HS2 enabling works, Crackley, March 2022 (1/2)

Introduction

The photograph on this page of HS2 enabling works, Crackley, March 2022 (1/2) by Robin Stott as part of the Geograph project.

The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.

There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

HS2 enabling works, Crackley, March 2022 (1/2)

Image: © Robin Stott Taken: 17 Mar 2022

Viewed from a Coventry-Leamington Spa train, a cutting is being formed to take HS2 under the existing line. Beyond the gaggle of machines is the A429 Kenilworth Road and the Canley Brook. I've been told that the line will be closed for 200 hours while a section of track is removed, the cutting is completed by removing the supporting embankment, a new bridge dropped into place and the existing line reconnected: job done! A date for the photographer's diary.

Images are licensed for reuse under creativecommons.org/licenses/by-sa/2.0

Image Location

coordinates on a map icon
Latitude
52.361429
Longitude
-1.5578