Stone sleepers on Brusselton Incline

Introduction

The photograph on this page of Stone sleepers on Brusselton Incline by David Robinson as part of the Geograph project.

The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.

There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Stone sleepers on Brusselton Incline

Image: © David Robinson Taken: 22 Oct 2022

The original route of the Stockton & Darlington Railway from Witton Park Colliery to Stockton untilised two rope hauled inclines, one at Brusselton and one near the pit at Witton Park. Brusselton incline took the railway over the low hills that form the watershed between the Wear and Tees valleys between Shildon and Bishop Auckland. A permanent stationary engine at the summit was used to power the rope worked incline. The Brusselton Incline remained in use until 1856. By that time the S&DR had tunnelled under the watershed when creating the branch to Bishop Auckland and Crook. A new line on the level was therefore built from the north end of the tunnel making Brusselton Incline redundant. The image shows original stone sleepers in situ on the northern side of Brusselton Incline.

Images are licensed for reuse under creativecommons.org/licenses/by-sa/2.0

Image Location

coordinates on a map icon
Latitude
54.624919
Longitude
-1.673169