HS2 enabling works, Welsh Road area, September 2021 (14)

Introduction

The photograph on this page of HS2 enabling works, Welsh Road area, September 2021 (14) by Robin Stott as part of the Geograph project.

The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.

There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

HS2 enabling works, Welsh Road area, September 2021 (14)

Image: © Robin Stott Taken: 18 Sep 2021

The widened Ridgeway Lane reaches the western boundary of the HS2 site whose front gate is off Welsh Road in Image Tunnelling under Long Itchington Wood starts from this site: ahead is a mound of spoil from the enabling excavations. It was reported that a tunnelling machine is being assembled from parts flown in from Germany: the white structure relates to that: see Image