ROADWORKS SUMMARY
Planks Lane, WOLVERHAMPTON, WV5 8DX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Planks Lane, WV5 8DX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Planks Lane, WOLVERHAMPTON, WV5 8DX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Planks Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Church Hill

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Hill, Brierley Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:34.

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Mill Street, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:35.

LONG TERM
Between
11 Apr 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Level Street

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Level Street, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 April 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Feb 2024 at 08:49.

Severn Trent Water logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Langley Road

Severn Trent Water are carrying out Utility asset works on Langley Road, Lower Penn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 August 2024 at 08:35 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Aug 2024 at 08:54.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
26 Aug 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Bayswater Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bayswater Road, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Jun 2024 at 08:48.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
26 Aug 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Bayswater Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bayswater Road, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Aug 2024 at 16:28.

Severn Trent Water logo
LONG TERM
Until
5 Dec 2024
Details
View Map
Share
Follow
Market Lane

Severn Trent Water are carrying out Utility asset works on Market Lane, Lower Penn.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 September 2024 at 10:30 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Sep 2024 at 11:17.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
7 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Finchley Close

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Finchley Close, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Jun 2024 at 08:49.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
7 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Finchley Close

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Finchley Close, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Aug 2024 at 16:29.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
21 Oct 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Wealdstone Drive

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Wealdstone Drive, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 11 Jun 2024 at 08:50.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
21 Oct 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Wealdstone Drive

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Wealdstone Drive, Lower Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Aug 2024 at 16:30.

Cadent Gas logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Springhill Lane

Cadent Gas are proposing to carry out Utility asset works on Springhill Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 18 Jul 2024 at 10:17.

Cadent Gas logo
LONG TERM
Between
2 Nov and 6 Dec 2024
Details
View Map
Share
Follow
School Road

Cadent Gas are proposing to carry out Utility asset works on School Road, Himley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Aug 2024 at 17:01.

Cadent Gas logo
LONG TERM
Between
4 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Wentworth Road

Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 11:17.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Wentworth Road

Cadent Gas are carrying out Utility asset works on Wentworth Road, Wollaston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 10:05.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
High Street

Cadent Gas are carrying out Utility asset works on High Street, Wollaston.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 25 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 10:27.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Leys Road

Cadent Gas are carrying out Utility asset works on Leys Road, Brockmoor.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:30 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:52.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Paganel Drive

Cadent Gas are proposing to carry out Utility asset works on Paganel Drive, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 11:06.

Indigo Power logo
Finishing
Friday
Details
View Map
Share
Follow
Priory Road

Indigo Power are proposing to carry out Utility asset works on Priory Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Indigo Power on 29 Oct 2024 at 15:52.

Indigo Power logo
Finishing
Friday
Details
View Map
Share
Follow
Gervase Drive

Indigo Power are proposing to carry out Utility asset works on Gervase Drive, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Indigo Power on 13 Nov 2024 at 17:16.

Finishing
Today
Details
View Map
Share
Follow
Maple Road

GTC Pipelines are proposing to carry out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 23 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 14 Nov 2024 at 11:58.

Finishing
Friday
Details
View Map
Share
Follow
Valley Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Valley Road, Upper Gornal.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 8 Aug 2024 at 14:57.

Cadent Gas logo
Between
6 Nov and 3 Dec 2024
Details
View Map
Share
Wentworth Road

Cadent Gas were proposing to carry out Utility asset works on Wentworth Road, Wollaston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2024 and run through until 3 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 11:08.

Cadent Gas logo
Between
6 Nov and 3 Dec 2024
Details
View Map
Share
Follow
Wentworth Road

Cadent Gas are proposing to carry out Utility asset works on Wentworth Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 09:48.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Bridle Road

Cadent Gas were proposing to carry out Utility asset works on Bridle Road, Wollaston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 29 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:56.

Cadent Gas logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Somerset Drive

Cadent Gas are proposing to carry out Utility asset works on Somerset Drive, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 09:51.

Cadent Gas logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Paganel Drive

Cadent Gas are proposing to carry out Utility asset works on Paganel Drive, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:35.

Cadent Gas logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Central Drive

Cadent Gas are carrying out Utility asset works on Central Drive, Coseley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 08:28.

Cadent Gas logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Pemberton Road

Cadent Gas were proposing to carry out Utility asset works on Pemberton Road, Coseley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Aug 2024 at 14:32.

Severn Trent Water logo
LONG TERM
Between
11 Nov and 13 Dec 2024
Details
View Map
Share
Leasowes Drive

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Leasowes Drive, Wolverhampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 25 Oct 2024 at 08:11.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Lennox Gardens

Cadent Gas are proposing to carry out Utility asset works on Lennox Gardens, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jul 2024 at 12:35.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Vicarage Road

Cadent Gas were proposing to carry out Utility asset works on Vicarage Road, Wollaston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 25 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 10:48.

Cadent Gas logo
LONG TERM
Between
12 Nov and 16 Dec 2024
Details
View Map
Share
High Street

Cadent Gas were proposing to carry out Utility asset works on High Street, Wollaston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 November 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 15:22.

Cadent Gas logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
School Road

Cadent Gas are proposing to carry out Utility asset works on School Road, Himley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 16:32.

Cadent Gas logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Chestnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 09:00.

Cadent Gas logo
Until
7 Dec 2024
Details
View Map
Share
Follow
Upper Zoar Street

Cadent Gas are carrying out Utility asset works on Upper Zoar Street, Wolverhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 08:00 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:55.

Cadent Gas logo
Until
7 Dec 2024
Details
View Map
Share
Follow
Zoar Street

Cadent Gas are carrying out Utility asset works on Zoar Street, Wolverhampton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 08:00 and could run through until 7 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 09:55.

Cadent Gas logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Merridale Street West

Cadent Gas are carrying out Utility asset works on Merridale Street West, Wolverhampton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 08:32.

Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Maple Road

GTC Pipelines are proposing to carry out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by GTC Pipelines on 20 Nov 2024 at 08:17.

Indigo Power logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Maple Road

Indigo Power are proposing to carry out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Indigo Power on 20 Nov 2024 at 08:17.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinfold Lane

Cadent Gas are proposing to carry out Utility asset works on Pinfold Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:25.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Pinfold Lane

Cadent Gas are proposing to carry out Utility asset works on Pinfold Lane, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 16:43.

Cadent Gas logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Ashland Street

Cadent Gas are proposing to carry out Utility asset works on Ashland Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:57.

Cadent Gas logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Follow
Ashland Street

Cadent Gas are proposing to carry out Utility asset works on Ashland Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:54.

City Of Wolverhampton Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Staveley Road

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Staveley Road, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 1 Nov 2024 at 11:01.

City Of Wolverhampton Council logo
Between
25 Nov and 2 Dec 2024
Details
View Map
Share
Staveley Road

City Of Wolverhampton Council were proposing to carry out Highway improvement works on Staveley Road, Wolverhampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 12 Nov 2024 at 11:22.

City Of Wolverhampton Council logo
Between
1 and 8 Dec 2024
Details
View Map
Share
Follow
Penn Road

City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Penn Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 5 Nov 2024 at 13:16.

City Of Wolverhampton Council logo
Between
1 and 8 Dec 2024
Details
View Map
Share
Follow
Penn Road

City Of Wolverhampton Council are proposing to carry out Highway repair and maintenance works on Penn Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wolverhampton Council on 12 Nov 2024 at 12:49.

Cadent Gas logo
Between
2 Dec 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Paganel Drive

Cadent Gas are proposing to carry out Utility asset works on Paganel Drive, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 1 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:27.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Bluebell Road

Cadent Gas were proposing to carry out Utility asset works on Bluebell Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:27.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Bluebell Road

Cadent Gas are proposing to carry out Utility asset works on Bluebell Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:31.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Bluebell Road

Cadent Gas are proposing to carry out Utility asset works on Bluebell Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 10:48.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Jenks Road

Staffordshire County Council are proposing to carry out Highway improvement works on Jenks Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 29 Oct 2024 at 08:31.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Elder Grove

Staffordshire County Council are proposing to carry out Highway improvement works on Elder Grove, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 29 Oct 2024 at 09:25.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Brook Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brook Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 29 Oct 2024 at 09:10.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Wood Hill Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Wood Hill Drive, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 15:44.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Central Drive

Cadent Gas are proposing to carry out Utility asset works on Central Drive, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 May 2024 at 12:59.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Showell Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Showell Lane, Orton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Jul 2024 at 09:40.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Lytton Avenue

Cadent Gas are proposing to carry out Utility asset works on Lytton Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 09:21.

Cadent Gas logo
Between
2 and 9 Dec 2024
Details
View Map
Share
Follow
Woodhall Road

Cadent Gas are proposing to carry out Utility asset works on Woodhall Road, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 14:18.

Cadent Gas logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Lime Street

Cadent Gas were proposing to carry out Utility asset works on Lime Street, Wolverhampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 13:28.

Cadent Gas logo
Between
2 and 9 Dec 2024
Details
View Map
Share
Follow
Kimberley Street

Cadent Gas are proposing to carry out Utility asset works on Kimberley Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 10:02.

Severn Trent Water logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Lea Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lea Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2024 at 09:31.

Severn Trent Water logo
Between
4 and 6 Dec 2024
Details
View Map
Share
Follow
Lea Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Lea Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 10 Oct 2024 at 08:17.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Ridgehill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 13:57.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Chestnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:54.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
High Arcal Road

Staffordshire County Council are proposing to carry out Highway improvement works on High Arcal Road, Himley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 13:44.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Planks Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Planks Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 10:55.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Bridge Street

Cadent Gas are proposing to carry out Utility asset works on Bridge Street, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 13:42.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Milton Road

Cadent Gas are proposing to carry out Utility asset works on Milton Road, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Aug 2024 at 12:32.

Cadent Gas logo
LONG TERM
Between
9 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Milton Road

Cadent Gas are proposing to carry out Utility asset works on Milton Road, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Aug 2024 at 13:43.

Cadent Gas logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Lytton Avenue

Cadent Gas are proposing to carry out Utility asset works on Lytton Avenue, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 16:42.

Cadent Gas logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Woodhall Road

Cadent Gas are proposing to carry out Utility asset works on Woodhall Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Sep 2024 at 10:08.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Dirty Foot Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dirty Foot Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 12:18.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
The Greenway

Staffordshire County Council are proposing to carry out Highway improvement works on The Greenway, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:23.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
The Greenway

Staffordshire County Council were proposing to carry out Highway improvement works on The Greenway, Pattingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Sep 2024 at 09:10.

Severn Trent Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Tettenhall Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Tettenhall Road, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2024 at 12:24.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Morfe Hall Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Morfe Hall Lane, Enville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 08:16.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Elder Grove

Staffordshire County Council are proposing to carry out Highway improvement works on Elder Grove, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:39.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Brook Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brook Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:39.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Wood Hill Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Wood Hill Drive, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:39.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Lamb Crescent

Staffordshire County Council are proposing to carry out Highway improvement works on Lamb Crescent, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 12:52.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
The Roughs

Staffordshire County Council are proposing to carry out Highway improvement works on The Roughs, Trescott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 14:36.

Cadent Gas logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Lennox Gardens

Cadent Gas are proposing to carry out Utility asset works on Lennox Gardens, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 15:11.

Cadent Gas logo
Between
19 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Retreat Street

Cadent Gas are proposing to carry out Utility asset works on Retreat Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:52.

Cadent Gas logo
Between
19 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Graiseley Street

Cadent Gas are proposing to carry out Utility asset works on Graiseley Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:52.

Cadent Gas logo
Between
19 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Williamson Street

Cadent Gas are proposing to carry out Utility asset works on Williamson Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:52.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Sytch Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Sytch Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 14:53.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Jenks Road

Staffordshire County Council are proposing to carry out Highway improvement works on Jenks Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 14:40.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 14:53.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Blundies Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Blundies Lane, Enville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 09:48.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Greensforge

Staffordshire County Council were proposing to carry out Highway improvement works on Greensforge, Greensforge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 1 Oct 2024 at 10:49.

Cadent Gas logo
Between
2 and 24 Jan 2025
Details
View Map
Share
Follow
Castle Mill Road

Cadent Gas are proposing to carry out Utility asset works on Castle Mill Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 08:42.

Cadent Gas logo
Between
3 and 10 Jan 2025
Details
View Map
Share
Follow
Owen Road

Cadent Gas are proposing to carry out Utility asset works on Owen Road, Merridale, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:17.

Cadent Gas logo
Between
3 and 10 Jan 2025
Details
View Map
Share
Follow
Owen Road

Cadent Gas are proposing to carry out Utility asset works on Owen Road, Merridale, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 11:07.

Cadent Gas logo
Between
3 and 10 Jan 2025
Details
View Map
Share
Follow
Kimberley Street

Cadent Gas are proposing to carry out Utility asset works on Kimberley Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:14.

Cadent Gas logo
Between
3 and 10 Jan 2025
Details
View Map
Share
Follow
Ashland Street

Cadent Gas are proposing to carry out Utility asset works on Ashland Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 10:09.

Cadent Gas logo
Between
3 and 10 Jan 2025
Details
View Map
Share
Follow
Upper Zoar Street

Cadent Gas are proposing to carry out Utility asset works on Upper Zoar Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:57.

Cadent Gas logo
Between
3 and 10 Jan 2025
Details
View Map
Share
Follow
Zoar Street

Cadent Gas are proposing to carry out Utility asset works on Zoar Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 Oct 2024 at 09:56.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Somerset Drive

Cadent Gas are proposing to carry out Utility asset works on Somerset Drive, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Sep 2024 at 12:48.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tack Farm Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tack Farm Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 17 Sep 2024 at 15:05.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Tack Farm Road

Dudley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Tack Farm Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Dudley Metropolitan Borough Council on 18 Sep 2024 at 11:22.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Narrowboat Way

Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Blackbrook Valley Industrial Estate, Netherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 14:31.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Greensforge

Staffordshire County Council are proposing to carry out Highway improvement works on Greensforge, Greensforge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 09:48.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 12:47.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Lamb Crescent

Staffordshire County Council are proposing to carry out Highway improvement works on Lamb Crescent, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 14:56.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Bridge Street

Cadent Gas are proposing to carry out Utility asset works on Bridge Street, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 16 May 2024 at 11:57.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Milton Road

Cadent Gas are proposing to carry out Utility asset works on Milton Road, Coseley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 May 2024 at 11:36.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
School Road

Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Trysull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 10:02.

Cadent Gas logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Springhill Lane

Cadent Gas are proposing to carry out Utility asset works on Springhill Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 09:24.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Grendon Gardens

Cadent Gas were proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Aug 2024 at 08:55.

Cadent Gas logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Lime Street

Cadent Gas are proposing to carry out Utility asset works on Lime Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:13.

Cadent Gas logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Lime Street

Cadent Gas are proposing to carry out Utility asset works on Lime Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:17.

Cadent Gas logo
LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Lime Street

Cadent Gas are proposing to carry out Utility asset works on Lime Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 15:16.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Manlove Street

Cadent Gas are proposing to carry out Utility asset works on Manlove Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:06.

Cadent Gas logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Cardiff Street

Cadent Gas are proposing to carry out Utility asset works on Cardiff Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:07.

City Of Wolverhampton Council logo
LONG TERM
Between
6 Jan and 4 Jul 2025
Details
View Map
Share
Follow
Darlington Street

City Of Wolverhampton Council are proposing to carry out Highway improvement works on Darlington Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wolverhampton Council on 12 Nov 2024 at 11:11.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Ormes Lane

BT were proposing to carry out Utility asset works on Ormes Lane, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Oct 2024 at 15:20.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Offas Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Offas Drive, Perton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:32.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
The Parkway

Staffordshire County Council are proposing to carry out Highway improvement works on The Parkway, Perton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 12:32.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Lilac Road

Cadent Gas are proposing to carry out Utility asset works on Lilac Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:32.

Cadent Gas logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Lilac Road

Cadent Gas were proposing to carry out Utility asset works on Lilac Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 31 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:31.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Maple Road

Cadent Gas are proposing to carry out Utility asset works on Maple Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:33.

Cadent Gas logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Maple Road

Cadent Gas were proposing to carry out Utility asset works on Maple Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:36.

Cadent Gas logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Chestnut Avenue

Cadent Gas are proposing to carry out Utility asset works on Chestnut Avenue, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:20.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 11:05.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 15:11.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 15:40.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Mill Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Mill Lane, Wombourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 15:53.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Mill Lane

Staffordshire County Council were proposing to carry out Remedial works on Mill Lane, Wombourne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 15:53.

Severn Trent Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
All Saints Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on All Saints Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 11:40.

Cadent Gas logo
Between
13 and 20 Jan 2025
Details
View Map
Share
Follow
Manlove Street

Cadent Gas are proposing to carry out Utility asset works on Manlove Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 08:40.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
The Parkway

Staffordshire County Council are proposing to carry out Highway improvement works on The Parkway, Perton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:35.

Staffordshire County Council logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Offas Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Offas Drive, Perton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 11:40.

Cadent Gas logo
LONG TERM
Between
15 Jan and 28 Apr 2025
Details
View Map
Share
Follow
Mount Road

Cadent Gas are proposing to carry out Utility asset works on Mount Road, Penn, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 28 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Castle Mill Road

Cadent Gas are proposing to carry out Utility asset works on Castle Mill Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:52.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Planks Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Planks Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 15:35.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Dirty Foot Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Dirty Foot Lane, Lower Penn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 10:29.

Cadent Gas logo
Between
20 and 27 Jan 2025
Details
View Map
Share
Follow
Cardiff Street

Cadent Gas are proposing to carry out Utility asset works on Cardiff Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 08:50.

Western Power Distribution (West Midlands) logo
LONG TERM
Between
20 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Mercia Drive

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Mercia Drive, Perton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 14 Nov 2024 at 16:05.

Severn Trent Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Oak Park Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oak Park Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Oct 2024 at 14:35.

Severn Trent Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Oak Park Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Oak Park Road, Wordsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 11:33.

Severn Trent Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Pattingham Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Pattingham Road, Perton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 10:04.

Severn Trent Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Pattingham Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Pattingham Road, Perton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 12:48.

Cadent Gas logo
LONG TERM
Between
22 Jan and 11 Mar 2025
Details
View Map
Share
Leys Road

Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 11 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:47.

Cadent Gas logo
Between
24 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Leys Road

Cadent Gas are proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 20 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 13:52.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Wollaston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Sep 2024 at 11:32.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Wollaston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 13:49.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Wollaston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 12:19.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Ridgehill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ridgehill Road, Gorse Corner.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:07.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Morfe Hall Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Morfe Hall Lane, Enville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 15:49.

Cadent Gas logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Oak Road

Cadent Gas are proposing to carry out Utility asset works on Oak Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 12:48.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
High Arcal Road

Staffordshire County Council are proposing to carry out Highway improvement works on High Arcal Road, Himley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:54.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Priory Road

Cadent Gas were proposing to carry out Utility asset works on Priory Road, Dudley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 11:42.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Priory Road

Cadent Gas are proposing to carry out Utility asset works on Priory Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:22.

Cadent Gas logo
Between
27 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Priory Road

Cadent Gas are proposing to carry out Utility asset works on Priory Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 16:10.

G2 Energy IDNO logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Dean Street

G2 Energy IDNO are proposing to carry out New service connection on Dean Street, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 18 Nov 2024 at 13:05.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
The Roughs

Staffordshire County Council are proposing to carry out Highway improvement works on The Roughs, Trescott.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 11:58.

Severn Trent Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
All Saints Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on All Saints Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 10:02.

Severn Trent Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Vicarage Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Vicarage Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 11:38.

Severn Trent Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Vicarage Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Vicarage Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 16:31.

Cadent Gas logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Bristol Street

Cadent Gas are proposing to carry out Utility asset works on Bristol Street, Merridale, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:08.

Cadent Gas logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Bristol Street

Cadent Gas are proposing to carry out Utility asset works on Bristol Street, Merridale, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 09:34.

Cadent Gas logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Ashland Street

Cadent Gas are proposing to carry out Utility asset works on Ashland Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Oct 2024 at 14:08.

Cadent Gas logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Ashland Street

Cadent Gas are proposing to carry out Utility asset works on Ashland Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 08:09.

BT logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Ormes Lane

BT were proposing to carry out Utility asset works on Ormes Lane, Wolverhampton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 19 Nov 2024 at 09:59.

G2 Energy IDNO logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Dean Street

G2 Energy IDNO are proposing to carry out New service connection on Dean Street, Sedgley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by G2 Energy IDNO on 18 Nov 2024 at 08:59.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Nurton Bank

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Nurton Bank, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 17:30.

Severn Trent Water logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Nurton Bank

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Nurton Bank, Pattingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 29 Oct 2024 at 12:37.

Cadent Gas logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Manor Road

Cadent Gas are proposing to carry out Utility asset works on Manor Road, Penn, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hinstock Close

Cadent Gas are proposing to carry out Utility asset works on Hinstock Close, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:09.

Cadent Gas logo
Between
31 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Ashland Street

Cadent Gas are proposing to carry out Utility asset works on Ashland Street, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 09:40.

Severn Trent Water logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Smout Crescent

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Smout Crescent, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 13:17.

Severn Trent Water logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Pugh Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Pugh Road, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 13:26.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Grendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 08:56.

Cadent Gas logo
Between
3 and 23 Feb 2025
Details
View Map
Share
Follow
Grendon Gardens

Cadent Gas are proposing to carry out Utility asset works on Grendon Gardens, Wolverhampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 08:51.

Cadent Gas logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Fisher Street

Cadent Gas are proposing to carry out Utility asset works on Fisher Street, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 16:13.

Cadent Gas logo
LONG TERM
Between
5 Feb and 30 Jun 2025
Details
View Map
Share
Follow
Narrowboat Way

Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Hurst Business Park, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:56.

Cadent Gas logo
LONG TERM
Between
5 Feb and 30 Jun 2025
Details
View Map
Share
Follow
Narrowboat Way

Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Hurst Business Park, Brierley Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 12:12.

Cadent Gas logo
Between
5 and 25 Feb 2025
Details
View Map
Share
Follow
Narrowboat Way

Cadent Gas are proposing to carry out Utility asset works on Narrowboat Way, Blackbrook Valley Industrial Estate, Netherton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 12:56.

Severn Trent Water logo
Between
5 and 11 Feb 2025
Details
View Map
Share
Follow
Firs Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Firs Road, Kingswinford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 15:22.

Severn Trent Water logo
Between
5 and 12 Feb 2025
Details
View Map
Share
Chapel Lane

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Chapel Lane, Smestow.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 14:59.

Cadent Gas logo
Between
7 Feb and 6 Mar 2025
Details
View Map
Share
Leys Road

Cadent Gas were proposing to carry out Utility asset works on Leys Road, Brockmoor.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 February 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 09:46.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Gerald Road

Cadent Gas are proposing to carry out Utility asset works on Gerald Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:42.

Cadent Gas logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Gerald Road

Cadent Gas are proposing to carry out Utility asset works on Gerald Road, Wollaston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 10:57.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Lawnswood Road

Cadent Gas are proposing to carry out Utility asset works on Lawnswood Road, Wordsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Sep 2024 at 07:31.

Cadent Gas logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Castle Mill Road

Cadent Gas are proposing to carry out Utility asset works on Castle Mill Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:20.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Lamb Crescent

Staffordshire County Council are proposing to carry out Highway improvement works on Lamb Crescent, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 13:32.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Langley Road

Staffordshire County Council were proposing to carry out Highway improvement works on Langley Road, Lower Penn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:22.

Western Power Distribution (West Midlands) logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Bridgnorth Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Bridgnorth Road, Wolverhampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Nov 2024 at 16:24.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
The Parkway

Staffordshire County Council are proposing to carry out Highway improvement works on The Parkway, Perton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:09.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Cedar Road

Cadent Gas are proposing to carry out Utility asset works on Cedar Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:26.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Cedar Road

Cadent Gas are proposing to carry out Utility asset works on Cedar Road, Dudley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 13:40.

Cadent Gas logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 14:27.

Cadent Gas logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Forest Road

Cadent Gas are proposing to carry out Utility asset works on Forest Road, Dudley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 14:24.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Mill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Lane, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 09:13.

Severn Trent Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Ounsdale Road

Severn Trent Water are proposing to carry out Utility asset works on Ounsdale Road, Wombourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 12:01.

Severn Trent Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Ounsdale Road

Severn Trent Water are proposing to carry out Utility asset works on Ounsdale Road, Wombourne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 08:51.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
School Road

Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Oct 2024 at 09:56.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
School Road

Staffordshire County Council are proposing to carry out Highway improvement works on School Road, Wombourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 11:13.

Cadent Gas logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Birmingham New Road

Cadent Gas are proposing to carry out Utility asset works on Birmingham New Road, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 13:00.

Cadent Gas logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Hilston Avenue

Cadent Gas are proposing to carry out Utility asset works on Hilston Avenue, Wolverhampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 10:30.

Cadent Gas logo
Between
20 Feb and 10 Mar 2025
Details
View Map
Share
Follow
High Street

Cadent Gas are proposing to carry out Utility asset works on High Street, Brockmoor.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:07.


Roadworks Map near to Planks Lane, WOLVERHAMPTON, WV5 8DX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 14:47
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Planks Lane, WOLVERHAMPTON, WV5 8DX (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Staffordshire County Council logo
MAJOR
  
CLEE VIEW ROAD 
(0.5 miles)
Staffordshire County Council
Highway improvement works - Carriageway - Some carriageway incursion
In Progress
Since: 11 Nov 2024 08:25
(Scheduled: 11 Nov 2024 - 29 Nov 2024)
0.5
Details
Share
Follow
2
Severn Trent Water logo
URGENT
  
STATION ROAD 
(0.5 miles)
Severn Trent Water
Utility repair and maintenance works - Footway - Give and take
Complete
23 Nov 2024 10:38 - 13:12
0.5
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.