The photograph on this page of Owen Street Relief Road - Box Jack 3-42pm by John M as part of the Geograph project.

The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.

There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Owen Street Relief Road - Box Jack 3-42pm

Image: © John M Taken: 11 Apr 2009

At Easter a 6500 tonne underpass is being jacked under the West Coast Main Line requiring a four day closure of the railway. The box was cast on site adjacent to the railway and will be pushed into place by hydraulic rams at a rate of 2.5 to 3m per hour. Excavation will take place to remove the embankment ahead of the advancing box which was programmed to take 27 hours to complete the slide. Progress was about 0.5 to 1m per hour this morning but appears to have accelerated as the team got into their stride. The box had moved 26.5m and had completed over one third of the proposed slide. The jacking work will continue through the night.