Full up is fully down, but fully up is empty
Introduction
The photograph on this page of Full up is fully down, but fully up is empty by A-M-Jervis as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image: © A-M-Jervis Taken: 17 Feb 2008
By the middle of February 2008 the contractors dredging the Union Canal were working in the Allan Park area, between Slateford and Craiglockhart, but the dredged mud was still being transferred from barge to lorry near the Leamington Lift Bridge in Edinburgh. This necessitated a steady stream of tugs propelling hopper barges over the intervening 2½ miles. Here "Dignity" is proceeding eastwards with a full barge and passes "Scaup" returning for another load. The difference in freeboard between full and empty barges is most noticeable.