ROADWORKS SUMMARY
Nunnery Lane, YORK, YO23 1JG
Introduction
View current and future planned roadworks and road closures for Nunnery Lane, YO23 1JG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Nunnery Lane, YORK, YO23 1JG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Nunnery Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
13 Apr 2022 and 13 Jun 2025
City Of York Council are proposing to carry out roadworks on Water End, Clifton, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 April 2022 and could run through until 13 June 2025. The works will impact the footway, carriageway, verge and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of York Council on 2 Feb 2023 at 08:43.
27 Jan 2025
City Of York Council are carrying out roadworks on Leeman Road, Beckfield, York.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 April 2023 at 07:00 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 2 Sep 2024 at 08:17.
27 Jan 2025
City Of York Council are carrying out roadworks on Leeman Road, Beckfield, York.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 3 July 2023 at 08:00 and could run through until 27 January 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by City Of York Council on 18 Nov 2024 at 15:25.
22 Oct 2025
City Of York Council are carrying out Highway improvement works on Queen Street, Bishophill, York.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2024 at 06:00 and could run through until 22 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 12 Aug 2024 at 15:39.
31 Jan 2025
City Of York Council are carrying out Highway improvement works on Front Street, Westfield, York.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 7 Oct 2024 at 09:46.
4 Nov 2024 and 4 May 2025
Network Rail are proposing to carry out Works for Rail Purposes on Leeman Road, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 4 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 22 May 2024 at 09:55.
4 Nov 2024 and 4 May 2025
Network Rail were proposing to carry out Works for Rail Purposes on Leeman Road, York.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 4 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 4 Oct 2024 at 12:48.
25 Feb 2025
City Of York Council are carrying out roadworks on Oxford Street, Bishophill, York.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 10:00 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 14 Nov 2024 at 12:53.
2 Dec 2024 and 28 Mar 2025
City Of York Council were proposing to carry out Highway improvement works on Appleton Road, Bishopthorpe, York.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 28 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by City Of York Council on 11 Dec 2024 at 11:15.
2 and 19 Dec 2024
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Oct 2024 at 12:53.
2 and 22 Dec 2024
Yorkshire Water were proposing to carry out Utility repair and maintenance works on Woodlands Grove, Monk, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 12 Nov 2024 at 10:11.
18 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Woodlea Avenue, Acomb, York.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 13:55 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 11:26.
Monday
Yorkshire Water are carrying out Utility repair and maintenance works on North Lane, Micklegate, York.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 12:57 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 14:02.
Tomorrow
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Brinkworth Terrace, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 19 Sep 2024 at 11:11.
Monday
Yorkshire Water are carrying out Utility repair and maintenance works on Haxby Road, New Earswick, York.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 08:00 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 14:50.
Tuesday
Yorkshire Water are carrying out Utility repair and maintenance works on Common Road, Dunnington, York.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 December 2024 at 13:30 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 15:50.
17 and 19 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Elvington Terrace, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 25 Sep 2024 at 08:54.
17 and 19 Dec 2024
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Elvington Terrace, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 27 Sep 2024 at 08:36.
6 Jan and 31 Mar 2025
City Of York Council are proposing to carry out Highway improvement works on Appleton Road, Bishopthorpe, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by City Of York Council on 11 Dec 2024 at 11:49.
6 and 27 Jan 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Lang Road, Bishopthorpe, York.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Sep 2024 at 09:46.
6 and 27 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Lane, Bishopthorpe, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Jul 2024 at 12:41.
6 and 27 Jan 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Church Lane, Bishopthorpe, York.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Sep 2024 at 09:45.
6 Jan and 3 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sim Balk Lane, Bishopthorpe, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Jul 2024 at 12:38.
6 Jan and 7 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Sim Balk Lane, Bishopthorpe, York.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 14:35.
6 Jan and 7 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sim Balk Lane, Bishopthorpe, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Oct 2024 at 13:43.
6 and 31 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Toft Green, Bishophill, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Oct 2024 at 12:38.
6 and 17 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Market Street, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 11:09.
6 Jan and 24 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coney Street, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 16 Jul 2024 at 12:05.
6 Jan and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coney Street, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Oct 2024 at 09:25.
6 Jan and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coney Street, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Oct 2024 at 10:56.
6 and 31 Jan 2025
City Of York Council are proposing to carry out Highway repair and maintenance works on Low Petergate, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 29 Oct 2024 at 13:38.
6 and 31 Jan 2025
City Of York Council are proposing to carry out Highway repair and maintenance works on Low Petergate, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 10 Dec 2024 at 15:08.
6 and 10 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Stripe Lane, Skelton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 7 Oct 2024 at 07:57.
6 and 10 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Stripe Lane, Skelton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Oct 2024 at 11:54.
6 Jan and 14 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Sep 2024 at 12:10.
6 Jan and 28 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Oct 2024 at 10:23.
6 Jan and 14 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 16 Oct 2024 at 11:57.
6 Jan and 14 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Oct 2024 at 08:16.
6 Jan and 28 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 27 Aug 2024 at 10:19.
6 Jan and 14 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Sep 2024 at 15:30.
6 Jan and 14 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Sep 2024 at 09:39.
6 Jan and 14 Feb 2025
Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Shipton Road, Skelton, York.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 30 Sep 2024 at 10:05.
6 and 26 Jan 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Overton Road, Overton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 5 Dec 2024 at 17:05.
10 and 13 Jan 2025
City Of York Council are proposing to carry out roadworks on Leeman Road, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of York Council on 22 Oct 2024 at 10:17.
13 Jan and 24 Feb 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on The Green, Acomb, York.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 15:09.
13 and 31 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out Disconnection or alteration of supply on Bar Lane, Bishophill, York.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Oct 2024 at 12:48.
13 and 19 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Mill Lane, Heworth, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Oct 2024 at 10:18.
13 and 19 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Mill Lane, Heworth, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Nov 2024 at 08:58.
13 and 19 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Mill Lane, Heworth, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Nov 2024 at 09:57.
13 and 19 Jan 2025
Northern Powergrid (Northeast) are proposing to carry out New service connection on Mill Lane, Heworth, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Nov 2024 at 10:47.
13 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Haxby Road, New Earswick, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 13 Sep 2024 at 11:58.
13 Jan and 2 Feb 2025
National Grid Electricity Transmission are proposing to carry out Utility repair and maintenance works on Overton Road, Overton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Grid Electricity Transmission on 5 Dec 2024 at 17:14.
17 and 20 Jan 2025
City Of York Council are proposing to carry out roadworks on Leeman Road, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by City Of York Council on 29 Oct 2024 at 10:52.
20 Jan and 14 Mar 2025
City Of York Council are proposing to carry out Highway improvement works on Queen Street, Bishophill, York.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 19 Nov 2024 at 10:17.
20 Jan and 21 Feb 2025
City Of York Council are proposing to carry out Highway improvement works on Queen Street, Bishophill, York.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 3 Dec 2024 at 09:12.
20 Jan and 7 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Disconnection or alteration of supply on Bar Lane, Bishophill, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 26 Nov 2024 at 12:12.
20 Jan and 7 Feb 2025
Northern Powergrid (Northeast) are proposing to carry out Disconnection or alteration of supply on Bar Lane, Bishophill, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Dec 2024 at 11:07.
20 and 31 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Street, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 11:10.
24 and 27 Jan 2025
City Of York Council are proposing to carry out roadworks on Leeman Road, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of York Council on 29 Oct 2024 at 10:51.
27 Jan and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Street, Bishopthorpe, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Sep 2024 at 11:52.
2 and 4 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Wigginton Road, Bootham, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 17 Sep 2024 at 11:41.
3 Feb and 31 Oct 2025
City Of York Council are proposing to carry out roadworks on Piccadilly, Guildhall, York.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 31 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of York Council on 9 Sep 2024 at 15:40.
3 and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on St Helens Square, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 11:12.
3 and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lendal, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 4 Oct 2024 at 11:14.
3 and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lendal, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Oct 2024 at 14:17.
3 and 14 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Lendal, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 11:42.
10 Feb and 10 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Street, Bishopthorpe, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Jul 2024 at 12:46.
10 Feb and 3 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Dec 2024 at 14:33.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:21.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:49.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gale Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 08:49.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:22.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:49.
10 and 21 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 11:45.
10 Feb and 10 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Dec 2024 at 14:37.
10 Feb and 10 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Dec 2024 at 13:01.
11 and 13 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bedern, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 13 Nov 2024 at 08:07.
11 and 13 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Bedern, Guildhall, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 14 Nov 2024 at 08:42.
12 and 18 Feb 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Charlton Street, Knavesmire, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 12 Nov 2024 at 08:49.
17 Feb and 10 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 Apr 2024 at 12:04.
17 and 28 Feb 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Westfield, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 15:55.
17 Feb and 9 May 2025
City Of York Council are proposing to carry out Highway improvement works on Queen Street, Bishophill, York.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 25 Oct 2024 at 10:00.
17 Feb and 9 May 2025
City Of York Council were proposing to carry out Highway improvement works on Station Road, Bishophill, York.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 9 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 28 Oct 2024 at 09:49.
17 Feb and 9 May 2025
City Of York Council are proposing to carry out Highway improvement works on Station Road, Bishophill, York.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of York Council on 12 Nov 2024 at 10:53.
17 Feb and 7 Mar 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Water End, Clifton, York.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Harlaxton Energy Networks on 16 Oct 2024 at 09:18.
17 Feb and 24 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton Place, Clifton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 09:06.
17 Feb and 9 Mar 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Woodlands Grove, Monk, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 11:14.
17 Feb and 24 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton, Clifton, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Sep 2024 at 14:24.
24 Feb and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:25.
24 Feb and 7 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 11:44.
24 and 26 Feb 2025
Yorkshire Water were proposing to carry out Remedial works on Hull Road, Dunnington, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 26 Nov 2024 at 08:21.
24 and 26 Feb 2025
Yorkshire Water were proposing to carry out Remedial works on Hull Road, Dunnington, York.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 26 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 26 Nov 2024 at 09:18.
24 and 26 Feb 2025
Yorkshire Water are proposing to carry out Remedial works on Hull Road, Dunnington, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 26 Nov 2024 at 12:17.
24 and 27 Feb 2025
Yorkshire Water are proposing to carry out Remedial works on Hull Road, Dunnington, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 3 Dec 2024 at 13:22.
24 Feb and 21 Mar 2025
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Fifth Avenue, Heworth, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Powergrid (Northeast) on 2 Dec 2024 at 11:48.
24 Feb and 17 Mar 2025
Yorkshire Water are proposing to carry out Utility repair and maintenance works on Malton Road, Heworth, York.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the footway and cycleway.
This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 10:37.
3 and 17 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chantry Lane, Bishopthorpe, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 8 Jul 2024 at 13:54.
3 and 17 Mar 2025
Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Chantry Lane, Bishopthorpe, York.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 17 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 19 Sep 2024 at 14:47.
3 and 21 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Chantry Lane, Bishopthorpe, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Sep 2024 at 12:02.
3 Mar and 11 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bishopthorpe Road, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 10:03.
3 Mar and 11 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bishopthorpe Road, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 30 Sep 2024 at 12:03.
3 Mar and 11 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Bishopthorpe Road, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 9 Oct 2024 at 08:45.
3 and 7 Mar 2025
Yorkshire Water are proposing to carry out Permanent reinstatement on Chapelfields Road, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Yorkshire Water on 6 Dec 2024 at 14:30.
10 Mar and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:19.
10 Mar and 4 Apr 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 28 Nov 2024 at 14:53.
10 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Askham Lane, Westfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 09:32.
10 Mar and 19 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 10:18.
10 Mar and 19 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 3 Dec 2024 at 08:43.
10 Mar and 19 May 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 19 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 09:31.
10 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ridgeway, Acomb, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 10:17.
10 and 25 Mar 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Low Poppleton Lane, Beckfield, York.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Harlaxton Energy Networks on 17 Oct 2024 at 10:48.
10 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton Place, Clifton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 24 Oct 2024 at 09:08.
10 and 28 Mar 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Clifton Place, Clifton, York.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 29 Oct 2024 at 10:25.
Roadworks Map near to Nunnery Lane, YORK, YO23 1JG
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Nunnery Lane, YORK, YO23 1JG (28 Events)
(Scheduled Dates)
(miles)
(Scheduled: 22 Apr 2024 - 22 Oct 2025)
(Scheduled: 11 Dec 2024 - 17 Dec 2024)
(Scheduled: 12 Nov 2024 - 25 Feb 2025)
(Scheduled: 4 Dec 2024 - 17 Dec 2024)
(Scheduled: 13 Apr 2023 - 27 Jan 2025)
(Scheduled: 10 Dec 2024 - 17 Dec 2024)
(Scheduled: 13 Nov 2024 - 31 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.