ROADWORKS SUMMARY
Patch Wood Gardens, WAKEFIELD, WF2 6TT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Patch Wood Gardens, WF2 6TT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Patch Wood Gardens, WAKEFIELD, WF2 6TT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Patch Wood Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
12 Aug 2025
Details
View Map
Share
Follow
Old Mill Lane

South Yorkshire Passenger Transport Executive are carrying out Works for road purposes on Old Mill Lane, Barnsley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 April 2024 at 00:01 and could run through until 12 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South Yorkshire Passenger Transport Executive on 8 Apr 2024 at 06:57.

Barnsley Metropolitan Borough Council logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Barugh Green Road

Barnsley Metropolitan Borough Council are carrying out Highway repair and maintenance works on Barugh Green Road, Barugh Green, Barnsley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 August 2024 at 08:00 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 13 Dec 2024 at 10:14.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Between
2 Sep 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Santingley Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Santingley Lane, Crofton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 30 Aug 2024 at 14:55.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
2 Jan 2025
Details
View Map
Share
Follow
Santingley Lane

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Santingley Lane, Crofton, Wakefield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 09:00 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 16 Sep 2024 at 13:18.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Parkhill Grove

Yorkshire Water are proposing to carry out Utility asset works on Parkhill Grove, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2024 at 10:11.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Park Lodge Lane

Yorkshire Water are proposing to carry out Utility asset works on Park Lodge Lane, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2024 at 09:22.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Park Lodge Lane

Yorkshire Water are proposing to carry out Utility asset works on Park Lodge Lane, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2024 at 10:11.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Windhill Road

Yorkshire Water are proposing to carry out Utility asset works on Windhill Road, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 21 Aug 2024 at 09:24.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Windhill Road

Yorkshire Water are proposing to carry out Utility asset works on Windhill Road, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2024 at 10:12.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Parkhill Grove

Yorkshire Water were proposing to carry out Utility asset works on Parkhill Grove, Wakefield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Sep 2024 at 08:36.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Parkhill Crescent

Yorkshire Water are proposing to carry out Utility asset works on Parkhill Crescent, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 12 Aug 2024 at 10:11.

Yorkshire Water logo
LONG TERM
Between
2 Sep 2024 and 28 Mar 2025
Details
View Map
Share
Parkhill Crescent

Yorkshire Water were proposing to carry out Utility asset works on Parkhill Crescent, Wakefield.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Sep 2024 at 16:21.

Yorkshire Water logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Windhill Road

Yorkshire Water are carrying out Utility asset works on Windhill Road, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:30 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Nov 2024 at 08:40.

Yorkshire Water logo
LONG TERM
Between
7 Oct and 22 Dec 2024
Details
View Map
Share
Follow
New Road

Yorkshire Water are proposing to carry out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 8 Jul 2024 at 12:36.

Barnsley Metropolitan Borough Council logo
LONG TERM
Between
28 Oct 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Higham Common Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Higham Common Road, Higham, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 25 Sep 2024 at 14:21.

Barnsley Metropolitan Borough Council logo
LONG TERM
Between
28 Oct 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Higham Common Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Higham Common Road, Higham, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 25 Sep 2024 at 14:20.

Northern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Buckingham Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Way, Royston, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Sep 2024 at 14:16.

Northern Gas Networks logo
LONG TERM
Between
25 Nov 2024 and 14 Feb 2025
Details
View Map
Share
Follow
Buckingham Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckingham Way, Royston, Barnsley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 09:22.

Northern Gas Networks logo
LONG TERM
Between
29 Nov 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Hollin Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollin Lane, Crigglestone, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 09:51.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
High Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on High Street, Crigglestone, Wakefield.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 November 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 12:10.

Northern Gas Networks logo
LONG TERM
Between
29 Nov 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Hollin Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollin Lane, Crigglestone, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 12:51.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Cliff Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cliff Road, Crigglestone, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 12:44.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Cliff Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cliff Road, Crigglestone, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 09:52.

City Of Wakefield Metropolitan District Council logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Waterton Road

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Waterton Road, Wakefield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 2 Dec 2024 at 09:32.

Yorkshire Water logo
LONG TERM
Between
2 Dec 2024 and 28 Mar 2025
Details
View Map
Share
Follow
Parkhill Crescent

Yorkshire Water are proposing to carry out Utility asset works on Parkhill Crescent, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 19 Nov 2024 at 16:12.

Yorkshire Water logo
LONG TERM
Until
2 Apr 2025
Details
View Map
Share
Follow
Parkhill Crescent

Yorkshire Water are carrying out Utility asset works on Parkhill Crescent, Wakefield.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 09:40 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 5 Dec 2024 at 09:49.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Between
6 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Doncaster Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Doncaster Road, Nostell, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 6 Dec 2024 at 14:11.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Doncaster Road

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Doncaster Road, Nostell, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 13:30 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 6 Dec 2024 at 14:39.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Between
6 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Doncaster Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Doncaster Road, Foulby, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 6 Dec 2024 at 14:05.

City Of Wakefield Metropolitan District Council logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Doncaster Road

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Doncaster Road, Foulby, Wakefield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 13:30 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 6 Dec 2024 at 14:39.

City Of Wakefield Metropolitan District Council logo
Finishing
Today
Details
View Map
Share
Follow
Old Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Old Road, Middlestown, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 10 Dec 2024 at 10:11.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Dearne Hall Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Dearne Hall Road, Low Barugh, Barnsley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 10:23 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 12:05.

Yorkshire Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Raven Royd

Yorkshire Water are carrying out Utility repair and maintenance works on Raven Royd, Athersley North, Barnsley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 09:02 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Dec 2024 at 11:36.

City Of Wakefield Metropolitan District Council logo
Finishing
Today
Details
View Map
Share
Follow
Kirkthorpe Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Kirkthorpe Lane, Kirkthorpe, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 9 Dec 2024 at 15:08.

Northern Powergrid (Yorkshire) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Greenfoot Lane

Northern Powergrid (Yorkshire) are carrying out Utility repair and maintenance works on Greenfoot Lane, Old Town, Barnsley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 09:58 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Dec 2024 at 13:14.

Northern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Wrenthorpe Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Wrenthorpe Road, Wakefield.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 16:36 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 08:35.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Burton Road

Cadent Gas are carrying out Utility repair and maintenance works on Burton Road, Monk Bretton, Barnsley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 08:30 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:53.

Yorkshire Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Hill Top

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Hill Top, Newmillerdam, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 21 Nov 2024 at 10:07.

Yorkshire Water logo
LONG TERM
Between
6 Jan and 6 Apr 2025
Details
View Map
Share
Follow
New Road

Yorkshire Water are proposing to carry out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 08:14.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Newstead Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newstead Lane, Fitzwilliam, Pontefract.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 2 Dec 2024 at 14:39.

Yorkshire Water logo
LONG TERM
Between
6 Jan and 6 Apr 2025
Details
View Map
Share
Follow
New Road

Yorkshire Water are proposing to carry out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Jul 2024 at 12:40.

Barnsley Metropolitan Borough Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Burton Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Burton Road, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 10 Dec 2024 at 10:04.

Barnsley Metropolitan Borough Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Burton Road

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Burton Road, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 9 Dec 2024 at 11:15.

Barnsley Metropolitan Borough Council logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Burton Road

Barnsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Burton Road, Monk Bretton, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 23 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 9 Dec 2024 at 11:09.

Barnsley Metropolitan Borough Council logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Burton Road

Barnsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Burton Road, Monk Bretton, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 5 Dec 2024 at 14:40.

Barnsley Metropolitan Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Burton Avenue

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Burton Avenue, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 12 Dec 2024 at 10:35.

Yorkshire Water logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Brook Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Brook Street, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 7 Nov 2024 at 15:12.

Yorkshire Water logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Brook Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Brook Street, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 13 Nov 2024 at 12:09.

Yorkshire Water logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Brook Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Brook Street, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 12 Dec 2024 at 15:41.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Hollin Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollin Lane, Crigglestone, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 15:45.

Yorkshire Water logo
Between
6 and 13 Jan 2025
Details
View Map
Share
Follow
Brook Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Brook Street, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 20 Nov 2024 at 10:01.

Barnsley Metropolitan Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Burton Avenue

Barnsley Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Burton Avenue, Monk Bretton, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 26 Nov 2024 at 10:43.

Northern Gas Networks logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Cliff Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Cliff Road, Crigglestone, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 15:43.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Newstead Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newstead Lane, Fitzwilliam, Pontefract.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 3 Dec 2024 at 10:33.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Newstead Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newstead Lane, Fitzwilliam, Pontefract.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 11:55.

Barnsley Metropolitan Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Bentham Drive

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Bentham Drive, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 12 Dec 2024 at 10:37.

Northern Powergrid (Yorkshire) logo
Between
7 and 13 Jan 2025
Details
View Map
Share
Follow
Eskdale Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Eskdale Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 09:30.

Yorkshire Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Nell Gap Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Nell Gap Lane, Middlestown, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Dec 2024 at 12:55.

Quickline Commucations logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Bank End Lane

Quickline Commucations are proposing to carry out Utility asset works on Bank End Lane, High Hoyland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Dec 2024 at 08:32.

Quickline Commucations logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Bank End Lane

Quickline Commucations are proposing to carry out Utility asset works on Bank End Lane, High Hoyland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 10 Dec 2024 at 13:36.

Quickline Commucations logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Bank End Lane

Quickline Commucations were proposing to carry out Utility asset works on Bank End Lane, High Hoyland, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 13 Nov 2024 at 14:36.

Quickline Commucations logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Upperfield Lane

Quickline Commucations are proposing to carry out Utility asset works on Upperfield Lane, High Hoyland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Dec 2024 at 08:31.

Quickline Commucations logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Upperfield Lane

Quickline Commucations are proposing to carry out Utility asset works on Upperfield Lane, High Hoyland, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 10 Dec 2024 at 13:52.

Quickline Commucations logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Upperfield Lane

Quickline Commucations were proposing to carry out Utility asset works on Upperfield Lane, High Hoyland, Barnsley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 13 Nov 2024 at 15:12.

Barnsley Metropolitan Borough Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Pinehall Drive

Barnsley Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pinehall Drive, Monk Bretton, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Barnsley Metropolitan Borough Council on 12 Dec 2024 at 13:31.

Network Rail logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Common Lane

Network Rail are proposing to carry out Works for Rail Purposes on Common Lane, Walton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Sep 2024 at 15:37.

Network Rail logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Common Lane

Network Rail are proposing to carry out Works for Rail Purposes on Common Lane, Walton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Dec 2024 at 10:32.

Northern Powergrid (Yorkshire) logo
Between
15 and 23 Jan 2025
Details
View Map
Share
Follow
Applehaigh View

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Applehaigh View, Royston, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 23 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 21 Nov 2024 at 08:41.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Howard Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Howard Crescent, Durkar, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Oct 2024 at 12:52.

Northern Gas Networks logo
LONG TERM
Between
20 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Howard Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Howard Crescent, Durkar, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 09:51.

City Of Wakefield Metropolitan District Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Peacock Avenue

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Peacock Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 20 Nov 2024 at 10:28.

City Of Wakefield Metropolitan District Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Peacock Avenue

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Peacock Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 22 Nov 2024 at 12:17.

City Of Wakefield Metropolitan District Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Peacock Avenue

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Peacock Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 22 Nov 2024 at 15:59.

Northern Powergrid (Yorkshire) logo
Between
22 and 28 Jan 2025
Details
View Map
Share
Follow
Barden Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Barden Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 28 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Dec 2024 at 15:48.

Quickline Commucations logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Wintersett Lane

Quickline Commucations are proposing to carry out Utility asset works on Wintersett Lane, Wintersett, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 29 Nov 2024 at 11:36.

Quickline Commucations logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Wintersett Lane

Quickline Commucations are proposing to carry out Utility asset works on Wintersett Lane, Wintersett, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 29 Nov 2024 at 14:01.

Quickline Commucations logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Santingley Lane

Quickline Commucations are proposing to carry out Utility asset works on Santingley Lane, Crofton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 29 Nov 2024 at 14:01.

Quickline Commucations logo
Between
23 and 25 Jan 2025
Details
View Map
Share
Follow
Santingley Lane

Quickline Commucations are proposing to carry out Utility asset works on Santingley Lane, Crofton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 29 Nov 2024 at 10:47.

City Of Wakefield Metropolitan District Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
School Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on School Lane, Walton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 28 Nov 2024 at 16:32.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Blakey Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Blakey Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 10:27.

Quickline Commucations logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Lee Lane

Quickline Commucations are proposing to carry out Utility asset works on Lee Lane, Royston, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 13 Dec 2024 at 10:41.

Northern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Manor Occupation Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Manor Occupation Road, Royston, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 13:27.

City Of Wakefield Metropolitan District Council logo
Between
4 and 24 Feb 2025
Details
View Map
Share
Follow
Waterton Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Waterton Road, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 12 Nov 2024 at 12:59.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Howard Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Howard Crescent, Durkar, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 15:44.

Yorkshire Water logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Green Lane

Yorkshire Water are proposing to carry out roadworks on Green Lane, Overton, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 08:08.

Yorkshire Water logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Cross Road

Yorkshire Water are proposing to carry out Utility asset works on Cross Road, Middlestown, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 09:21.

Yorkshire Water logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Cross Road

Yorkshire Water are proposing to carry out Utility asset works on Cross Road, Middlestown, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 15:40.

Northern Powergrid (Yorkshire) logo
Between
11 and 24 Feb 2025
Details
View Map
Share
Follow
Beech Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Beech Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 09:43.

Network Rail logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Haw Park Lane

Network Rail are proposing to carry out Works for Rail Purposes on Haw Park Lane, Walton, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Oct 2024 at 10:47.

Northern Gas Networks logo
Between
17 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Oakwood Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Oakwood Road, Royston, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Aug 2024 at 13:28.

Northern Powergrid (Yorkshire) logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Silcoates Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Silcoates Street, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Dec 2024 at 14:14.

Network Rail logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Summer Lane

Network Rail are proposing to carry out Works for Rail Purposes on Summer Lane, Barnsley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Nov 2024 at 12:05.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 2 May 2025
Details
View Map
Share
Follow
Newtown Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newtown Avenue, Royston, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 08:40.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 2 May 2025
Details
View Map
Share
Follow
Newtown Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newtown Avenue, Royston, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 16 Aug 2024 at 15:46.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 2 May 2025
Details
View Map
Share
Follow
Newtown Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Newtown Avenue, Royston, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Sep 2024 at 13:39.

LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Higham Common Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Higham Common Road, Higham, Barnsley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Harlaxton Energy Networks on 11 Nov 2024 at 15:13.

City Of Wakefield Metropolitan District Council logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Dewsbury Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Dewsbury Road, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 16 Oct 2024 at 15:54.

City Of Wakefield Metropolitan District Council logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Cross Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Cross Lane, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 16 Oct 2024 at 15:53.

City Of Wakefield Metropolitan District Council logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Waterton Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Waterton Road, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 16 Oct 2024 at 15:54.


Roadworks Map near to Patch Wood Gardens, WAKEFIELD, WF2 6TT

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Dec 2024 11:41
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Patch Wood Gardens, WAKEFIELD, WF2 6TT (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
MILL FARM DRIVE, NEWMILLERDAM 
(0.9 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Complete
11 Dec 2024 12:05 - 14:00
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.