Image: © Nigel Cox Taken: 27 Oct 2018
The area of Holland Cliff between Hazlemere Road and Kings Avenue is currently having stabilisation works carried out. A length of some 430 metres of cliff is being stabilised and here piles have been driven into the ground ready to accept sections of sheet metal piling. The work is planned to be finished by late spring 2019.