400KV line maintenance (1)
Introduction
The photograph on this page of 400KV line maintenance (1) by Peter Facey as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image: © Peter Facey Taken: 28 Apr 2009
400KV pylons passing through Orchard Copse, North Boarhunt. An intrepid National Grid employee is travelling toward the camera in a cart suspended upon the lower two of the four conductors comprising a particular phase of the righthand circuit. Compared with those above, this bundle can be seen to be separated, because the man is removing, one by one as he encounters them, the cross-shaped separators that normally hold the four conductors in configuration. The purpose of so doing, I am told, is to enable a robot to run along each conductor and test it so see how much grease remains within. Each conductor consists of many aluminium wires wrapped spirally with a central steel core for strength. Grease is applied at time of manufacture to prevent ingress of moisture and pollutants which would greatly accelerate corrosion. Men can also be seen standing upon each of the two lower cross arms of the pylon at left. Next Image
