ROADWORKS SUMMARY
Hyrstlands Road, BATLEY, WF17 7JT

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hyrstlands Road, WF17 7JT and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hyrstlands Road, BATLEY, WF17 7JT

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hyrstlands Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Bog Green Lane

Network Rail are carrying out roadworks on Bog Green Lane, Colne Bridge, Huddersfield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 27 Nov 2024 at 13:39.

LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Dalton Bank Road

Kirklees Council are carrying out Highway repair and maintenance works on Dalton Bank Road, Dalton, Huddersfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 January 2024 at 15:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 20 Aug 2024 at 09:10.

Network Rail logo
LONG TERM
Until
30 Nov 2025
Details
View Map
Share
Follow
Thornhill Road

Network Rail are carrying out roadworks on Thornhill Road, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 08:00 and could run through until 30 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Mar 2024 at 12:12.

Network Rail logo
LONG TERM
Until
30 Jun 2026
Details
View Map
Share
Follow
Calder Road

Network Rail are carrying out roadworks on Calder Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 March 2024 at 07:00 and could run through until 30 June 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Mar 2024 at 08:14.

LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
Royle Fold

Kirklees Council are carrying out Highway repair and maintenance works on Royle Fold, Heckmondwike.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 07:30 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 18 Jun 2024 at 14:29.

LONG TERM
Until
27 Jun 2025
Details
View Map
Share
Follow
George Street

Kirklees Council are carrying out Highway repair and maintenance works on George Street, Heckmondwike.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 07:30 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 18 Jun 2024 at 14:28.

Network Rail logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Ravensthorpe Road

Network Rail are carrying out roadworks on Ravensthorpe Road, Thornhill Lees, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Jun 2024 at 08:05.

Network Rail logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Calder Road

Network Rail are carrying out roadworks on Calder Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 18 Jun 2024 at 08:06.

LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Town Hall Way

Kirklees Council are carrying out Highway improvement works on Town Hall Way, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 July 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Kirklees Council on 15 Jul 2024 at 07:10.

Northern Gas Networks logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Bretton Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Bretton Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2024 at 09:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 26 Sep 2024 at 11:23.

Northern Gas Networks logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Access To 31 Bretton Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Access To 31 Bretton Street, Savile Town, Dewsbury.

These works are categorised as Major.

The works started on 23 September 2024 at 12:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 12:51.

LONG TERM
Between
30 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Bond Street

Kirklees Council are proposing to carry out Highway improvement works on Bond Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 10:02.

LONG TERM
Between
30 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Bond Street

Kirklees Council are proposing to carry out Highway improvement works on Bond Street, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:16.

Yorkshire Water logo
LONG TERM
Between
7 Oct and 22 Dec 2024
Details
View Map
Share
Follow
New Road

Yorkshire Water are proposing to carry out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 22 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 8 Jul 2024 at 12:36.

LONG TERM
Until
21 May 2025
Details
View Map
Share
Follow
Bond Street

Kirklees Council are carrying out Highway improvement works on Bond Street, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:30 and could run through until 21 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 7 Oct 2024 at 12:45.

LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Headfield Road

Kirklees Council were proposing to carry out roadworks on Headfield Road, Savile Town, Dewsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 October 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 9 Sep 2024 at 11:14.

LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Warren Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Warren Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 22 Aug 2024 at 15:45.

LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Sunny Bank Avenue

Kirklees Council are proposing to carry out Highway improvement works on Sunny Bank Avenue, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Kirklees Council on 16 Sep 2024 at 14:10.

Network Rail logo
LONG TERM
Until
3 Jan 2025
Details
View Map
Share
Follow
Thornhill Road

Network Rail are carrying out roadworks on Thornhill Road, Dewsbury.

These works are categorised as Major.

The works started on 4 November 2024 at 09:30 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 4 Nov 2024 at 09:30.

Northern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Providence Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Providence Street, Earlsheaton, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 10:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 27 Nov 2024 at 14:49.

Yorkshire Water logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Springbank Road

Yorkshire Water are proposing to carry out Utility asset works on Springbank Road, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 13:39.

Yorkshire Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Springbank Road

Yorkshire Water are carrying out Utility asset works on Springbank Road, Gildersome, Morley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 10:33.

LONG TERM
Between
12 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Sunny Bank Avenue

Kirklees Council are proposing to carry out Highway improvement works on Sunny Bank Avenue, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 23 Sep 2024 at 08:26.

LONG TERM
Between
18 Nov 2024 and 24 Nov 2025
Details
View Map
Share
Follow
Chidswell Lane

Kirklees Council are proposing to carry out Section 50 on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 11:38.

Yorkshire Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Footpath Fronting 1007-1037 Leeds Road

Yorkshire Water are carrying out Utility repair and maintenance works on Footpath Fronting 1007-1037 Leeds Road, Deighton, Huddersfield.

The works should not impact the carriageway.

The works started on 21 November 2024 at 21:43 and could run through until 14 December 2024. The works will impact the verge only.

This roadwork event was last updated by Yorkshire Water on 29 Nov 2024 at 10:08.

Northern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Selbourne Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Selbourne Road, Savile Town, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Sep 2024 at 08:30.

Between
26 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Sunny Bank Avenue

Kirklees Council are proposing to carry out Highway improvement works on Sunny Bank Avenue, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 27 Sep 2024 at 09:39.

Until
20 Dec 2024
Details
View Map
Share
Follow
Sunny Bank Avenue

Kirklees Council are carrying out Highway improvement works on Sunny Bank Avenue, Mirfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 26 Nov 2024 at 08:03.

City Of Wakefield Metropolitan District Council logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Waterton Road

City Of Wakefield Metropolitan District Council are carrying out Highway repair and maintenance works on Waterton Road, Wakefield.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 2 Dec 2024 at 09:32.

Northern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Forge Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Forge Lane, Thornhill Lees, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2024 at 12:17.

Northern Gas Networks logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Access From Town Street To Town Green

Northern Gas Networks are carrying out Utility repair and maintenance works on Access From Town Street To Town Green, Earlsheaton, Dewsbury.

These works are categorised as Major.

The works started on 2 December 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Dec 2024 at 08:51.

Northern Gas Networks logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Town Street

Northern Gas Networks are carrying out Utility repair and maintenance works on Town Street, Earlsheaton, Dewsbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Dec 2024 at 08:52.

Northern Gas Networks logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Brookroyd Lane

Northern Gas Networks are carrying out Utility repair and maintenance works on Brookroyd Lane, Birstall, Batley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 15:20 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 11:30.

City Of Wakefield Metropolitan District Council logo
Finishing
Today
Details
View Map
Share
Follow
Old Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Old Road, Middlestown, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 10 Dec 2024 at 10:11.

Finishing
Sunday
Details
View Map
Share
Follow
Gardens Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Gardens Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 30 Sep 2024 at 08:52.

Finishing
Sunday
Details
View Map
Share
Follow
Gardens Road

Kirklees Council are carrying out Highway repair and maintenance works on Gardens Road, Ravensthorpe, Dewsbury.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:00 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 9 Dec 2024 at 08:42.

Northern Gas Networks logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Footpath To Rear Of 53-64 Town Green

Northern Gas Networks are carrying out Utility repair and maintenance works on Footpath To Rear Of 53-64 Town Green, Earlsheaton, Dewsbury.

These works are categorised as Major.

The works started on 9 December 2024 at 11:30 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Dec 2024 at 13:27.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Town Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Street, Earlsheaton, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 7 Aug 2024 at 08:53.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Follow
Moor Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Moor Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Oct 2024 at 09:19.

Yorkshire Water logo
Finishing
Today
Details
View Map
Share
Moor Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Moor Lane, Gomersal, Cleckheaton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 9 Dec 2024 at 19:39.

Northern Powergrid (Yorkshire) logo
Finishing
Today
Details
View Map
Share
Follow
Whitehall Grove

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Whitehall Grove, Drighlington, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 13:52.

Northern Powergrid (Yorkshire) logo
Finishing
Monday
Details
View Map
Share
Follow
Whitehall Grove

Northern Powergrid (Yorkshire) are carrying out New service connection on Whitehall Grove, Drighlington, Bradford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 08:00 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Dec 2024 at 08:45.

Northern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 18 Feb 2025
Details
View Map
Share
Follow
Scott Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scott Green, Gildersome, Morley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 28 Aug 2024 at 15:04.

Northern Gas Networks logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Gildersome Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gildersome Lane, Gildersome, Morley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 11:22.

Northern Gas Networks logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Follow
Gildersome Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gildersome Lane, Gildersome, Morley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Sep 2024 at 13:54.

Northern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Wrenthorpe Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Wrenthorpe Road, Wakefield.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 16:36 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Dec 2024 at 08:35.

BT logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Hopton Hall Lane

BT are proposing to carry out Utility asset works on Hopton Hall Lane, Upper Hopton, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 23 Sep 2024 at 08:19.

BT logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Hopton Hall Lane

BT are proposing to carry out Utility asset works on Hopton Hall Lane, Upper Hopton, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 2 Dec 2024 at 07:53.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Link Road

Kirklees Council were proposing to carry out Highway improvement works on Link Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 15 Oct 2024 at 14:33.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Aldams Road

Kirklees Council are proposing to carry out Highway improvement works on Aldams Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:27.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Aldams Road

Kirklees Council were proposing to carry out Highway improvement works on Aldams Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:05.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Wilton Street

Kirklees Council are proposing to carry out Highway improvement works on Wilton Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:28.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Wilton Street

Kirklees Council were proposing to carry out Highway improvement works on Wilton Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:06.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Longcauseway

Kirklees Council were proposing to carry out Highway improvement works on Longcauseway, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 15 Oct 2024 at 14:33.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
South Street

Kirklees Council are proposing to carry out Highway improvement works on South Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:42.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
South Street

Kirklees Council were proposing to carry out Highway improvement works on South Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:10.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Railway Street

Kirklees Council are proposing to carry out Highway improvement works on Railway Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:38.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Railway Street

Kirklees Council were proposing to carry out Highway improvement works on Railway Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Battye Street

Kirklees Council are proposing to carry out Highway improvement works on Battye Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:40.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Battye Street

Kirklees Council were proposing to carry out Highway improvement works on Battye Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Dewsbury Ring Road

Kirklees Council are proposing to carry out Highway improvement works on Dewsbury Ring Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:37.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Dewsbury Ring Road

Kirklees Council were proposing to carry out Highway improvement works on Dewsbury Ring Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:07.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Alfred Street

Kirklees Council are proposing to carry out Highway improvement works on Alfred Street, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:41.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Alfred Street

Kirklees Council were proposing to carry out Highway improvement works on Alfred Street, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:09.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Follow
Ings Road

Kirklees Council are proposing to carry out Highway improvement works on Ings Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 31 May 2026. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 07:42.

LONG TERM
Between
1 Jan 2025 and 31 May 2026
Details
View Map
Share
Ings Road

Kirklees Council were proposing to carry out Highway improvement works on Ings Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 31 May 2026. The works were due to impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:09.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Commercial Road

Kirklees Council are proposing to carry out Highway improvement works on Commercial Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Commercial Road

Kirklees Council were proposing to carry out Highway improvement works on Commercial Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:11.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Victoria Road

Kirklees Council are proposing to carry out Highway improvement works on Victoria Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:22.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Victoria Road

Kirklees Council were proposing to carry out Highway improvement works on Victoria Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:11.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Carlton Road

Kirklees Council are proposing to carry out Highway improvement works on Carlton Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:22.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Carlton Road

Kirklees Council were proposing to carry out Highway improvement works on Carlton Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Road

Kirklees Council are proposing to carry out Highway improvement works on Mill Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 4 Sep 2024 at 08:23.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Road

Kirklees Council were proposing to carry out Highway improvement works on Mill Road, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Town Street

Kirklees Council are proposing to carry out Highway improvement works on Town Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 10 Sep 2024 at 09:42.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Town Street

Kirklees Council were proposing to carry out Highway improvement works on Town Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:13.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Jack Lane

Kirklees Council are proposing to carry out Highway improvement works on Jack Lane, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 10 Sep 2024 at 16:23.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Jack Lane

Kirklees Council were proposing to carry out Highway improvement works on Jack Lane, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:13.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Howard Street

Kirklees Council are proposing to carry out Highway improvement works on Howard Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:14.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Howard Street

Kirklees Council were proposing to carry out Highway improvement works on Howard Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:14.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Rink Street

Kirklees Council are proposing to carry out Highway improvement works on Rink Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:17.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Rink Street

Kirklees Council were proposing to carry out Highway improvement works on Rink Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:15.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mount Street

Kirklees Council are proposing to carry out Highway improvement works on Mount Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:18.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mount Street

Kirklees Council were proposing to carry out Highway improvement works on Mount Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:15.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Leeds Road

Kirklees Council are proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 10:00.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Leeds Road

Kirklees Council were proposing to carry out Highway improvement works on Leeds Road, Shaw Cross, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Grafton Street

Kirklees Council are proposing to carry out Highway improvement works on Grafton Street, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:20.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Grafton Street

Kirklees Council were proposing to carry out Highway improvement works on Grafton Street, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:16.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Alexandra Road

Kirklees Council are proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 10:21.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Alexandra Road

Kirklees Council were proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Lane

Kirklees Council are proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 13 Sep 2024 at 09:27.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Lane

Kirklees Council were proposing to carry out Highway improvement works on Mill Lane, Hanging Heaton, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:18.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Follow
Alexandra Road

Kirklees Council are proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:09.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Alexandra Road

Kirklees Council were proposing to carry out Highway improvement works on Alexandra Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:16.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Challenge Way

Kirklees Council are proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 16 Aug 2024 at 10:35.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Challenge Way

Kirklees Council were proposing to carry out Highway improvement works on Challenge Way, Hanging Heaton, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:20.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Grange Road

Kirklees Council are proposing to carry out Highway improvement works on Grange Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:10.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Grange Road

Kirklees Council were proposing to carry out Highway improvement works on Grange Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Mill Forest Way

Kirklees Council are proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:12.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Mill Forest Way

Kirklees Council were proposing to carry out Highway improvement works on Mill Forest Way, Soothill, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:19.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Follow
Rouse Mill Lane

Kirklees Council are proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2026. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 11 Sep 2024 at 14:04.

LONG TERM
Between
1 Jan 2025 and 30 Jul 2026
Details
View Map
Share
Rouse Mill Lane

Kirklees Council were proposing to carry out Highway improvement works on Rouse Mill Lane, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2026. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:17.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Follow
Bradford Road

Kirklees Council are proposing to carry out Highway improvement works on Bradford Road, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 January 2025 and could run through until 30 July 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 23 Aug 2024 at 13:18.

LONG TERM
Between
1 Jan and 30 Jul 2025
Details
View Map
Share
Bradford Road

Kirklees Council were proposing to carry out Highway improvement works on Bradford Road, Batley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 January 2025 and run through until 30 July 2025. The works were due to impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Kirklees Council on 21 Oct 2024 at 11:10.

Yorkshire Water logo
LONG TERM
Between
6 Jan and 6 Apr 2025
Details
View Map
Share
Follow
New Road

Yorkshire Water are proposing to carry out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Jul 2024 at 12:40.

Yorkshire Water logo
LONG TERM
Between
6 Jan and 6 Apr 2025
Details
View Map
Share
Follow
New Road

Yorkshire Water are proposing to carry out Utility asset works on New Road, Middlestown, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 08:14.

Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Hostingley Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Hostingley Lane, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 23 Oct 2024 at 14:11.

Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Hostingley Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Hostingley Lane, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 11 Nov 2024 at 10:41.

LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Headfield Road

Kirklees Council are proposing to carry out roadworks on Headfield Road, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 16 Sep 2024 at 07:52.

LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Chapel Street

Kirklees Council are proposing to carry out roadworks on Chapel Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 20 Sep 2024 at 07:38.

LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Warren Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Warren Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 19 Sep 2024 at 11:46.

LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
South Street

Kirklees Council are proposing to carry out roadworks on South Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 20 Sep 2024 at 07:39.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
South Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on South Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 10:13.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Orchard Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Orchard Street, Savile Town, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 10:13.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Savile Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Savile Road, Savile Town, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Sep 2024 at 10:11.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Link Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Link Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Sep 2024 at 07:31.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Longcauseway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Longcauseway, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Sep 2024 at 07:32.

Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Sunny Bank Avenue

Kirklees Council are proposing to carry out Highway repair and maintenance works on Sunny Bank Avenue, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Oct 2024 at 13:12.

Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Sunny Bank Avenue

Kirklees Council are proposing to carry out Highway repair and maintenance works on Sunny Bank Avenue, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 29 Oct 2024 at 15:54.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Pump Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Pump Lane, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 14:54.

Northern Gas Networks logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Low Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 14:53.

Northern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Footpath Between 10/12 Groves Hall Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Between 10/12 Groves Hall Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 13:36.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Heckmondwike Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Heckmondwike Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 13 Nov 2024 at 12:55.

Northern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Access To Rear Of 1-7 Woodland Grove

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 1-7 Woodland Grove, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 14:29.

Northern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
School Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on School Street, Norristhorpe, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 22 Oct 2024 at 13:38.

Yorkshire Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Chidswell Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 23 Oct 2024 at 14:23.

Yorkshire Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Chidswell Lane

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 31 Oct 2024 at 10:39.

T-Mobile (UK) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Miry Lane

T-Mobile (UK) are proposing to carry out Utility asset works on Miry Lane, Hightown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 11 Nov 2024 at 10:38.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Moorside

Kirklees Council are proposing to carry out roadworks on Moorside, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 10 Oct 2024 at 11:30.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Moorbottom

Kirklees Council are proposing to carry out Highway repair and maintenance works on Moorbottom, Moorbottom, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 5 Nov 2024 at 11:57.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Moorbottom

Kirklees Council are proposing to carry out Highway repair and maintenance works on Moorbottom, Moorbottom, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 20 Nov 2024 at 08:23.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Westgate

Kirklees Council are proposing to carry out Highway repair and maintenance works on Westgate, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 5 Nov 2024 at 11:55.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Westgate

Kirklees Council are proposing to carry out Highway repair and maintenance works on Westgate, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 20 Nov 2024 at 08:21.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
St Peg Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on St Peg Lane, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Oct 2024 at 13:18.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
St Peg Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on St Peg Lane, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 12 Nov 2024 at 14:04.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Spen Bank

Kirklees Council are proposing to carry out Highway repair and maintenance works on Spen Bank, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Oct 2024 at 13:15.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Spen Bank

Kirklees Council are proposing to carry out Highway repair and maintenance works on Spen Bank, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 12 Nov 2024 at 07:46.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitcliffe Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Whitcliffe Road, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 1 Nov 2024 at 13:10.

Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitcliffe Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Whitcliffe Road, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 19 Nov 2024 at 07:25.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Spen Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Spen Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 14 Oct 2024 at 13:09.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Spen Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Spen Lane, Gomersal, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 5 Nov 2024 at 12:07.

Yorkshire Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Church Avenue

Yorkshire Water are proposing to carry out Utility asset works on Church Avenue, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 15:04.

Yorkshire Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Springbank Crescent

Yorkshire Water are proposing to carry out Utility asset works on Springbank Crescent, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 14:59.

Yorkshire Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Nell Gap Lane

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Nell Gap Lane, Middlestown, Wakefield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 9 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 3 Dec 2024 at 12:55.

Northern Powergrid (Yorkshire) logo
Between
7 and 13 Jan 2025
Details
View Map
Share
Follow
Eskdale Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Eskdale Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 09:30.

Northern Gas Networks logo
Between
10 and 17 Jan 2025
Details
View Map
Share
Follow
Fall Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fall Lane, Scout Hill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 14:00.

Northern Gas Networks logo
Between
10 and 17 Jan 2025
Details
View Map
Share
Follow
Temple Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Temple Road, Westtown, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 14:00.

Northern Gas Networks logo
Between
11 and 17 Jan 2025
Details
View Map
Share
Follow
Fall Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Fall Lane, Scout Hill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 14:52.

Northern Gas Networks logo
Between
11 and 17 Jan 2025
Details
View Map
Share
Follow
Temple Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Temple Road, Westtown, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 14:52.

Yorkshire Water logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Headfield Road

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Headfield Road, Savile Town, Dewsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway and footpath.

This roadwork event was last updated by Yorkshire Water on 24 Oct 2024 at 13:48.

Northern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Footpath To Rear Of 2-12 Lowfield Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath To Rear Of 2-12 Lowfield Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 12:45.

Northern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Access To Rear Of 98-106 Groves Hall Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To Rear Of 98-106 Groves Hall Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 22 Nov 2024 at 12:46.

Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Hill Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Hill Street, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 5 Nov 2024 at 16:21.

Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Hill Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Hill Street, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 09:44.

Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Grange Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Grange Road, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 5 Nov 2024 at 15:37.

Between
13 and 21 Jan 2025
Details
View Map
Share
Follow
Grange Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Grange Road, Cleckheaton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 09:42.

Northern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Windsor Walk

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windsor Walk, Birstall, Batley.

These works are categorised as Major.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 11:13.

Yorkshire Water logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
Dewsbury Road

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Dewsbury Road, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 14:29.

Yorkshire Water logo
LONG TERM
Between
13 Jan and 30 May 2025
Details
View Map
Share
Follow
Wide Lane

Yorkshire Water are proposing to carry out Statutory Infrastructure Works on Wide Lane, Morley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 30 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Yorkshire Water on 15 Nov 2024 at 10:31.

Yorkshire Water logo
Between
14 and 22 Jan 2025
Details
View Map
Share
Follow
Trafalgar Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Trafalgar Street, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 11:09.

Yorkshire Water logo
Between
14 and 19 Jan 2025
Details
View Map
Share
Follow
Trafalgar Street

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Trafalgar Street, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 4 Dec 2024 at 10:43.

Northern Powergrid (Yorkshire) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Nettleton Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Nettleton Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Nov 2024 at 11:41.

Northern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Forge Lane

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Forge Lane, Thornhill Lees, Dewsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:41.

City Of Wakefield Metropolitan District Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Peacock Avenue

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Peacock Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 20 Nov 2024 at 10:28.

City Of Wakefield Metropolitan District Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Peacock Avenue

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Peacock Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 22 Nov 2024 at 12:17.

City Of Wakefield Metropolitan District Council logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Peacock Avenue

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Peacock Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 22 Nov 2024 at 15:59.

Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Church Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Church Road, Roberttown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 2 Dec 2024 at 09:14.

Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Church Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Church Road, Roberttown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 3 Dec 2024 at 15:00.

Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Church Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on Church Road, Roberttown, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 9 Dec 2024 at 10:54.

Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Liversedge Hall Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Liversedge Hall Lane, Norristhorpe, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 11 Nov 2024 at 11:03.

Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Liversedge Hall Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Liversedge Hall Lane, Norristhorpe, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 11:26.

Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Liversedge Hall Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Liversedge Hall Lane, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 11 Nov 2024 at 11:02.

Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Liversedge Hall Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Liversedge Hall Lane, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 18 Nov 2024 at 11:25.

Yorkshire Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
The Nook

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Nook, Tingley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 14 Oct 2024 at 13:07.

Northern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Footpath Fronting 112-154 Allen Croft

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Fronting 112-154 Allen Croft, Birkenshaw, Bradford.

These works are categorised as Major.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 2 Dec 2024 at 10:42.

Northern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Footpath Fronting 112-154 Allen Croft

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Fronting 112-154 Allen Croft, Birkenshaw, Bradford.

These works are categorised as Major.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 9 Dec 2024 at 10:59.

Between
22 and 29 Jan 2025
Details
View Map
Share
Follow
Mayman Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Mayman Lane, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 11 Nov 2024 at 11:54.

Between
22 and 29 Jan 2025
Details
View Map
Share
Follow
Mayman Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Mayman Lane, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 20 Nov 2024 at 08:25.

Yorkshire Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
The Nook

Yorkshire Water are proposing to carry out Utility repair and maintenance works on The Nook, Tingley, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 4 Nov 2024 at 10:26.

Northern Powergrid (Yorkshire) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Jackson's Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Jackson's Lane, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 11 Dec 2024 at 11:28.

Northern Powergrid (Yorkshire) logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Blakey Road

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Blakey Road, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 10:27.

Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Wellington Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Wellington Street, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 Nov 2024 at 14:18.

Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Wellington Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Wellington Street, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 27 Nov 2024 at 07:43.

Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Hick Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Hick Lane, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 13 Nov 2024 at 14:21.

Between
27 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Hick Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Hick Lane, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 27 Nov 2024 at 07:45.

Northern Gas Networks logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Windsor Walk

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windsor Walk, Birstall, Batley.

These works are categorised as Major.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 11:31.

Yorkshire Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Spring Avenue

Yorkshire Water were proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 24 Sep 2024 at 13:07.

Yorkshire Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Spring Avenue

Yorkshire Water were proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 14:01.

Yorkshire Water logo
LONG TERM
Between
27 Jan and 21 Mar 2025
Details
View Map
Share
Follow
Spring Avenue

Yorkshire Water are proposing to carry out Utility asset works on Spring Avenue, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Nov 2024 at 13:55.

Yorkshire Water logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Springbank Road

Yorkshire Water are proposing to carry out Utility asset works on Springbank Road, Gildersome, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 16 Sep 2024 at 14:40.

Yorkshire Water logo
Between
30 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Cheviot Way

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Cheviot Way, Upper Hopton, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 28 Oct 2024 at 14:05.

Northern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Judy Haigh Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Judy Haigh Lane, Thornhill Edge, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:12.

Northern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Judy Haigh Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Judy Haigh Lane, Thornhill Edge, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 10:40.

Northern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Edge Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Edge Road, Thornhill Edge, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 11:01.

Northern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Low Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Low Road, Thornhill Edge, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:14.

Northern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Edge Junction

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Edge Junction, Thornhill Edge, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 23 Oct 2024 at 14:13.

Northern Gas Networks logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Edge Junction

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Edge Junction, Thornhill Edge, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 10:39.

Northern Gas Networks logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Access To 50-76 The Combs

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To 50-76 The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 21 Nov 2024 at 14:10.

Yorkshire Water logo
Between
3 Feb and 2 Mar 2025
Details
View Map
Share
Follow
The Combs

Yorkshire Water are proposing to carry out Utility asset works on The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 11 Nov 2024 at 10:35.

Yorkshire Water logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Nettleton Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Nettleton Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 9 Dec 2024 at 10:47.

Yorkshire Water logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Nettleton Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Nettleton Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 13:11.

Yorkshire Water logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Nettleton Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Nettleton Road, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 13:49.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
South Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on South Street, Savile Town, Dewsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:44.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Park Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Park Road, Savile Town, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:42.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Orchard Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Orchard Street, Savile Town, Dewsbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:42.

Northern Gas Networks logo
LONG TERM
Between
3 Feb and 21 Mar 2025
Details
View Map
Share
Savile Road

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Savile Road, Savile Town, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:42.

Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Throstle Nest

Kirklees Council are proposing to carry out Highway repair and maintenance works on Throstle Nest, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 22 Nov 2024 at 07:47.

Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Throstle Nest

Kirklees Council are proposing to carry out Highway repair and maintenance works on Throstle Nest, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 2 Dec 2024 at 09:54.

Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
West Park Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on West Park Road, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 2 Dec 2024 at 11:14.

Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
West Park Road

Kirklees Council are proposing to carry out Highway repair and maintenance works on West Park Road, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 9 Dec 2024 at 13:54.

Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Deighton Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Deighton Lane, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 2 Dec 2024 at 11:29.

Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Deighton Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Deighton Lane, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 9 Dec 2024 at 13:56.

Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Trafalgar Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Trafalgar Street, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 2 Dec 2024 at 10:24.

Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Trafalgar Street

Kirklees Council are proposing to carry out Highway repair and maintenance works on Trafalgar Street, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 9 Dec 2024 at 13:20.

Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Healey Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Healey Lane, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 2 Dec 2024 at 11:25.

Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Healey Lane

Kirklees Council are proposing to carry out Highway repair and maintenance works on Healey Lane, Healey, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kirklees Council on 9 Dec 2024 at 14:18.

Northern Gas Networks logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Upper Batley Low Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Batley Low Lane, Birstall, Batley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 11:33.

Quickline Commucations logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Clough Lane

Quickline Commucations were proposing to carry out Utility asset works on Clough Lane, Lower Hopton, Mirfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 10 Dec 2024 at 08:20.

City Of Wakefield Metropolitan District Council logo
Between
4 and 24 Feb 2025
Details
View Map
Share
Follow
Waterton Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Waterton Road, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 12 Nov 2024 at 12:59.

Yorkshire Water logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Green Lane

Yorkshire Water are proposing to carry out roadworks on Green Lane, Overton, Wakefield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 08:08.

Yorkshire Water logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Cross Road

Yorkshire Water are proposing to carry out Utility asset works on Cross Road, Middlestown, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 09:21.

Yorkshire Water logo
LONG TERM
Between
10 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Cross Road

Yorkshire Water are proposing to carry out Utility asset works on Cross Road, Middlestown, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 10 Dec 2024 at 15:40.

Yorkshire Water logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Westfield Street

Yorkshire Water were proposing to carry out Utility repair and maintenance works on Westfield Street, Ossett.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 15 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 8 Nov 2024 at 13:43.

Northern Powergrid (Yorkshire) logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Chidswell Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Dec 2024 at 08:02.

Northern Powergrid (Yorkshire) logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Chidswell Lane

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Chidswell Lane, Shaw Cross, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 10 Dec 2024 at 13:14.

Yorkshire Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Staincliffe Road

Yorkshire Water are proposing to carry out Utility repair and maintenance works on Staincliffe Road, Dewsbury Moor, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Yorkshire Water on 29 Nov 2024 at 12:21.

Northern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Old Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Lane, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 13:02.

Northern Gas Networks logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Old Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Old Lane, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 13:41.

Quickline Commucations logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Clough Lane

Quickline Commucations are proposing to carry out Utility asset works on Clough Lane, Lower Hopton, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 10 Dec 2024 at 14:45.

Quickline Commucations logo
Between
11 and 14 Feb 2025
Details
View Map
Share
Follow
Clough Lane

Quickline Commucations are proposing to carry out Utility asset works on Clough Lane, Lower Hopton, Mirfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Dec 2024 at 08:34.

Northern Powergrid (Yorkshire) logo
Between
11 and 24 Feb 2025
Details
View Map
Share
Follow
Beech Avenue

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Beech Avenue, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 20 Nov 2024 at 09:43.

Northern Gas Networks logo
Between
12 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Leeds Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Leeds Road, Birstall, Batley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 4 Dec 2024 at 11:34.

Northern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Access To 50-76 The Combs

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To 50-76 The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 08:01.

Northern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Access To 50-76 The Combs

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Access To 50-76 The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 14:53.

Northern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
The Combs

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 08:03.

Northern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
The Combs

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 14:52.

Yorkshire Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Combs

Yorkshire Water are proposing to carry out Utility asset works on The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 18 Nov 2024 at 14:05.

Yorkshire Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Combs

Yorkshire Water are proposing to carry out Utility asset works on The Combs, Thornhill, Dewsbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Yorkshire Water on 26 Nov 2024 at 08:13.

Northern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Warren Street

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on Warren Street, Savile Town, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:45.

Northern Powergrid (Yorkshire) logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Silcoates Street

Northern Powergrid (Yorkshire) are proposing to carry out New service connection on Silcoates Street, Wakefield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Yorkshire) on 5 Dec 2024 at 14:14.

Northern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Sugar Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Sugar Lane, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Dec 2024 at 16:08.

Northern Gas Networks logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Moor Park Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Moor Park Lane, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Dec 2024 at 16:07.

Northern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
School Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on School Street, Norristhorpe, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 28 Oct 2024 at 14:21.

Northern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
School Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on School Street, Norristhorpe, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 11 Nov 2024 at 10:50.

Northern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
School Street

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on School Street, Norristhorpe, Liversedge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Gas Networks on 18 Nov 2024 at 11:24.

Northern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
New Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on New Lane, Drighlington, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 12:51.

Leeds City Council logo
Between
23 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Acre Close

Leeds City Council are proposing to carry out Highway improvement works on Acre Close, Middleton, Leeds.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 11 Nov 2024 at 16:05.

Northern Gas Networks logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Crackenedge Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Crackenedge Lane, Dewsbury.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Dec 2024 at 13:19.

LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
High Wood Road

Kirklees Council are proposing to carry out Highway improvement works on High Wood Road, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 22 Nov 2024 at 07:48.

LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
High Wood Road

Kirklees Council are proposing to carry out Highway improvement works on High Wood Road, Birstall, Batley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Kirklees Council on 12 Dec 2024 at 11:28.

Northern Gas Networks logo
Between
3 and 21 Mar 2025
Details
View Map
Share
The Sidings

Northern Gas Networks were proposing to carry out Utility repair and maintenance works on The Sidings, Savile Town, Dewsbury.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 14 Nov 2024 at 11:45.

Northern Gas Networks logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Tetley Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tetley Drive, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 13:03.

Northern Gas Networks logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Tetley Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Tetley Drive, Birkenshaw, Bradford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 12 Dec 2024 at 13:43.

Leeds City Council logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Horsfall Street

Leeds City Council are proposing to carry out Highway improvement works on Horsfall Street, Morley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Leeds City Council on 12 Nov 2024 at 12:14.

Northern Gas Networks logo
LONG TERM
Between
3 Mar and 2 May 2025
Details
View Map
Share
Follow
Scott Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Scott Green, Gildersome, Morley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 31 Oct 2024 at 13:18.

Northern Gas Networks logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Gildersome Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Gildersome Lane, Gildersome, Morley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 30 Oct 2024 at 12:23.

City Of Wakefield Metropolitan District Council logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Waterton Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Waterton Road, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 16 Oct 2024 at 15:54.

City Of Wakefield Metropolitan District Council logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Cross Lane

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Cross Lane, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 16 Oct 2024 at 15:53.

City Of Wakefield Metropolitan District Council logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Dewsbury Road

City Of Wakefield Metropolitan District Council are proposing to carry out Highway repair and maintenance works on Dewsbury Road, Wakefield.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Wakefield Metropolitan District Council on 16 Oct 2024 at 15:54.

Northern Gas Networks logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Link Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Link Road, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Dec 2024 at 16:05.

Northern Gas Networks logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Longcauseway

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Longcauseway, Dewsbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Gas Networks on 3 Dec 2024 at 16:04.


Roadworks Map near to Hyrstlands Road, BATLEY, WF17 7JT

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 13 Dec 2024 11:41
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hyrstlands Road, BATLEY, WF17 7JT (15 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Northern Gas Networks logo
MAJOR
  
HOWARD STREET 
(0.1 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 23 Sep 2024 - 18 Oct 2025)
0.1
Details
Share
2
MAXWELL AVENUE 
(0.1 miles)
Kirklees Council
Section 50 - Carriageway - Give and take
Planned
Scheduled: 9 Dec 2024 - 13 Dec 2024
0.1
Details
Share
Follow
3
Yorkshire Water logo
SAVILE STREET 
(0.3 miles)
Yorkshire Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 13 Dec 2024 - 15 Dec 2024
0.3
Details
Share
Follow
4
Yorkshire Water logo
URGENT
  
WARWICK ROAD 
(0.4 miles)
Yorkshire Water
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 12 Dec 2024 - 19 Dec 2024)
0.4
Details
Share
5
Northern Powergrid (Yorkshire) logo
URGENT
  
HERITAGE ROAD 
(0.4 miles)
Northern Powergrid (Yorkshire)
Utility repair and maintenance works - Footway - No carriageway incursion
Complete
10 Dec 2024 13:10 - 11 Dec 2024 14:00
0.4
Details
Share
6
Yorkshire Water logo
MILL LANE, HANGING HEATON 
(0.5 miles)
Yorkshire Water
Utility asset works - Carriageway - Multi-way signals
Planned
Scheduled: 11 Dec 2024 - 13 Dec 2024
0.5
Details
Share
Follow
7
MAJOR
  
BOND STREET 
(0.7 miles)
Kirklees Council
Highway improvement works - Footway, Carriageway - Road closure
Planned
Scheduled: 30 Sep 2024 - 29 Apr 2025
0.7
Details
Share
Follow
8
MAJOR
  
BOND STREET 
(0.7 miles)
Kirklees Council
Highway improvement works - Footway, Carriageway - Road closure
Planned
Scheduled: 30 Sep 2024 - 29 Apr 2025
0.7
Details
Share
Follow
9
MAJOR
  
BOND STREET 
(0.7 miles)
Kirklees Council
Highway improvement works - Footway, Carriageway - Road closure
In Progress
Since: 7 Oct 2024 10:30
(Scheduled: 7 Oct 2024 - 21 May 2025)
0.7
Details
Share
Follow
10
MAJOR
  
WAKEFIELD OLD ROAD 
(0.8 miles)
Kirklees Council
Highway improvement works - Footway, Verge - Two-way signals
In Progress
Since: 15 Jul 2024 08:00
(Scheduled: 15 Jul 2024 - 20 Dec 2024)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.