Cycleway crossing Dundas Street, Bonnyrigg

Introduction

The photograph on this page of Cycleway crossing Dundas Street, Bonnyrigg by Jim Barton as part of the Geograph project.

The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.

There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Cycleway crossing Dundas Street, Bonnyrigg

Image: © Jim Barton Taken: 5 Feb 2015

Decorative railings where the Penicuik to Dalkeith footpath and cycleway meets the B704 at Dundas Street. Note the Bonnyrigg station sign top left. The yellow sign informs that the route onwards is closed until 29th May when the alternative path network around the Borders Railway has been completed. A diversion has been signposted, though the cyclepath can still be followed as far as the footbridge over the A7 at Hardengreen.

Images are licensed for reuse under creativecommons.org/licenses/by-sa/2.0

Image Location

coordinates on a map icon
Latitude
55.872777
Longitude
-3.101569