Hadley Wood North Tunnels
Introduction
The photograph on this page of Hadley Wood North Tunnels by Marathon as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image: © Marathon Taken: 4 May 2016
The Great Northern Railway opened its line between Maiden Lane and Peterborough through what is now Hadley Wood in 1850. The station was opened on 1st May 1885 by the Great Northern Railway. There are tunnels in both directions, close to the station. Hadley Wood North Tunnels seen here are just over 200 yards long, whereas Hadley Wood South Tunnels are nearer 400 yards. The original tunnel from 1850 is on the right and the newer one from the early 1890s on the left. The station has four platforms, but only the outer platforms are in everyday use by stopping trains, with high speed services using the central tracks. The inner platforms have recently been re-surfaced however, and can be used during emergencies. This view is from the down slow platform.
