Bath : Combe Down Tunnel
Introduction
The photograph on this page of Bath : Combe Down Tunnel by Lewis Clarke as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image: © Lewis Clarke Taken: 6 Aug 2020
This section of the Somerset and Dorset Railway, including the tunnels, is now incorporated into a shared-use walking and cycling path. Planning permission was approved in May 2008 and much of the funding came from a Sustrans Connect2 grant. The fourth and final £100,000 tranche of council funding was made in the 2011/12 financial year; the tunnel was equipped with a cycle-friendly surface and LED lighting. The route was opened on 6 April 2013.