Exchange Square Tram Stop, Corporation Street
Introduction
The photograph on this page of Exchange Square Tram Stop, Corporation Street by David Dixon as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image: © David Dixon Taken: 25 Jan 2017
Bombardier M5000 tram (number 3032 in the Metrolink fleet) waits at the Exchange Square tram stop ready for its journey to Rochdale. The Exchange Square stop is the 93rd and newest stop on the Metrolink network; the first passenger services pulled into the stop on Sunday, 6 December 2015. The new stop is on Corporation Street between Exchange Square and the Manchester Arndale. It in the heart of the busy shopping and leisure district, providing easy access to shops, bars, restaurants and entertainment venues, including Manchester Arndale, the Corn Exchange and The Printworks, the Medieval Quarter and the National Football Museum and (during December) the Christmas Markets.. This area is now pedestrianised with no access to traffic between Withy Grove and Market Street/St Mary’s Gate. The new stop has a modern design making the most of limited space in Exchange Square while keeping plenty of room for pedestrians. The striking pavilion style stop has an ‘island’ platform, brightly coloured steel and glass shelter and unique ‘floating’ overlapping glazed roof panels. On-stop ‘furniture’ such as passenger information displays and seating, has been integrated into polished concrete columns to give the stop a clean, uncluttered design. The step-free ramped access to Exchange Square is located at the southern end of the stop near to the bottom of the Manchester Arndale steps. The Exchange Square stop marks the first stage of the Metrolink Second City Crossing through the heart of the city. Construction work started on the 0.6km stretch of line between Victoria Station and Exchange Square in summer 2014 following utility diversions. It is anticipated that the line to St Peter’s Square will become operational during the first quarter of 2017.
