ROADWORKS SUMMARY
Smithy Brow, WARRINGTON, WA3 7BY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Smithy Brow, WA3 7BY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Smithy Brow, WARRINGTON, WA3 7BY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Smithy Brow are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

LONG TERM
Until
13 Jan 2025
Details
View Map
Share
Follow
Winwick Link Road

St. Helens Council are carrying out Highway improvement works on Winwick Link Road, Winwick, Warrington.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 January 2024 at 09:30 and could run through until 13 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by St. Helens Council on 30 Sep 2024 at 10:55.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
St Helens Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on St Helens Road, Leigh.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 09:00 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Oct 2024 at 09:03.

ManWeb logo
LONG TERM
Between
23 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Penkford Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Penkford Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by ManWeb on 20 Aug 2024 at 16:01.

ManWeb logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Penkford Lane

ManWeb are carrying out Utility repair and maintenance works on Penkford Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 October 2024 at 11:15 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 23 Oct 2024 at 13:23.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Wash Lane

Cadent Gas are proposing to carry out Utility asset works on Wash Lane, Latchford, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 14:13.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Wash Lane

Cadent Gas are proposing to carry out Utility asset works on Wash Lane, Latchford, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 14:14.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Statham Avenue

Cadent Gas are proposing to carry out Utility asset works on Statham Avenue, Lymm, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:24.

Cadent Gas logo
LONG TERM
Between
4 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Thames Road

Cadent Gas are proposing to carry out Utility asset works on Thames Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 13:50.

Cadent Gas logo
LONG TERM
Between
4 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Thames Road

Cadent Gas are proposing to carry out Utility asset works on Thames Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 08:49.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Avon Road

Cadent Gas are proposing to carry out Utility asset works on Avon Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Aug 2024 at 13:54.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Avon Road

Cadent Gas are proposing to carry out Utility asset works on Avon Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 08:42.

ManWeb logo
Finishing
Thursday
Details
View Map
Share
Follow
Watkin Street

ManWeb are carrying out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 16:35 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 12 Nov 2024 at 07:57.

ManWeb logo
Finishing
Friday
Details
View Map
Share
Follow
Cyril Street

ManWeb are proposing to carry out Utility repair and maintenance works on Cyril Street, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 12 Sep 2024 at 15:05.

ManWeb logo
Finishing
Friday
Details
View Map
Share
Follow
Cyril Street

ManWeb are carrying out Utility repair and maintenance works on Cyril Street, Orford, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 16:35 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 12 Nov 2024 at 08:59.

Electricity North West (NorWeb) logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Newton Lane

Electricity North West (NorWeb) are carrying out Diversionary works on Newton Lane, Newton-le-willows.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 16:45 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Nov 2024 at 09:29.

Cadent Gas logo
Between
11 Nov and 11 Dec 2024
Details
View Map
Share
Manor Avenue

Cadent Gas were proposing to carry out Utility asset works on Manor Avenue, Golborne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:05.

Warrington Borough Council logo
LONG TERM
Between
14 Nov and 27 Dec 2024
Details
View Map
Share
Follow
Weaste Lane

Warrington Borough Council are proposing to carry out Utility asset works on Weaste Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 November 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 16 Sep 2024 at 14:24.

BT logo
Finishing
Thursday
Details
View Map
Share
Follow
Watkin Street

BT are carrying out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 07:30 and could run through until 5 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Nov 2024 at 07:39.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Watkin Street

BT are proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Oct 2024 at 09:33.

Warrington Borough Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Winwick Link Road

Warrington Borough Council are proposing to carry out Highway improvement works on Winwick Link Road, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 23 May 2024 at 13:16.

Warrington Borough Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Winwick Link Road

Warrington Borough Council are proposing to carry out Highway improvement works on Winwick Link Road, Winwick, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 15 Oct 2024 at 11:15.

Cadent Gas logo
Between
18 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Avon Road

Cadent Gas are proposing to carry out Utility asset works on Avon Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 09:43.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 14:49.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Walton Road

Cadent Gas are proposing to carry out Utility asset works on Walton Road, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Aug 2024 at 08:52.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Collin Street

Cadent Gas are carrying out Utility repair and maintenance works on Collin Street, Bewsey And Whitecross, Warrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 09:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:45.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
Piele Road

Cadent Gas are carrying out Utility repair and maintenance works on Piele Road, Haydock, St Helens.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 10:11 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 09:48.

Cadent Gas logo
Finishing
Wednesday
Details
View Map
Share
Follow
East Lancashire Road

Cadent Gas are carrying out Utility repair and maintenance works on East Lancashire Road, Haydock, St Helens.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 11:45 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 09:49.

ManWeb logo
Between
22 Nov and 19 Dec 2024
Details
View Map
Share
Follow
Landseer Avenue

ManWeb are proposing to carry out Utility repair and maintenance works on Landseer Avenue, Latchford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 3 Sep 2024 at 14:48.

Warrington Borough Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Weaste Lane

Warrington Borough Council are proposing to carry out Utility asset works on Weaste Lane, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 09:01.

Energy Assets Pipelines logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Thelwall Lane

Energy Assets Pipelines were proposing to carry out Utility asset works on Thelwall Lane, Warrington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Energy Assets Pipelines on 16 Sep 2024 at 12:15.

Energy Assets Pipelines logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Thelwall Lane

Energy Assets Pipelines are carrying out Utility asset works on Thelwall Lane, Warrington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:19 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Energy Assets Pipelines on 25 Nov 2024 at 09:19.

Cadent Gas logo
Between
25 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Whitbarrow Road

Cadent Gas are proposing to carry out Utility asset works on Whitbarrow Road, Lymm, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Aug 2024 at 10:52.

Network Rail logo
Between
25 Nov and 11 Dec 2024
Details
View Map
Share
Follow
Lythgoes Lane

Network Rail are proposing to carry out Works for Rail Purposes on Lythgoes Lane, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 10 Sep 2024 at 13:44.

Network Rail logo
Until
11 Dec 2024
Details
View Map
Share
Follow
Lythgoes Lane

Network Rail are carrying out Works for Rail Purposes on Lythgoes Lane, Warrington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 23:00 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 26 Nov 2024 at 07:15.

BT logo
Until
13 Dec 2024
Details
View Map
Share
Follow
Watkin Street

BT are carrying out Works for road purposes on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 25 Nov 2024 at 08:42.

Finishing
Today
Details
View Map
Share
Follow
Winwick Link Road

St. Helens Council are carrying out Highway improvement works on Winwick Link Road, Winwick, Warrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 21:00 and could run through until 30 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by St. Helens Council on 26 Nov 2024 at 11:02.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
London Road

Cadent Gas are carrying out Utility repair and maintenance works on London Road, Warrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 11:11 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 12:12.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Orchard Street

Cadent Gas are carrying out Utility repair and maintenance works on Orchard Street, Stockton Heath, Warrington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 11:11 and could run through until 3 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 14:47.

ManWeb logo
Between
27 Nov and 10 Dec 2024
Details
View Map
Share
Landseer Avenue

ManWeb were proposing to carry out Utility repair and maintenance works on Landseer Avenue, Latchford, Warrington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 10 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 20 Sep 2024 at 13:24.

Electricity North West (NorWeb) logo
Between
27 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Rob Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rob Lane, Newton Le Willows, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Nov 2024 at 15:03.

Electricity North West (NorWeb) logo
Between
27 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Rob Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rob Lane, Newton Le Willows, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Nov 2024 at 10:03.

Electricity North West (NorWeb) logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Rob Lane

Electricity North West (NorWeb) are carrying out Diversionary works on Rob Lane, Newton Le Willows, St Helens.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 16:45 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Nov 2024 at 09:13.

Warrington Borough Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Glaziers Lane

Warrington Borough Council are carrying out Highway repair and maintenance works on Glaziers Lane, Croft, Warrington.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 09:30 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 28 Nov 2024 at 09:00.

United Utilities Water (formerly North West Water) logo
Finishing
Thursday
Details
View Map
Share
Follow
Mercer Street Passageway Rear Of 1 To 93

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Mercer Street Passageway Rear Of 1 To 93, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 November 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Sep 2024 at 09:10.

ManWeb logo
Between
1 and 17 Dec 2024
Details
View Map
Share
Follow
Collins Green Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Collins Green Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 25 Sep 2024 at 09:13.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Academy Street

Cadent Gas are proposing to carry out Utility asset works on Academy Street, Bewsey And Whitecross, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Sep 2024 at 08:49.

BT logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Watkin Street

BT are proposing to carry out Works for road purposes on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Oct 2024 at 09:39.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Watkin Street

ManWeb were proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 6 Nov 2024 at 11:03.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:54.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Oct 2024 at 10:23.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:55.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 6 Nov 2024 at 11:06.

Cadent Gas logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Berkshire Drive

Cadent Gas are proposing to carry out Utility asset works on Berkshire Drive, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 12:26.

United Utilities Water (formerly North West Water) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Barnfield Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Barnfield Road, Woolston, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Aug 2024 at 15:47.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:53.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 16:08.

ManWeb logo
LONG TERM
Between
2 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 7 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Oct 2024 at 09:31.

ManWeb logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Pennington Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Pennington Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 26 Sep 2024 at 09:10.

Cadent Gas logo
Between
2 and 18 Dec 2024
Details
View Map
Share
Follow
Shaw Street

Cadent Gas are proposing to carry out Utility asset works on Shaw Street, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 10:46.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 4 Oct 2024 at 10:57.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Winwick Road

ManWeb are proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Oct 2024 at 15:09.

ManWeb logo
LONG TERM
Between
3 Dec 2024 and 8 Jan 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 8 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 11 Oct 2024 at 09:35.

Electricity North West (NorWeb) logo
LONG TERM
Between
4 Dec 2024 and 3 Mar 2025
Details
View Map
Share
Ashton Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Ashton Road, Newton Le Willows, St Helens.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 3 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 16 Oct 2024 at 13:43.

Electricity North West (NorWeb) logo
LONG TERM
Between
4 Dec 2024 and 3 Mar 2025
Details
View Map
Share
Ashton Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Ashton Road, Newton Le Willows, St Helens.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 3 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 12 Nov 2024 at 15:50.

Cadent Gas logo
Between
9 and 27 Dec 2024
Details
View Map
Share
Follow
Wash Lane

Cadent Gas are proposing to carry out Utility asset works on Wash Lane, Latchford, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 11:36.

ManWeb logo
Between
9 and 31 Dec 2024
Details
View Map
Share
Follow
Pennington Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Pennington Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 21 Aug 2024 at 14:06.

ManWeb logo
Between
9 and 31 Dec 2024
Details
View Map
Share
Follow
Pennington Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Pennington Lane, Burtonwood And Westbrook, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 25 Sep 2024 at 12:14.

Cadent Gas logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Briar Walk

Cadent Gas were proposing to carry out Utility asset works on Briar Walk, Golborne.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 13:06.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Yates Close

BT were proposing to carry out Utility asset works on Yates Close, Great Sankey, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 26 Sep 2024 at 10:16.

Cadent Gas logo
Between
16 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Rectory Avenue

Cadent Gas are proposing to carry out Utility asset works on Rectory Avenue, Lowton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 10:56.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Battersby Street

Cadent Gas are proposing to carry out Utility asset works on Battersby Street, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 20 Sep 2024 at 11:00.

Cadent Gas logo
Between
16 and 27 Dec 2024
Details
View Map
Share
Follow
Battersby Street

Cadent Gas are proposing to carry out Utility asset works on Battersby Street, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 27 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 14:59.

United Utilities Water (formerly North West Water) logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Glebe Street Back Service Road East 82 - 144

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Street Back Service Road East 82 - 144, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Nov 2024 at 12:10.

Cadent Gas logo
LONG TERM
Between
19 Dec 2024 and 10 Feb 2025
Details
View Map
Share
Follow
St Helens Road

Cadent Gas are proposing to carry out Utility asset works on St Helens Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Sep 2024 at 12:57.

ManWeb logo
LONG TERM
Between
2 Jan and 1 Dec 2025
Details
View Map
Share
Winwick Road

ManWeb were proposing to carry out Utility repair and maintenance works on Winwick Road, Warrington.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 1 December 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 19 Sep 2024 at 14:17.

Cadent Gas logo
Between
2 and 20 Jan 2025
Details
View Map
Share
Follow
Shaw Street

Cadent Gas are proposing to carry out Utility asset works on Shaw Street, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 15:27.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Yates Close

BT are proposing to carry out Utility asset works on Yates Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Oct 2024 at 12:26.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Yates Close

BT are proposing to carry out Utility asset works on Yates Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 30 Oct 2024 at 14:53.

Cadent Gas logo
LONG TERM
Between
6 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Pasture Lane Segregated Footpath

Cadent Gas are proposing to carry out Utility asset works on Pasture Lane Segregated Footpath, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:20.

Cadent Gas logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Fearnhead Lane

Cadent Gas are proposing to carry out Utility asset works on Fearnhead Lane, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 16:13.

Cadent Gas logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Braithwaite Road

Cadent Gas were proposing to carry out Utility asset works on Braithwaite Road, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 22 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:00.

Cadent Gas logo
LONG TERM
Between
6 Jan and 12 Feb 2025
Details
View Map
Share
Slag Lane

Cadent Gas were proposing to carry out Utility asset works on Slag Lane, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 12 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:01.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Glebe Street Back Service Road East 82 - 144

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Street Back Service Road East 82 - 144, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 1 Oct 2024 at 10:15.

Electricity North West (NorWeb) logo
LONG TERM
Between
8 Jan and 11 Feb 2025
Details
View Map
Share
Follow
Birchwood Park Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Birchwood Park Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 11 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:28.

The Environment Agency logo
LONG TERM
Between
8 Jan and 25 Apr 2025
Details
View Map
Share
Follow
Alexandra Road

The Environment Agency are proposing to carry out Statutory Infrastructure Works on Alexandra Road, Ashton-in-makerfield.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by The Environment Agency on 20 Jun 2024 at 08:50.

Electricity North West (NorWeb) logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:28.

Electricity North West (NorWeb) logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:28.

Electricity North West (NorWeb) logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Warrington Road

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Warrington Road, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:29.

United Utilities Water (formerly North West Water) logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
Borron Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Borron Road, Newton Le Willows, St Helens.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Nov 2024 at 10:39.

Cadent Gas logo
Between
13 and 29 Jan 2025
Details
View Map
Share
The Grove

Cadent Gas were proposing to carry out Utility asset works on The Grove, Lowton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 29 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 11:02.

Warrington Borough Council logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Marina Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Marina Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Nov 2024 at 13:45.

United Utilities Water (formerly North West Water) logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Twiss Green Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Twiss Green Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 14:27.

Warrington Borough Council logo
Between
23 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Reaper Close

Warrington Borough Council are proposing to carry out Highway improvement works on Reaper Close, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 25 Nov 2024 at 11:09.

United Utilities Water (formerly North West Water) logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Waring Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Waring Avenue, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Oct 2024 at 15:30.

United Utilities Water (formerly North West Water) logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Waring Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Waring Avenue, Latchford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Oct 2024 at 11:50.

Cadent Gas logo
LONG TERM
Between
27 Jan and 19 Mar 2025
Details
View Map
Share
Follow
Berkshire Drive

Cadent Gas are proposing to carry out Utility asset works on Berkshire Drive, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 12:17.

Warrington Borough Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hughes Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Hughes Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 19 Nov 2024 at 10:28.

Warrington Borough Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Woolston Grange Avenue

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Woolston Grange Avenue, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 16 Oct 2024 at 09:05.

Warrington Borough Council logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Woolston Grange Avenue

Warrington Borough Council are proposing to carry out Highway repair and maintenance works on Woolston Grange Avenue, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 17 Oct 2024 at 14:18.

Electricity North West (NorWeb) logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Birchwood Park Avenue

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Birchwood Park Avenue, Birchwood, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 08:46.

Electricity North West (NorWeb) logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Daten Avenue

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 08:38.

Electricity North West (NorWeb) logo
Between
27 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Nov 2024 at 15:04.

Electricity North West (NorWeb) logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Daten Avenue

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 15 Nov 2024 at 08:42.

Electricity North West (NorWeb) logo
Between
27 Jan and 16 Feb 2025
Details
View Map
Share
Warrington Road

Electricity North West (NorWeb) were proposing to carry out Diversionary works on Warrington Road, Warrington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 16 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Nov 2024 at 08:30.

ManWeb logo
Between
29 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Watkin Street

ManWeb are proposing to carry out Utility repair and maintenance works on Watkin Street, Orford, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 14:44.

Warrington Borough Council logo
Between
29 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Mortimer Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 25 Nov 2024 at 09:48.

Warrington Borough Council logo
Between
29 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Mortimer Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Mortimer Avenue, Orford, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 25 Nov 2024 at 09:47.

The Environment Agency logo
LONG TERM
Between
29 Jan and 16 May 2025
Details
View Map
Share
Follow
Queens Road

The Environment Agency are proposing to carry out Statutory Infrastructure Works on Queens Road, Ashton-in-makerfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by The Environment Agency on 20 Jun 2024 at 08:45.

Electricity North West (NorWeb) logo
Between
30 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Newton Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Newton Lane, Newton-le-willows.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 7 Nov 2024 at 14:52.

ManWeb logo
Between
31 Jan and 14 Feb 2025
Details
View Map
Share
Lower Wash Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Lower Wash Lane, Latchford, Warrington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 14:29.

ManWeb logo
Between
31 Jan and 14 Feb 2025
Details
View Map
Share
Grange Avenue

ManWeb were proposing to carry out Utility repair and maintenance works on Grange Avenue, Latchford, Warrington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 14 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by ManWeb on 8 Nov 2024 at 14:24.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Glebe Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Avenue, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 11:30.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Glebe Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Glebe Avenue, Grappenhall And Thelwall, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 14:05.

Cadent Gas logo
Between
3 and 26 Feb 2025
Details
View Map
Share
Follow
Knutsford Road

Cadent Gas are proposing to carry out Utility asset works on Knutsford Road, Latchford, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 10:37.

United Utilities Water (formerly North West Water) logo
Between
3 and 11 Feb 2025
Details
View Map
Share
Follow
Haig Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Haig Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Oct 2024 at 12:15.

United Utilities Water (formerly North West Water) logo
Between
3 and 11 Feb 2025
Details
View Map
Share
Follow
Haig Avenue

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Haig Avenue, Great Sankey, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Nov 2024 at 10:02.

Warrington Borough Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Honister Avenue

Warrington Borough Council are proposing to carry out Highway improvement works on Honister Avenue, Poplars And Hulme, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Nov 2024 at 13:29.

Warrington Borough Council logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Buttermere Crescent

Warrington Borough Council are proposing to carry out Highway improvement works on Buttermere Crescent, Poplars And Hulme, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 18 Nov 2024 at 13:24.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Twiss Green Lane

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Twiss Green Lane, Culcheth And Glazebury, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 11:35.

Electricity North West (NorWeb) logo
Between
6 and 12 Feb 2025
Details
View Map
Share
Follow
Birchwood Park Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Birchwood Park Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Nov 2024 at 15:08.

Electricity North West (NorWeb) logo
Between
6 and 12 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Nov 2024 at 15:07.

Cadent Gas logo
LONG TERM
Between
6 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Golborne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:48.

Cadent Gas logo
LONG TERM
Between
6 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Wigan Road

Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Golborne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 13 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 15:34.

Electricity North West (NorWeb) logo
Between
7 and 13 Feb 2025
Details
View Map
Share
Follow
Birchwood Park Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Birchwood Park Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 14:36.

Electricity North West (NorWeb) logo
Between
7 and 18 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 14:33.

Electricity North West (NorWeb) logo
Between
7 and 13 Feb 2025
Details
View Map
Share
Follow
Daten Avenue

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Daten Avenue, Birchwood, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 20 Nov 2024 at 14:35.

Warrington Borough Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Elizabeth Drive

Warrington Borough Council are proposing to carry out Highway improvement works on Elizabeth Drive, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 13 Nov 2024 at 13:46.

Warrington Borough Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Anderson Close

Warrington Borough Council are proposing to carry out Highway improvement works on Anderson Close, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 12:38.

Warrington Borough Council logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
Anderson Close

Warrington Borough Council are proposing to carry out Highway improvement works on Anderson Close, Poulton-with-fearnhead, Warrington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Warrington Borough Council on 6 Nov 2024 at 12:40.

Electricity North West (NorWeb) logo
LONG TERM
Between
10 Feb and 16 Mar 2025
Details
View Map
Share
Follow
High Street

Electricity North West (NorWeb) are proposing to carry out Diversionary works on High Street, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 31 Oct 2024 at 13:15.

Cadent Gas logo
Between
17 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Knutsford Road

Cadent Gas are proposing to carry out Utility asset works on Knutsford Road, Latchford, Warrington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:30.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:33.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Manchester Road

Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 09:40.

Cadent Gas logo
LONG TERM
Between
17 Feb and 16 Apr 2025
Details
View Map
Share
Follow
Gig Lane

Cadent Gas are proposing to carry out Utility asset works on Gig Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 16 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 08:37.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Hillock Lane

Cadent Gas are proposing to carry out Utility asset works on Hillock Lane, Woolston, Warrington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 10:00.

Cadent Gas logo
Between
17 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Holes Lane

Cadent Gas are proposing to carry out Utility asset works on Holes Lane, Woolston, Warrington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 10:00.

Cadent Gas logo
Between
17 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Wargrave Road

Cadent Gas are proposing to carry out Utility asset works on Wargrave Road, Newton Le Willows, St Helens.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 12:30.

Electricity North West (NorWeb) logo
Between
20 and 26 Feb 2025
Details
View Map
Share
Follow
Edale Road

Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Edale Road, Leigh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Nov 2024 at 10:52.

Electricity North West (NorWeb) logo
LONG TERM
Between
24 Feb and 13 Apr 2025
Details
View Map
Share
Follow
Rob Lane

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Rob Lane, Newton Le Willows, St Helens.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 31 Oct 2024 at 13:17.


Roadworks Map near to Smithy Brow, WARRINGTON, WA3 7BY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Nov 2024 10:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Smithy Brow, WARRINGTON, WA3 7BY (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
GOSLING ROAD, CROFT 
(0.6 miles)
BT
Utility repair and maintenance works - Footway - Give and take
Cancelled
(Scheduled: 28 Nov 2024 - 2 Dec 2024)
0.6
Details
Share
2
URGENT
  
WINWICK LINK ROAD, WINWICK 
(1.0 miles)
St. Helens Council
Highway improvement works - Carriageway - Road closure
In Progress
Since: 25 Nov 2024 21:00
(Scheduled: 25 Nov 2024 - 30 Nov 2024)
1.0
Details
Share
Follow
3
Warrington Borough Council logo
MAJOR
  
WINWICK LINK ROAD, WINWICK 
(1.0 miles)
Warrington Borough Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 18 Nov 2024 - 20 Dec 2024
1.0
Details
Share
Follow
4
Warrington Borough Council logo
MAJOR
  
WINWICK LINK ROAD, WINWICK 
(1.0 miles)
Warrington Borough Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 18 Nov 2024 - 20 Dec 2024
1.0
Details
Share
Follow
5
MAJOR
  
WINWICK LINK ROAD, WINWICK 
(1.0 miles)
St. Helens Council
Highway improvement works - Footway, Carriageway, Verge - Lane closure
In Progress
Since: 15 Jan 2024 09:30
(Scheduled: 15 Jan 2024 - 13 Jan 2025)
1.0
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.