Some work to do here
Introduction
The photograph on this page of Some work to do here by John Winder as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk
![](https://s0.geograph.org.uk/geophotos/06/32/04/6320477_77e6ef72.jpg)
Image: © John Winder Taken: 28 Jul 2019
The dry bed of the Montgomery Canal at Crickheath. The intention is to restore the entire canal route to Newtown with a target date for completion of 2029, subject to funding materializing; looking at this section, untouched since the canal was closed in 1936, there's a lot of work to do before reopening becomes a reality.