Weaste tram stop crossover - Manchester Metrolink
Introduction
The photograph on this page of Weaste tram stop crossover - Manchester Metrolink by TramographyMCR as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image: © TramographyMCR Taken: 3 Mar 2025
The crossover track at Weaste tram stop. Track improvement works were recently finished around this area (1~25 February 2025), which removed a 5mph Temporary Speed Restriction at the eastern end (closest to the camera) of the Eccles-bound track (left-hand track) and the surface the tracks are embedded in looks like it has been redeveloped as well.
