HS2 works, West Ruislip, May 2023 – Breakspear Road South
Introduction
The photograph on this page of HS2 works, West Ruislip, May 2023 – Breakspear Road South by Robin Stott as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk
Image: © Robin Stott Taken: 26 May 2023
The photograph was taken from a Birmingham-bound Chiltern Railways service speeding out of Marylebone; the view is back toward the HS2 works at West Ruislip where the line will emerge from under west London at the western portal of the Northolt Tunnels. What follows is partly speculation. A short way to the west of the tunnel the railway has to cross a river and a road. The photo shows the partly-constructed bridge over Breakspear Road South. The shiny new conveyor belt structure is incomplete – no belt – but it supports the idea that this area will be the destination for spoil from the tunnel-boring; the spoil being used to construct the embankment that will carry the railway at bridge-height. Image reference: 7499042