather than legislation, will allow them to be updated more regularly via a more efficient and faster process. That supports the Bill’s aim of simplifying and streamlining transport rules, ensuring that we have a more efficient legal framework moving forward. On that basis, I commend the clause to the Committee.
Question put and agreed to.
Clause 30 accordingly ordered to stand part of the Bill.
Clause 31
Removal of special procedure for projects of national significance
Question proposed, That the clause stand part of the Bill.
The purpose of clause 31 is simply to remove a redundant section of the Transport and Works Act, which refers to schemes considered to be “of national significance”. Since the Planning Act 2008 was introduced as the consenting regime for nationally significant infrastructure projects, with clearly defined thresholds for what is considered “of national significance”, it has effectively rendered that part of the Transport and Works Act entirely redundant.
The effect of the clause is a simple procedural fix. By removing outdated references, the clause will make it easier for developers and public bodies to understand and apply the law, while also reducing administrative burdens. I commend the clause to the Committee.
“not apply in relation to an application in respect of which a notice”
has been made
“before this section comes into force.”
Early on in his remarks, the Minister referred to sections of the Neighbourhood Planning Act 2017 that have not come into force, eight years after they underwent scrutiny in a Committee like this one and Parliament passed them. This clause may not come into force for some considerable time after we debate it in Committee and the Bill becomes law—indeed, it may never come into force. If the previous legislation remains the relevant legislation for an extended period, or if a developer sees advantage in securing a permission now, under the previous legislation, before the new measures take its place, do we have an appropriate process for dealing with that?
I am more than happy to write to the shadow Minister with further detail, but I think he raises a valid point. We think the redundant section 9 should be removed from the Transport and Works Act to give developers and public bodies clarity on how the law should be applied going forward, while also reducing administrative burdens. The easiest way—mindful of your strictures, Mrs Hobhouse—to move the Committee on and ensure that we can debate important clauses later in the Bill is for me to commit to writing to the shadow Minister with exhaustive detail on that point.
Question put and agreed to.
Clause 31 accordingly ordered to stand part of the Bill.
Clause 32
Duty to hold inquiry or hearing
Question proposed, That the clause stand part of the Bill.
The length of the inquiry process can range greatly depending on the complexity of what is being examined, from six months to two years. Clause 32 will mean that a public inquiry is held only when an objection is raised that is considered by the determining authority to be serious enough to merit such treatment. A streamlined process for considering objections saves time and cost for applicants. All objections will continue to be decided—I want to stress this point—entirely on the merits of the arguments put forward. This not about removing the voices of individuals or communities; instead, it ensures that the objections process remains proportionate, so serious objections are given due attention.
Clause 33 makes amendments to section 11 of the Transport and Works Act regarding decisions on costs arising from a public inquiry. It will enable an inspector conducting the public inquiry to make decisions on those costs, unless the Secretary of State or Welsh Ministers direct that a cost decision is to be determined by them. Currently, the inspector must write a report with recommendations of costs to the Secretary of State based on the conduct of parties taking part in the public inquiry. That approach contrasts with the Planning Act 2008, where cost decisions are made by the examining authority.
By delegating the decision-making capability to the inspector conducting the inquiry, we will ensure that claims are resolved more quickly for all stakeholders. That will reduce administrative burden in determining such cases and save time, helping to deliver transport infrastructure more efficiently. The Secretary of State in England, and Welsh Ministers in Wales, will retain the ability to direct that a cost decision is to be determined by them should they not wish to delegate responsibility on a potentially contentious case. The clauses, as I have argued, will reduce unnecessary bureaucracy and administrative burdens, helping to deliver transport infrastructure more efficiently. I commend them to the Committee.
“considers that the objection is serious enough”.
It argued:
and does not aid clarity. It
It would be useful to get clarification on what exactly the Government mean by “serious enough”. There is, if I recollect correctly, guidance for inspectors in the Town and Country Planning Act on when to decide to hold a public inquiry as opposed to an informal hearing, or to consider an appeal by written representations. It seems appropriate that if the clause is to be brought in, there should be some guidance and reassurance on what is considered serious enough, because the proposed test in the clause is extremely arbitrary.
For example, when an objection comes from a landowner whose land would be affected by compulsory purchase; when a local authority for the area concerned receives an objection that they do not consider frivolous or trivial; or when other concerns are raised that need to be considered, a public inquiry or hearing takes place. In many circumstances, that is appropriate. In others, it may be the case that an exchange of correspondence, for example, can achieve the same goal without the need for a lengthy and costly public inquiry. I hope that gives him some reassurance as to the type of circumstances—
The hon. Member raises an entirely valid point about the fact that it will be for the Secretary of State for Transport to decide on a case-by-case basis when objections meet the test that he rightly reiterated. I will reflect on how we might provide further clarity, perhaps through guidance on the circumstances in which that test should be applied, but I recognise there is a fair challenge about what cases will come through this route.
I hope the hon. Member will recognise that the problem we are trying to resolve is that under certain circumstances, as things stand, a public inquiry or hearing can be triggered where it is not necessary, and there may be a far more proportionate way of moving things on and responding to objections—for example, in an exchange of correspondence. I hope that reassures the hon. Gentleman somewhat. As I have said, I am happy to reflect and come back to the Committee with further thoughts on this point.
Question put and agreed to.
Clause 32 accordingly ordered to stand part of the Bill.
Clause 33 ordered to stand part of the Bill.
Clause 34
Deadline for decisions
Question proposed, That the clause stand part of the Bill.
Clause 35 seeks to modernise the way decisions under the Transport and Works Act are communicated. It enables the Secretary of State or Welsh Ministers to issue a notice online when publicising a decision on an application for a Transport and Works Act order and removes the requirement to publish the notice in the London Gazette. Moving to digital advertising will mean that notification of decisions can be done on the same day as decisions are finalised, which will ensure that there are no delays in communication and provide a more efficient service to interested parties. The clause also provides that any legal challenges must be filed within six weeks, starting the day after the notice is published, bringing the timeline in line with other consenting regimes.
By making use of modern technology, we will bring the Transport and Works Act into the 21st century, helping to speed up the process and deliver transport schemes more quickly. I commend the clauses to the Committee.
Question put and agreed to.
Clause 34 accordingly ordered to stand part of the Bill.
Clause 35 ordered to stand part of the Bill.
Clause 36
Fees for certain services
Question proposed, That the clause stand part of the Bill.
Supporting the capacity and capability of local planning authorities and statutory bodies will encourage timely and high-quality inputs into the process, which will speed up the delivery of highways infrastructure projects. I commend the clause to the Committee.
We believe that without clear limits, there is a risk of inconsistent or excessive charges and a disproportionately wide range of fees across authorities. What mechanisms will be in place to allow applicants to challenge or appeal fees that they consider unreasonable? What impact does the Minister think this measure may have on smaller companies in the supply chain, which may be less able to absorb the costs that will be imposed? We do not disagree with the principle of the clause; we just have some questions about the detail.
Finally, how will the Secretary of State or Welsh Ministers review or update the regulations? As costs and administrative practices evolve, it is crucial that the regulations are reassessed regularly to ensure that they remain fair, relevant and effective. Will the Minister remark briefly on that and on some of the smaller businesses that may be affected?
Adjourned till this day at Two o’clock.