New generator erection
Introduction
The photograph on this page of New generator erection by Jonathan Wilkins as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk
Image: © Jonathan Wilkins Taken: 16 Jan 2014
During the long closure of the low-head system while the pipeline is renewed from Coedty Reservoir, the opportunity has been taken to install a new turbine and generator for Unit 4. The construction of the new bed for the generator is in progress, while the rotor of the generator can be seen beneath wrapping to the right.