Metrolink construction site from Mauldeth Road West, Chorlton-cum-Hardy
Introduction
The photograph on this page of Metrolink construction site from Mauldeth Road West, Chorlton-cum-Hardy by Phil Champion as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image: © Phil Champion Taken: 18 Dec 2011
The railway line was closed in the 1960s, but is to reopen as part of an extension to the Metrolink tram network to East Didsbury. Work was well underway, with the new line scheduled to open in Summer 2013. Construction work was well underway by December 2011.