Preparatory works
Introduction
The photograph on this page of Preparatory works by Dennis Turner as part of the Geograph project.
The Geograph project started in 2005 with the aim of publishing, organising and preserving representative images for every square kilometre of Great Britain, Ireland and the Isle of Man.
There are currently over 7.5m images from over 14,400 individuals and you can help contribute to the project by visiting https://www.geograph.org.uk

Image: © Dennis Turner Taken: 28 Feb 2009
Temporary fencing to protect the public from tree felling and site clearance work. It is believed that the works to be carried out after site clearance are part of a flood alleviation scheme. A main sewer, surface water drains and Flookers Brook run in culverts under Liverpool Road into the site near this point and become the Bache Brook.
Image Location






