Demolition, Bangor

Introduction

The photograph on this page of Demolition, Bangor by Rossographer as part of the Geograph project.

The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.

There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Demolition, Bangor

Image: © Rossographer Taken: 5 Apr 2013

Demolition of the former school. The copper roofed building is the former assembly hall which will be knocked down (the valuable copper roof will be removed first - I watched this happen with other parts of the campus). The grey Crosby Building behind will be retained and renovated. Still awaiting demolition on the immediate left is part of the former preparatory department Connor House which closed in June 2011.

Images are licensed for reuse under creativecommons.org/licenses/by-sa/2.0

Image Location

coordinates on a map icon
Latitude
54.664464
Longitude
-5.660048