Lifting the tracks, Battersea Park station
Introduction
The photograph on this page of Lifting the tracks, Battersea Park station by Christopher Hilton as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image: © Christopher Hilton Taken: 21 Oct 2013
From a train bound for Clapham Junction, the two platforms previously used for the "circular" service via Peckham Rye to London Bridge. The introduction of London Overground trains to Clapham Junction along most of that route and the need to use the train paths into London Bridge for expanded Thameslink services mean that the "circular" service no longer runs; accordingly, the platforms at Battersea Park are no longer needed. Extension of the platforms serving Clapham Junction so that they can take longer trains will cut off the route previously taken by the "circular" service. Here, the tracks are already lifted from platform 1, which housed trains from Victoria to London Bridge, whilst works going on at the Victoria end of the station had severed the surviving track on platform 2.
