Lloyds Stabilisation 2008

Introduction

The photograph on this page of Lloyds Stabilisation 2008 by Mike White as part of the Geograph project.

The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.

There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Lloyds Stabilisation 2008

Image: © Mike White Taken: 6 Jul 2008

Lloyds Stabilisation project, due for completion Autumn 2008. 370 tubular steel piles 10 - 20 metres long are being driven into the bank on both sides of the River Severn, to curb the natural tendency of the sides of the Severn Gorge to slid into the water. The works are duplicated on both sides of the river, with 90-ton cranes and 100-ton pile-drivers. Sabrina looks rather subdued--at the moment...

Images are licensed for reuse under creativecommons.org/licenses/by-sa/2.0

Image Location

coordinates on a map icon
Latitude
52.625452
Longitude
-2.468701