Slow progress with railway electrification, Newport
Introduction
The photograph on this page of Slow progress with railway electrification, Newport by Robin Drayton as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image: © Robin Drayton Taken: 19 Nov 2018
The electrification of the South Wales Mainline from London to Cardiff has been delayed and is now scheduled to be completed sometime in 2019. Gantries for the overhead cables have been erected but the cabling has yet to be completed. The houses in the background are part of a recent development on what was once railway sidings. See http://www.geograph.org.uk/photo/1135819 for a photo of this location in 2008 and https://www.geograph.org.uk/photo/3032227 for a photo in 2012.