Wye School, Kempe Centre, Olantigh Road
Introduction
The photograph on this page of Wye School, Kempe Centre, Olantigh Road by John Baker as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk
Image: © John Baker Taken: 7 Oct 2018
Planning permission of amended plans has been granted by Ashford Borough Council under application number 16/01548/AMND/AS for a “revision to fenestration on teaching block and sports hall building and Kempe Centre; addition of roof ventilation turrets/rainwater pipes on teaching block and sports hall; flues to Kempe Centre, installation of a fence; addition of steps on Olantigh Road boundary; removal of trees to access substation; amendment to position of fence along Olantigh Road on planning permission 16/01548/AS (phases 2 and 3 of the proposed Wye School expansion comprising permanent use of the Kempe Centre for school use; refurbishment of the Kempe Centre to include new sixth form accommodation and minor alterations to the external appearance of the building to reflect internal reconfiguration; retention of the two existing temporary classroom cabins until the end of the 2018/2019 academic year; demolition of existing structures and some trees; erection of a new building comprising the main hall, 4-court sports hall and new teaching accommodation; new coach, car and cycle parking provision; new soft and hard landscaping; off-site highways works on Olantigh Road and other associated works)”. The construction site is located beyond the gate at the far end of the road.