Chelker Reservoir & Wind Farm

Introduction

The photograph on this page of Chelker Reservoir & Wind Farm by Lynne Kirton as part of the Geograph project.

The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.

There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Chelker Reservoir & Wind Farm

Image: © Lynne Kirton Taken: 7 Aug 2005

Chelker Reservoir, near Addingham, N.Yorkshire, was put into service in 1866 & serves the Bradford area. It has a surface area of 52.3 acres & is 215m above sea level. The 4 turbine windfarm, operated by Yorkshire Water Services, came online in December 1992 & has a total capacity of 1.2 mw. The turbines pump water from the River Wharfe up to the reservoir.

Images are licensed for reuse under creativecommons.org/licenses/by-sa/2.0

Image Location

coordinates on a map icon
Latitude
53.959559
Longitude
-1.917666