Metrolink construction site from Mauldeth Road West, Chorlton-cum-Hardy

Introduction

The photograph on this page of Metrolink construction site from Mauldeth Road West, Chorlton-cum-Hardy by Phil Champion as part of the Geograph project.

The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.

There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Metrolink construction site from Mauldeth Road West, Chorlton-cum-Hardy

Image: © Phil Champion Taken: 18 Dec 2011

The railway line was closed in the 1960s, but is to reopen as part of an extension to the Metrolink tram network to East Didsbury. Work was well underway, with the new line scheduled to open in Summer 2013. Construction work was well underway by December 2011.

Images are licensed for reuse under creativecommons.org/licenses/by-sa/2.0

Image Location

coordinates on a map icon
Latitude
53.436913
Longitude
-2.260676