ROADWORKS SUMMARY
Colet Gardens, LONDON, W14 9DN
Introduction
View current and future planned roadworks and road closures for Colet Gardens, W14 9DN and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Colet Gardens, LONDON, W14 9DN
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Colet Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Today
Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Chelsea Embankment, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 26 March 2020 at 08:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 15 Feb 2024 at 15:50.
5 Oct 2025
London Borough Of Richmond Upon Thames are carrying out roadworks on Carrington Road, Richmond.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 October 2020 at 08:00 and could run through until 5 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 14 Oct 2021 at 11:54.
31 Dec 2024
Thames Tideway Tunnel are carrying out Utility asset works on Trinity Road, Wandsworth, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 5 March 2021 at 14:50 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 1 Jul 2024 at 10:28.
18 May 2025
London Borough Of Ealing are carrying out Highway improvement works on Friary Road, Acton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 1 April 2021 at 00:00 and could run through until 18 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 8 Apr 2024 at 08:28.
24 Feb 2026
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 April 2021 at 08:00 and could run through until 24 February 2026. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 27 Feb 2024 at 12:14.
20 Dec 2024
Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Albert Embankment, Prince's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 20 September 2022 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 23 Oct 2024 at 08:37.
19 Dec 2022 and 18 Dec 2024
Transport for London (TfL) are proposing to carry out roadworks on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2022 and could run through until 18 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 3 Sep 2024 at 09:36.
31 Dec 2024
Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 January 2023 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 9 Jan 2023 at 09:41.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Terrace, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Ellis Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 15:53.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Pont Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Cadogan Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.
7 Jan 2023 and 31 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Harriet Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.
17 Feb 2023 and 30 Apr 2025
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Havelock Terrace, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2023 and could run through until 30 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Wandsworth on 14 May 2024 at 13:21.
17 Feb 2023 and 30 Apr 2025
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Bradmead, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2023 and could run through until 30 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Wandsworth on 14 May 2024 at 13:21.
31 Dec 2024
Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Cadogan Gardens, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 May 2023 at 07:00 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 15 May 2023 at 07:01.
9 Feb 2025
London Borough Of Hammersmith & Fulham are carrying out Highway repair and maintenance works on Hammersmith Bridge Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 August 2023 at 23:01 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 20 May 2024 at 11:32.
Tomorrow
Transport for London (TfL) are carrying out Highway improvement works on Pembroke Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2023 at 08:00 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2023 at 08:59.
9 Dec 2023 and 10 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Du Cane Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2023 and could run through until 10 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 2 Nov 2023 at 14:09.
20 Dec 2024
London Borough Of Camden are carrying out Highway repair and maintenance works on Chalk Farm Road, Camden Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 12:30 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 29 Oct 2024 at 16:28.
7 Feb 2025
Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 January 2024 at 08:30 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 14:36.
17 Jan 2024 and 14 Jan 2026
Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.
14 Feb 2024 and 12 Feb 2025
Transport for London (TfL) are proposing to carry out roadworks on Vauxhall Bridge Road, Tachbrook, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2024 and could run through until 12 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 15:58.
20 Dec 2024
City Of Westminster are carrying out Highway improvement works on Mortimer Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 February 2024 at 12:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 4 Nov 2024 at 15:00.
9 Feb 2025
London Borough Of Hammersmith & Fulham are carrying out Highway improvement works on Hammersmith Bridge, Barnes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 March 2024 at 00:00 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 4 Mar 2024 at 07:34.
1 Mar 2024 and 9 Feb 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 11:02.
1 Mar 2024 and 9 Feb 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Hammersmith Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2024 and could run through until 9 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 1 Mar 2024 at 10:58.
Wednesday
HS2 are carrying out Utility asset works on Ruskin Gardens, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 4 December 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 20 Nov 2024 at 14:54.
Wednesday
HS2 are carrying out Utility asset works on Brentham Way, Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 4 December 2024. The works will impact the carriageway and parking place.
This roadwork event was last updated by HS2 on 19 Nov 2024 at 16:12.
Wednesday
HS2 are carrying out Utility asset works on Brunswick Road, Ealing.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 2 April 2024 at 07:00 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by HS2 on 20 Nov 2024 at 14:54.
3 Mar 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Westway, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 April 2024 at 22:00 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 11:34.
7 Dec 2024
UK Power Networks Eastern & London are carrying out Utility asset works on Greencroft Gardens, Swiss Cottage, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 April 2024 at 09:00 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 31 Oct 2024 at 07:08.
Tomorrow
London Borough Of Richmond Upon Thames are proposing to carry out roadworks on Station Approach, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2024 and could run through until 1 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Richmond Upon Thames on 17 Apr 2024 at 10:20.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 09:44.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 12:45.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 09:46.
7 May 2024 and 21 Jan 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 12:51.
7 Dec 2024
HS2 are carrying out Section 50 on Oxford Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2024 at 19:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:09.
7 Dec 2024
HS2 are carrying out Section 50 on Oxford Road, Maida Vale, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 May 2024 at 19:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:14.
7 Dec 2024
HS2 are carrying out Section 50 on Greville Road, Kilburn, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 May 2024 at 11:00 and could run through until 7 December 2024. The works will impact the footway, carriageway and parking place.
This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:16.
10 Feb 2025
Thames Water are carrying out Disconnection or alteration of supply on Wiltshire Road, Brixton North, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2024 at 08:00 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 29 May 2024 at 07:50.
13 Feb 2025
Thames Water are carrying out Disconnection or alteration of supply on Western Road, Brixton North, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2024 at 10:45 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Jun 2024 at 09:54.
10 Jun 2024 and 13 Apr 2026
Transport for London (TfL) are proposing to carry out roadworks on Kennington Lane, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 13 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2024 at 10:34.
Monday
Thames Water are carrying out Utility asset works on Acton Lane, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 08:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:27.
18 Jun 2025
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Totterdown Street, Tooting, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 June 2024 at 08:00 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 26 Jun 2024 at 07:16.
Friday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Winchester Road, Swiss Cottage, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 June 2024 at 11:40 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 07:51.
24 Jun 2024 and 1 Apr 2025
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Randall Close, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 1 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Wandsworth on 4 Jul 2024 at 14:24.
31 Jul 2025
Thames Tideway Tunnel are carrying out Works for road purposes on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 26 June 2024 at 08:00 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Tideway Tunnel on 24 Jul 2024 at 12:05.
20 Dec 2024
City Of Westminster are carrying out Highway improvement works on Great Titchfield Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 July 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by City Of Westminster on 4 Nov 2024 at 14:59.
7 Feb 2025
Thames Water are carrying out Disconnection or alteration of supply on Gresham Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 July 2024 at 11:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Jul 2024 at 10:51.
31 Jan 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Wood Lane, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:53.
31 Jan 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on South Africa Road, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 7 July 2024 at 07:30 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Jul 2024 at 17:54.
8 Jul 2025
Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Lower Sloane Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 July 2024 at 08:00 and could run through until 8 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 8 Jul 2024 at 07:51.
Monday
Thames Water are carrying out Utility asset works on Greenhill Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 July 2024 at 14:35 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:28.
Friday
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on St John's Wood Park, Swiss Cottage, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 July 2024 at 09:49 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Nov 2024 at 14:19.
7 Dec 2024
Thames Water are carrying out Utility asset works on Victoria Street, St James's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 22 July 2024 at 08:00 and could run through until 7 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 14:00.
21 Jul and 22 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerley Street, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 24 Apr 2023 at 08:07.
21 Jul and 22 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornsett Road, Earlsfield, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 24 Apr 2023 at 13:11.
23 Jul and 22 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 13 Apr 2023 at 07:11.
23 Jul and 22 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 13 Apr 2023 at 07:12.
23 Jul and 22 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 13 Apr 2023 at 07:08.
29 Jul 2024 and 5 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Kempsford Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 26 Jul 2024 at 15:30.
29 Jul 2024 and 5 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Wincott Street, Kennington, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 29 July 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 26 Jul 2024 at 15:30.
13 Dec 2024
Thames Water are carrying out Utility asset works on Wilton Road, Warwick, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 31 July 2024 at 10:30 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 14:01.
12 Aug 2024 and 22 Jul 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 August 2024 and run through until 22 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Sep 2024 at 08:56.
12 Sep 2025
London Borough Of Camden are carrying out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 12 September 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 23 Oct 2024 at 18:06.
19 Aug 2024 and 30 Jun 2025
London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Concert Hall Approach, Waterloo & Southbank, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 August 2024 and run through until 30 June 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 07:44.
19 Aug 2024 and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 8 Aug 2024 at 14:49.
19 Aug 2024 and 25 Apr 2025
London Borough Of Lambeth were proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 August 2024 and run through until 25 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 1 Aug 2024 at 10:36.
19 Aug 2024 and 25 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 2 Aug 2024 at 13:35.
19 Aug 2024 and 12 Feb 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Rupert Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2024 and could run through until 12 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 29 May 2024 at 08:38.
12 Feb 2025
City Of Westminster are carrying out Highway repair and maintenance works on Rupert Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 August 2024 at 08:00 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 19 Aug 2024 at 08:42.
27 Aug 2024 and 27 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 August 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 1 May 2024 at 08:04.
13 Dec 2024
City Of Westminster are carrying out Highway repair and maintenance works on Carrington Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 August 2024 at 08:00 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 4 Nov 2024 at 15:31.
29 Aug and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:17.
29 Aug and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:16.
29 Aug and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:18.
29 Aug and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:18.
7 Mar 2025
Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Draycott Avenue, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 September 2024 at 08:00 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 2 Sep 2024 at 09:00.
7 Dec 2024
HS2 are carrying out Section 50 on Kilburn High Road, Maida Vale, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 September 2024 at 00:01 and could run through until 7 December 2024. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:27.
7 Dec 2024
HS2 are carrying out Section 50 on Kilburn High Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 September 2024 at 00:01 and could run through until 7 December 2024. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:29.
7 Dec 2024
HS2 are carrying out Section 50 on Kilburn High Road, Kilburn, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 September 2024 at 00:01 and could run through until 7 December 2024. The works will impact the footway, carriageway and bus stop or stand.
This roadwork event was last updated by HS2 on 7 Nov 2024 at 12:25.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:42.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:42.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:55.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:55.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 07:08.
4 Jan 2025
London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 07:08.
9 Sep 2024 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:21.
9 Sep 2024 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:23.
9 Sep 2024 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:22.
9 Sep 2024 and 29 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:22.
9 Sep 2024 and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 2 Sep 2024 at 12:45.
9 Sep 2024 and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 12:00.
30 Jun 2025
London Borough Of Lambeth are carrying out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 08:13.
6 Feb 2025
Thames Water are carrying out Disconnection or alteration of supply on Gilbert Road, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 13:50 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Sep 2024 at 14:37.
16 Sep and 13 Dec 2024
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Richardson's Mews, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 21 Jun 2024 at 16:21.
17 Sep 2024 and 29 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 10:42.
17 Sep 2024 and 30 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 30 May 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 10:41.
17 Sep 2024 and 29 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 08:41.
17 Sep 2024 and 29 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 08:42.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 11:56.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 13:27.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:05.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 09:10.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 14:57.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.
17 Sep 2024 and 1 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 14:57.
1 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:07.
18 Sep and 28 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 September 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2024 at 13:34.
Friday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Newport Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 September 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 12 Sep 2024 at 07:01.
Friday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Charing Cross Road, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 September 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 15 Aug 2024 at 09:28.
20 Dec 2024
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Putney High Street, Putney, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 1 Oct 2024 at 13:25.
27 Sep and 13 Dec 2024
London Borough Of Hounslow are proposing to carry out Highway improvement works on High Street, Brentford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Hounslow on 1 Oct 2024 at 14:55.
23 Jun 2025
London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 October 2024 at 08:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Wandsworth on 23 Oct 2024 at 09:06.
30 Sep 2024 and 1 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2024 at 12:20.
Tomorrow
Thames Water are carrying out Utility repair and maintenance works on Mount Road, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 13:40 and could run through until 1 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:46.
6 Oct 2024 and 31 Mar 2026
City Of Westminster were proposing to carry out Section 50 on Oxford Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 October 2024 and run through until 31 March 2026. The works were due to impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 13:24.
12 Oct 2024 and 12 Oct 2025
London Borough Of Southwark were proposing to carry out Highway improvement works on Colombo Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 October 2024 and run through until 12 October 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 06:32.
14 Oct 2024 and 31 May 2025
City Of Westminster were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Aug 2024 at 16:45.
14 Oct 2024 and 31 May 2025
City Of Westminster were proposing to carry out Highway improvement works on Piccadilly, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Aug 2024 at 16:50.
14 Oct 2024 and 31 May 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 31 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 30 Aug 2024 at 13:52.
14 Oct 2024 and 31 Mar 2025
Thames Water are proposing to carry out Utility asset works on Bristol Gardens, Little Venice, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 10 Jul 2024 at 10:35.
Monday
Thames Water are carrying out Utility asset works on Connaught Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 10:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:28.
Friday
London Borough Of Camden are carrying out Highway repair and maintenance works on Hermit Place, Kilburn, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 09:42.
Today
Thames Water are carrying out Utility asset works on Denbigh Street, Warwick, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 17 October 2024 at 11:45 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 13:20.
7 Dec 2024
Thames Water are carrying out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 10:20 and could run through until 7 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 10:05.
19 Oct 2024 and 25 Apr 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2024 and could run through until 25 April 2025. The works will impact the footway, carriageway and cycleway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Lambeth on 2 Aug 2024 at 11:58.
19 Oct and 21 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Network Rail on 10 Oct 2024 at 16:26.
21 Dec 2024
Network Rail are carrying out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 19 October 2024 at 22:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 20 Oct 2024 at 09:21.
21 Oct and 20 Dec 2024
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Kilburn Lane, Kilburn, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Brent on 18 Oct 2024 at 22:19.
20 Dec 2024
London Borough Of Brent are carrying out Highway repair and maintenance works on Kilburn Lane, Kilburn, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Brent on 22 Oct 2024 at 08:55.
18 Dec 2024
Thames Water are carrying out Utility asset works on Woodbury Street, Tooting, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 October 2024 at 10:00 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:47.
21 Oct and 11 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on London Road, Brentford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 26 Sep 2024 at 07:27.
11 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on London Road, Brentford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 26 Nov 2024 at 16:31.
14 Jan 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on De Laune Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:45 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 13:27.
14 Jan 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Braganza Street, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:45 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 13:27.
14 Jan 2025
London Borough Of Southwark are carrying out Highway repair and maintenance works on Alberta Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 09:45 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 13:50.
21 Oct 2024 and 3 Jun 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensington Park Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 3 June 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Sep 2024 at 11:22.
21 Oct 2024 and 3 Jun 2025
Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensington Park Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 3 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 09:06.
15 Dec 2024
Thames Water are carrying out Utility asset works on Tooting High Street, Tooting, London.
These works are categorised as Major.
The works started on 24 October 2024 at 10:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:46.
22 Oct and 17 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Great Newport Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by City Of Westminster on 18 Sep 2024 at 09:31.
17 Dec 2024
City Of Westminster are carrying out Highway repair and maintenance works on Great Newport Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 October 2024 at 08:00 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 30 Oct 2024 at 09:11.
22 Oct and 24 Dec 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Tavistock Place, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 October 2024 and could run through until 24 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 24 Oct 2024 at 15:04.
28 Oct 2024 and 12 Dec 2025
HS2 are proposing to carry out Works for Rail Purposes on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 12 December 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by HS2 on 11 Oct 2024 at 15:18.
12 Dec 2025
HS2 are carrying out Works for Rail Purposes on Hampstead Road, Regent's Park, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 01:00 and could run through until 12 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by HS2 on 28 Oct 2024 at 11:18.
28 Oct 2024 and 12 Sep 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 12 September 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 5 Aug 2024 at 11:23.
28 Oct and 15 Dec 2024
Thames Water are proposing to carry out Utility asset works on Woodbury Street, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 23 May 2024 at 12:10.
28 Oct and 15 Dec 2024
Thames Water are proposing to carry out Utility asset works on Woodbury Street, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 28 Aug 2024 at 08:25.
28 Oct and 15 Dec 2024
Thames Water are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.
These works are categorised as Major.
The works will start on or after 28 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 29 May 2024 at 08:57.
8 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:30 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 07:54.
8 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Penwith Road, Southfields, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:38 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 15:43.
8 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Garratt Lane, Tooting, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:30 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Oct 2024 at 13:09.
8 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Duntshill Road, Southfields, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:30 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 07:55.
28 Oct 2024 and 31 Jan 2026
Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 31 January 2026. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:12.
28 Oct and 21 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Ponton Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:31.
28 Oct and 21 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:20.
28 Oct and 21 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2024 at 10:23.
28 Oct 2024 and 23 May 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Hogarth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 23 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 18 Sep 2024 at 16:21.
23 May 2025
Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Hogarth Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:00 and could run through until 23 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 28 Oct 2024 at 08:31.
29 Oct and 31 Dec 2024
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Adelaide Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 October 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by London Borough Of Camden on 15 Nov 2024 at 12:15.
15 Dec 2024
London Borough Of Camden are carrying out Highway improvement works on Wren Street, King's Cross, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 10:00 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Nov 2024 at 10:03.
4 Nov and 15 Dec 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Wren Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:19.
4 Nov and 15 Dec 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Wren Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 12:54.
4 Nov and 15 Dec 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Frederick Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 30 Oct 2024 at 08:53.
4 Nov and 15 Dec 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Frederick Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:18.
4 Nov and 15 Dec 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Frederick Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 12:53.
4 Nov 2024 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 7 Aug 2024 at 15:06.
4 Nov 2024 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 10:39.
4 Nov 2024 and 28 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Northdown Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Jul 2024 at 05:57.
Thursday
London Borough Of Camden were proposing to carry out Highway repair and maintenance works on Kilburn High Road, Kilburn, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 5 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 12:36.
4 Nov 2024 and 31 Jan 2025
Thames Water are proposing to carry out Utility asset works on Lydford Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.
4 Nov and 9 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thurleigh Road, Balham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2024 at 07:52.
23 May 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:00 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 08:35.
4 Nov and 8 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Strand, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 08:25.
Friday
Murphy Power Distribution were proposing to carry out Utility asset works on Great Chapel Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 13 Sep 2024 at 14:22.
11 Dec 2024
Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Ashburn Place, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 08:00 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 19 Nov 2024 at 16:38.
Thursday
London Borough Of Camden are carrying out Highway repair and maintenance works on Kilburn High Road, Kilburn, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 November 2024 at 08:00 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 6 Nov 2024 at 09:23.
8 Nov 2024 and 3 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 11:05.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:14.
17 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Westway, Harrow Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:56.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 14 Aug 2024 at 13:03.
17 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:57.
8 Nov 2024 and 20 Feb 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Redhill Street, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:21.
20 Feb 2025
London Borough Of Camden are carrying out Highway improvement works on Redhill Street, Regent's Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 08:00 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 8 Nov 2024 at 09:11.
8 Nov and 13 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 23 Aug 2024 at 15:02.
8 Nov 2024 and 28 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 28 January 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 15:23.
Tuesday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Fawcett Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 10:40.
8 Nov and 13 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tregunter Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 10:41.
Tuesday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 16:05.
8 Nov 2024 and 3 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 13:18.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:12.
17 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Westway, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:59.
8 Nov 2024 and 3 Feb 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Jul 2024 at 11:07.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.
17 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:59.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:11.
17 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:58.
8 Nov 2024 and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 November 2024 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 20:09.
17 Feb 2025
Transport for London (TfL) are carrying out Highway improvement works on Westway, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 22:00 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:58.
18 Dec 2024
Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.
These works are categorised as Major.
The works started on 11 November 2024 at 12:20 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:23.
11 Nov 2024 and 9 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wye Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:54.
11 Nov 2024 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 09:54.
17 Jan 2025
Transport for London (TfL) are carrying out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:10.
11 Nov and 21 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 11:48.
11 Nov and 21 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 13:55.
11 Nov and 13 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Footpath From London Road To Brent Lea, Brentford.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 13:11.
11 Nov and 21 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 11:26.
11 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Grosvenor Road, Churchill, London.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 14:32.
11 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Grosvenor Road, Churchill, London.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:30.
14 Dec 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Grosvenor Road, Churchill, London.
These works are categorised as Major.
The works started on 11 November 2024 at 21:00 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 06:49.
11 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millbank, Vincent Square, London.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 14:31.
11 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millbank, Vincent Square, London.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:36.
14 Dec 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Millbank, Vincent Square, London.
These works are categorised as Major.
The works started on 11 November 2024 at 21:00 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 06:50.
11 Nov and 22 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Ealing Road, Brentford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 15:43.
Monday
Cadent Gas are proposing to carry out Utility asset works on Ealing Road, Brentford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 11:57.
Monday
Cadent Gas are carrying out Utility asset works on Ealing Road, Brentford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 15:07 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:17.
11 Nov 2024 and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 11:05.
11 Nov and 21 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:00.
11 Nov and 21 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 16:43.
11 Nov and 21 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:46.
11 Nov and 21 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:00.
11 Nov and 21 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 21 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:39.
11 Nov and 15 Dec 2024
Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 09:54.
Friday
UK Power Networks Eastern & London are proposing to carry out New service connection on High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Aug 2024 at 09:26.
12 Nov 2024 and 7 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Earl's Court Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 7 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Aug 2024 at 17:12.
23 Dec 2024
Cadent Gas are carrying out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 16:50 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 18:27.
12 Nov and 23 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 November 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 17:10.
12 Nov and 21 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 12:02.
21 Dec 2024
Cadent Gas are carrying out Utility asset works on Victoria Embankment, St James's, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 12 November 2024 at 07:39 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 08:03.
Friday
City Of Westminster are carrying out Highway repair and maintenance works on Little Newport Street, St James's, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 19 November 2024 at 08:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 28 Nov 2024 at 14:57.
31 Jan 2025
Thames Water are carrying out roadworks on Balham Park Road, Balham, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 11:00 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:54.
31 Jan 2025
Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 11:00 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:10.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Berwyn Road, Richmond.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 08:00 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:51.
12 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Abbey Road, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 12:50 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 13:38.
12 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Cumberland Avenue, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 November 2024 at 12:50 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 13:38.
9 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Meteor Street, Battersea, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 22:00 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 15:08.
15 Nov and 9 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Thorne Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Aug 2024 at 14:57.
Today
Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 November 2024 and run through until 30 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 10:09.
Friday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cavendish Road, Balham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 13:05.
Friday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cavendish Road, Clapham Park, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 09:06.
Friday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Old Devonshire Road, Balham, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 8 Oct 2024 at 16:02.
Monday
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Nov 2024 at 09:34.
Monday
Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on Great West Road, Brentford.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 15 Nov 2024 at 09:05.
Today
Transport for London (TfL) are proposing to carry out Highway improvement works on Butterwick, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 11:58.
Transport for London (TfL) carried out Highway improvement works on Butterwick, London.
These works were categorised as Major.
A lane was closed for some or all of the period.
The works were originally planned between 18 Nov 2024 and 30 Nov 2024 and were actually completed between 18 Nov 2024 (22:00) and 30 Nov 2024 (05:00). The works impacted the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Nov 2024 at 08:57.
Today
Transport for London (TfL) are proposing to carry out Highway improvement works on Hammersmith Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 30 November 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 09:48.
Transport for London (TfL) carried out Highway improvement works on Hammersmith Road, London.
These works were categorised as Major.
Multi-way signals were in place for some or all of the period.
The works were originally planned between 18 Nov 2024 and 30 Nov 2024 and were actually completed between 18 Nov 2024 (22:00) and 30 Nov 2024 (05:00). The works impacted the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 30 Nov 2024 at 08:57.
Monday
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 2 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 10:11.
18 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Gower Street, Bloomsbury, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:48.
21 Dec 2024
Transport for London (TfL) are carrying out Highway improvement works on Gower Street, Bloomsbury, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 08:01.
18 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Gordon Street, Bloomsbury, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:48.
21 Dec 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Gordon Street, Bloomsbury, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 08:01.
18 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Upper Woburn Place, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:48.
21 Dec 2024
Transport for London (TfL) are carrying out Highway improvement works on Upper Woburn Place, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 07:59.
18 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Endsleigh Gardens, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 13:47.
21 Dec 2024
Transport for London (TfL) are carrying out Highway improvement works on Endsleigh Gardens, Bloomsbury, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 08:02.
18 Nov and 14 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Euston Road, King's Cross, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 08:59.
21 Dec 2024
Transport for London (TfL) are carrying out Highway improvement works on Euston Road, King's Cross, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 19 Nov 2024 at 08:00.
Tomorrow
Thames Water are proposing to carry out New service connection on Crestfield Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 17:21.
Friday
Murphy Power Distribution are proposing to carry out New service connection on Central Way, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 21 Aug 2024 at 16:25.
Friday
Murphy Power Distribution are carrying out New service connection on Central Way, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 11:53 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 18 Nov 2024 at 11:59.
18 Nov and 9 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Chatsworth Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 13:24.
9 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Chatsworth Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:25.
31 Jan 2025
Thames Water are carrying out Utility asset works on Lydford Road, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 08:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:24.
18 Nov and 9 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Willoughby Road, Hampstead Town, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 17:20.
Wednesday
ESP Electricity are carrying out Utility repair and maintenance works on Bramshill Road, London.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 09:11 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 28 Nov 2024 at 18:40.
Wednesday
Virgin Media were proposing to carry out Utility asset works on Stanhope Gate, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 November 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 16 Aug 2024 at 15:19.
Wednesday
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 21 Oct 2024 at 12:08.
Wednesday
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 30 Oct 2024 at 09:32.
Wednesday
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 4 Nov 2024 at 08:39.
Wednesday
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 18 Oct 2024 at 08:11.
Thursday
Electricity Network Company are carrying out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 November 2024 at 13:30 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 28 Nov 2024 at 13:33.
Wednesday
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 13 Sep 2024 at 10:38.
Wednesday
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 16 Oct 2024 at 13:23.
Friday
Thames Water are carrying out Utility repair and maintenance works on Gloucester Place, Bryanston & Dorset Square, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 13:30 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 11:47.
Friday
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hamilton Terrace, Abbey Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Oct 2024 at 09:31.
22 Nov and 17 Dec 2024
UK Power Networks Eastern & London were proposing to carry out New service connection on High Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 17 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Aug 2024 at 17:23.
22 Nov 2024 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Adelaide Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 November 2024 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 15:59.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Lovett Way, London.
The works started on 23 November 2024 at 09:54 and could run through until 3 December 2024. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 16:30.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Rutland Grove, London.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 24 November 2024 at 00:20 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 14:19.
8 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 10:00 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 11:13.
Tuesday
Southern Gas Networks were proposing to carry out New service connection on Jephtha Road, Wandsworth, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 3 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 12:27.
8 Dec 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Upper Richmond Road West, East Sheen.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 22:00 and could run through until 8 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 08:22.
8 Dec 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Upper Richmond Road West, East Sheen.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 22:00 and could run through until 8 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 08:23.
8 Dec 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Upper Richmond Road West, East Sheen.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 22:00 and could run through until 8 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 08:22.
8 Dec 2024
Transport for London (TfL) are carrying out Highway repair and maintenance works on Upper Richmond Road West, East Sheen.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 22:00 and could run through until 8 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 08:22.
14 Jan 2025
UK Power Networks Eastern & London are carrying out Utility asset works on Wye Street, Battersea, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 08:00 and could run through until 14 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 08:08.
25 Nov and 13 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Syon Lane, Isleworth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Nov 2024 at 09:13.
13 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Syon Lane, Isleworth.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 20:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 26 Nov 2024 at 09:13.
Monday
Thames Tideway Tunnel are proposing to carry out Highway improvement works on Chelsea Embankment, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 25 Nov 2024 at 10:23.
Monday
Thames Tideway Tunnel are carrying out Highway improvement works on Chelsea Embankment, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 22:00 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Tideway Tunnel on 26 Nov 2024 at 09:15.
Friday
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Reedworth Street, Kennington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 4 Jul 2024 at 07:36.
Today
Thames Water are proposing to carry out Utility asset works on Wilton Road, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 10:34.
Today
Thames Water are carrying out Utility asset works on Wilton Road, Warwick, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 16:00 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 16:24.
8 Feb 2025
London Borough Of Lambeth are carrying out Highway repair and maintenance works on Hercules Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:30 and could run through until 8 February 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 25 Nov 2024 at 09:25.
Monday
Thames Water are proposing to carry out New service connection on Enfield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Sep 2024 at 10:04.
Monday
Thames Water are carrying out New service connection on Enfield Road, Acton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 12:24 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 13:15.
Monday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Holland Park Mews, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 18:44 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 15:05.
Friday
Stark Infra – Electric are proposing to carry out Statutory Infrastructure Works on Bruton Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Stark Infra – Electric on 25 Sep 2024 at 13:43.
Monday
Cadent Gas were proposing to carry out Remedial works on Wardour Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:09.
Monday
Cadent Gas are carrying out Remedial works on Wardour Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:50 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 10:34.
Monday
Cadent Gas were proposing to carry out Remedial works on Wardour Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 16:11.
Monday
Cadent Gas are carrying out Remedial works on Wardour Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:50 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 10:34.
Monday
Cadent Gas are proposing to carry out Utility asset works on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Sep 2024 at 14:09.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Dean Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Oct 2024 at 14:49.
9 Dec 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Old Oak Common Lane, Acton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 13:30 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 14:47.
15 Dec 2024
Thames Water are carrying out Utility asset works on Marylebone Road, Marylebone High Street, London.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:32 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 09:32.
25 Nov and 21 Dec 2024
London Borough Of Camden are proposing to carry out Highway improvement works on Georgiana Street, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 24 Sep 2024 at 08:57.
21 Dec 2024
London Borough Of Camden are carrying out Highway improvement works on Georgiana Street, Camden Town, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 25 Nov 2024 at 09:33.
26 Nov 2024 and 24 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 14:26.
26 Nov 2024 and 24 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Pentonville Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 11:24.
26 Nov 2024 and 24 Mar 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Northdown Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 09:45.
Monday
Thames Water were proposing to carry out Utility repair and maintenance works on Lacy Road, Putney, London.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 15:06.
Monday
Thames Water are carrying out Utility repair and maintenance works on Ebury Bridge Road, Churchill, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 16:38 and could run through until 2 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 10:46.
Monday
Thames Water were proposing to carry out New service connection on Kingsdown Avenue, West Ealing.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 2 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 09:55.
Monday
Thames Water are proposing to carry out New service connection on Kingsdown Avenue, West Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 09:07.
Monday
Thames Water are carrying out New service connection on Kingsdown Avenue, West Ealing.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 10:49 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 11:43.
Today
Thames Water are proposing to carry out New service connection on Bourdon Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 12:02.
Today
Thames Water are carrying out New service connection on Bourdon Street, West End, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 07:52 and could run through until 30 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 09:00.
Today
London Borough Of Ealing are proposing to carry out Highway improvement works on Uxbridge Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 27 Nov 2024 at 14:56.
Wednesday
Cadent Gas are carrying out Utility repair and maintenance works on Edgware Road, Hyde Park, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 09:24 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 10:37.
City Of Westminster carried out Highway repair and maintenance works on Harrow Road, Westbourne, London.
These works were categorised as Major.
The road was closed for some or all of the period.
The works were originally planned between 27 Nov 2024 and 30 Nov 2024 and were actually completed between 27 Nov 2024 (20:00) and 30 Nov 2024 (05:00). The works impacted the carriageway only.
This roadwork event was last updated by City Of Westminster on 30 Nov 2024 at 08:21.
Tuesday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Senior Street, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Sep 2024 at 12:36.
Tuesday
City Of Westminster are carrying out Highway repair and maintenance works on Senior Street, Westbourne, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 14:00 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 14:34.
Tuesday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Lord Hills Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Sep 2024 at 12:41.
Tuesday
City Of Westminster are carrying out Highway repair and maintenance works on Lord Hills Road, Westbourne, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 14:00 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 14:34.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Marylebone High Street, Marylebone High Street, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 15:05 and could run through until 3 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 12:15.
Tuesday
Thames Water were proposing to carry out Utility repair and maintenance works on Devonshire Place Mews, Marylebone High Street, London.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 3 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 07:46.
Tuesday
Thames Water are carrying out Utility repair and maintenance works on Hendon Way, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2024 at 15:30 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 11:12.
Thursday
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 November 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 11:45.
28 Nov and 11 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Lisson Grove, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 4 Nov 2024 at 12:08.
28 Nov and 11 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Lisson Grove, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 14 Nov 2024 at 15:58.
Friday
Cadent Gas are carrying out Utility repair and maintenance works on Culworth Street, Regent's Park, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 06:58 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 12:21.
18 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Franklyn Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 12:00 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 18:49.
Wednesday
Thames Water are carrying out Utility repair and maintenance works on St Andrews Road, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 16:34 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 07:51.
13 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Derwent Avenue, Kingston Vale.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 11:00 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 16:37.
13 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Kingston Vale, London.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 11:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 16:37.
27 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Kingston Vale, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 00:25 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 12:15.
Today
Thames Water are carrying out Remedial works on Victoria Street, St James's, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 09:45 and could run through until 30 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Nov 2024 at 14:30.
28 Nov and 20 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Hyde Park Crescent, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 10:59.
28 Nov and 20 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Hyde Park Crescent, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 15:09.
28 Nov and 20 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Somers Crescent, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 10:59.
28 Nov and 20 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Somers Crescent, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 10:19.
7 Dec 2024
Thames Water are carrying out Utility repair and maintenance works on Roehampton Vale, Roehampton, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 02:45 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:31.
Thursday
Thames Water are carrying out Utility repair and maintenance works on Ponsonby Road, Roehampton, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 18:00 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 18:00.
Friday
Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Beech Avenue, Brentford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 11:30 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 29 Nov 2024 at 13:28.
Thursday
Thames Water are carrying out Utility repair and maintenance works on Nine Elms Lane, Battersea, London.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 15:18 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 15:18.
Thursday
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Bassington Road, Acton.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 13:16 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Nov 2024 at 14:46.
Thursday
Thames Water are carrying out Utility repair and maintenance works on Berkeley Street, West End, London.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 07:25 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 13:15.
Tomorrow
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Emerald Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 09:00 and could run through until 1 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 14:38.
7 Dec 2024
UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Hall Road, Regent's Park, London.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 12:00 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 12:30.
29 Nov and 7 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Grove End Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 09:24.
17 Jan 2025
London Borough Of Camden are carrying out Highway repair and maintenance works on Prince Of Wales Road, Haverstock, London.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 08:00 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 9 Sep 2024 at 10:25.
2 and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 18:14.
2 and 16 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Braybrook Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 08:10.
2 and 16 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 10:09.
2 and 16 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Old Oak Common Lane, Acton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Oct 2024 at 11:31.
2 and 13 Dec 2024
UK Power Networks Eastern & London were proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Sep 2024 at 08:39.
Thursday
UK Power Networks Eastern & London were proposing to carry out New service connection on William Road, Regent's Park, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 10:04.
2 and 9 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 09:52.
2 and 25 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Fernhead Road, Harrow Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 25 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 27 Sep 2024 at 16:01.
Friday
UK Power Networks Eastern & London are proposing to carry out New service connection on Monks Park, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 14:32.
2 and 22 Dec 2024
Thames Water are proposing to carry out Utility asset works on Buxton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.
2 and 22 Dec 2024
Thames Water are proposing to carry out Utility asset works on Buxton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 08:16.
2 Dec 2024 and 25 May 2025
Thames Water are proposing to carry out Utility asset works on Chapter Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 09:27.
2 Dec 2024 and 25 May 2025
Thames Water are proposing to carry out Utility asset works on Chapter Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 25 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 08:16.
Thursday
Thames Water are proposing to carry out Disconnection or alteration of supply on Holly Walk, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 09:16.
2 and 13 Dec 2024
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thorncliffe Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 20 Nov 2024 at 12:41.
2 and 13 Dec 2024
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thornbury Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 20 Nov 2024 at 12:41.
2 and 13 Dec 2024
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Rosebery Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 20 Nov 2024 at 12:41.
2 and 13 Dec 2024
London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 19 Nov 2024 at 08:30.
Wednesday
Thames Water are proposing to carry out Utility repair and maintenance works on Bettridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Oct 2024 at 12:52.
Wednesday
Thames Water are proposing to carry out Utility repair and maintenance works on Bettridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:52.
Friday
Thames Water are proposing to carry out New service connection on Station Approach Road, Chiswick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 10:58.
Friday
Thames Water were proposing to carry out New service connection on Station Approach Road, Chiswick, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 10:51.
2 and 13 Dec 2024
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Victoria Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 14:03.
Friday
Thames Water were proposing to carry out Disconnection or alteration of supply on Pavilion Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 15:51.
Thursday
Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 11:37.
2 Dec 2024 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Shepherd's Bush Green, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
Wednesday
City Of London Telecomms are proposing to carry out Utility asset works on Colombo Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 1 Nov 2024 at 10:54.
Wednesday
City Of London Telecomms are proposing to carry out Utility asset works on Colombo Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 25 Nov 2024 at 12:28.
2 Dec 2024 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bulwer Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
2 Dec 2024 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
2 and 13 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Aubrey Walk, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:09.
Wednesday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route (A3220), London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 11:12.
Wednesday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Cross Route, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 10:51.
Wednesday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 11:12.
Wednesday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westway, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 11:03.
Wednesday
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 7 Nov 2024 at 10:21.
Thursday
Thames Water are proposing to carry out Disconnection or alteration of supply on Wigmore Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 5 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 10:49.
Thursday
Thames Water are proposing to carry out Utility repair and maintenance works on Edith Terrace, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:21.
3 and 7 Dec 2024
Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Southam Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:36.
3 and 7 Dec 2024
Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Adair Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:39.
3 and 7 Dec 2024
Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Golborne Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:33.
3 and 7 Dec 2024
Royal Borough Of Kensington And Chelsea were proposing to carry out Highway improvement works on Kensal Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 December 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Oct 2024 at 15:32.
Friday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:27.
Friday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 16:20.
Friday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Fourth Avenue, Queen's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 15:44.
4 and 14 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 10 Oct 2024 at 14:57.
Friday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Cheval Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 11:18.
Friday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Rutland Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 11:19.
Friday
City Of Westminster are proposing to carry out Highway repair and maintenance works on Fairholt Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 16 Oct 2024 at 11:20.
4 and 13 Dec 2024
Transport for London (TfL) were proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 17:26.
4 and 13 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Knightsbridge, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 17:28.
5 and 11 Dec 2024
ESP Electricity are proposing to carry out Utility asset works on Bramwell Place, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 12 Sep 2024 at 15:03.
5 and 18 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 12 Sep 2024 at 12:49.
5 and 9 Dec 2024
Electricity Network Company are proposing to carry out Utility asset works on Bollo Bridge Road, Acton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Electricity Network Company on 20 Nov 2024 at 12:45.
5 and 19 Dec 2024
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Nicoll Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 29 Nov 2024 at 10:40.
5 and 19 Dec 2024
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Nicoll Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 29 Nov 2024 at 10:40.
6 and 9 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 9 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Sep 2024 at 15:58.
6 and 11 Dec 2024
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Union Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 1 Nov 2024 at 10:17.
6 and 8 Dec 2024
Thames Water are proposing to carry out Utility asset works on Kings Scholars' Passage, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 15:38.
6 and 8 Dec 2024
Thames Water are proposing to carry out Utility asset works on Kings Scholars' Passage, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 08:56.
8 and 20 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 09:56.
8 and 20 Dec 2024
Transport for London (TfL) are proposing to carry out Highway improvement works on Harrow Road, Westbourne, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 09:56.
9 and 18 Dec 2024
UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Mount Pleasant, Holborn And Covent Garden, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Sep 2024 at 08:10.
9 and 20 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bernhardt Crescent, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 7 Nov 2024 at 11:19.
9 and 20 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bernhardt Crescent, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 28 Nov 2024 at 15:23.
9 and 13 Dec 2024
Thames Water are proposing to carry out New service connection on Coronation Road, Park Royal.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:08.
9 and 11 Dec 2024
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Adelaide Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:02.
9 and 11 Dec 2024
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Eton Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:05.
9 and 11 Dec 2024
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Eton Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 4 Nov 2024 at 10:42.
9 Dec 2024 and 17 Jan 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Prince Of Wales Road, Haverstock, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 6 Sep 2024 at 12:17.
9 and 12 Dec 2024
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Well Road, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:01.
9 and 13 Dec 2024
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Grove Place, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:01.
9 and 17 Dec 2024
Thames Water are proposing to carry out New service connection on Mexfield Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Sep 2024 at 10:07.
9 and 17 Dec 2024
Thames Water are proposing to carry out New service connection on Mexfield Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 14:37.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:21.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Twickenham Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:39.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:17.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kew Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:48.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:19.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Mortlake Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:40.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:15.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Lower Richmond Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:46.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 8 Aug 2024 at 13:20.
9 and 11 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clifford Avenue, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 22 Aug 2024 at 14:50.
9 Dec 2024 and 6 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 5 Sep 2024 at 12:39.
9 and 16 Dec 2024
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 5 Sep 2024 at 12:40.
9 and 11 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Netheravon Road, Chiswick, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 13:45.
9 and 23 Dec 2024
Virgin Media are proposing to carry out Utility asset works on Hans Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 6 Sep 2024 at 14:06.
9 Dec 2024 and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wood Lane, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 2 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
9 and 24 Dec 2024
T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Kensington Park Gardens, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 24 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 28 Nov 2024 at 10:15.
10 and 12 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Parthenia Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 11:18.
10 and 12 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Parthenia Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 09:16.
10 Dec 2024 and 28 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Street, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 10 Sep 2024 at 11:13.
10 and 12 Dec 2024
G. Network Communications are proposing to carry out Utility asset works on Hornton Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by G. Network Communications on 7 Nov 2024 at 15:47.
10 and 12 Dec 2024
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Fortune Green Road, Fortune Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 19 Sep 2024 at 15:08.
11 and 17 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Delamere Terrace, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 16 Sep 2024 at 15:24.
11 and 17 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Delamere Terrace, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 17:07.
11 and 17 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Delamere Terrace, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 09:06.
11 and 13 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Rostrevor Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:58.
11 and 13 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Rostrevor Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 13:51.
11 and 13 Dec 2024
City Of Westminster are proposing to carry out Highway repair and maintenance works on Ebury Street, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 13 Nov 2024 at 16:48.
11 and 21 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 10 Oct 2024 at 15:57.
11 and 21 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 16:05.
12 Dec 2024 and 31 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Uxbridge Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 13 Jun 2024 at 11:21.
13 and 15 Dec 2024
Southern Gas Networks are proposing to carry out roadworks on Chetwode Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 12:59.
13 and 15 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Chetwode Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:14.
13 and 15 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Chetwode Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 12:49.
13 and 17 Dec 2024
BT are proposing to carry out Utility asset works on Great Castle Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 1 Oct 2024 at 14:06.
13 and 15 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Alperton Lane, Perivale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 23 Oct 2024 at 12:01.
13 and 15 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Alperton Lane, Perivale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Oct 2024 at 11:18.
13 and 15 Dec 2024
Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Alperton Lane, Perivale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 13 Nov 2024 at 13:45.
13 and 17 Dec 2024
BT were proposing to carry out Utility asset works on Lower Terrace, Hampstead Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 December 2024 and run through until 17 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 22 Oct 2024 at 11:10.
15 Dec 2024 and 12 Jan 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Wren Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2024 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.
15 Dec 2024 and 12 Jan 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Frederick Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2024 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:18.
16 and 18 Dec 2024
Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Aug 2024 at 15:28.
16 and 19 Dec 2024
Thames Water were proposing to carry out New service connection on Bristol Gardens, Little Venice, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:58.
16 and 30 Dec 2024
Network Rail were proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 30 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 28 Aug 2024 at 11:07.
16 and 30 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 20 Sep 2024 at 18:04.
16 and 30 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on St Pancras Way, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 Nov 2024 at 08:52.
16 and 20 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Horseferry Road, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:31.
16 and 20 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Horseferry Road, Vincent Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 09:30.
16 and 19 Dec 2024
Thames Water were proposing to carry out New service connection on Lambeth Walk, Kennington, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Jul 2024 at 13:47.
16 and 19 Dec 2024
Thames Water are proposing to carry out New service connection on Hanbury Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:16.
16 and 19 Dec 2024
Thames Water are proposing to carry out New service connection on Hanbury Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:39.
16 and 19 Dec 2024
Thames Water were proposing to carry out New service connection on Denman Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 15:56.
17 and 19 Dec 2024
Hyperoptic were proposing to carry out Utility asset works on Grimston Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 14 Nov 2024 at 11:39.
17 Dec 2024 and 2 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 24 Sep 2024 at 14:05.
17 Dec 2024 and 2 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 27 Sep 2024 at 08:29.
17 Dec 2024 and 2 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 4 Oct 2024 at 08:46.
17 Dec 2024 and 2 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 24 Sep 2024 at 14:07.
17 Dec 2024 and 2 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 27 Sep 2024 at 08:23.
17 Dec 2024 and 2 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 1 Oct 2024 at 14:38.
17 and 21 Dec 2024
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 25 Sep 2024 at 14:35.
18 Dec 2024 and 19 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Ingrave Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:52.
18 and 20 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Surrey Lane, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 15:50.
18 and 20 Dec 2024
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Surrey Lane, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 08:35.
23 Dec 2024 and 2 Jan 2025
Thames Water were proposing to carry out New service connection on Carnwath Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 2 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Aug 2024 at 15:40.
23 and 30 Dec 2024
Thames Water were proposing to carry out New service connection on Carlyle Square, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 30 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 13:12.
23 and 30 Dec 2024
Thames Water are proposing to carry out New service connection on Carlyle Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 15:56.
23 and 31 Dec 2024
Thames Water were proposing to carry out New service connection on Bruton Place, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 08:15.
24 Dec 2024 and 9 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 10:14.
26 Dec 2024 and 10 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 11:49.
27 and 30 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Sep 2024 at 11:05.
27 and 30 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Oct 2024 at 12:00.
27 and 30 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Clapham High Street, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:01.
27 and 31 Dec 2024
BT were proposing to carry out Utility asset works on Cromwell Place, Mortlake.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 December 2024 and run through until 31 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 23 Oct 2024 at 12:03.
28 Dec 2024 and 29 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 10 Oct 2024 at 17:58.
28 Dec 2024 and 29 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Acton Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 December 2024 and could run through until 29 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 15 Oct 2024 at 13:42.
1 and 17 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Bromyard Avenue, Acton.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 January 2025 and run through until 17 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 10:14.
2 Jan and 30 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selkirk Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 07:17.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 09:59.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 13:17.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:00.
2 Jan and 27 Apr 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 27 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:17.
2 and 6 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:46.
2 and 6 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 12:51.
2 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:47.
2 and 8 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 12:50.
3 Jan and 28 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Crownstone Road, Brixton Rush Common, London.
These works are categorised as Major.
The works will start on or after 3 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Lambeth on 4 Oct 2024 at 13:01.
3 and 5 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Clapham High Street, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 5 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 12:01.
4 and 6 Jan 2025
Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Tooting High Street, Tooting, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 January 2025 and run through until 6 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 10:54.
4 and 6 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tooting High Street, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 11:03.
4 and 6 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Mitcham Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 11:03.
4 and 6 Jan 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Garratt Lane, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 11:03.
4 and 12 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 14:12.
6 and 16 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Haydon Park Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 14 Nov 2024 at 15:46.
6 and 16 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Haydon Park Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 18 Nov 2024 at 08:10.
6 and 16 Jan 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Haydon Park Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 18 Nov 2024 at 14:45.
6 Jan and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 May 2024 at 08:52.
6 Jan and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Aug 2024 at 10:25.
6 Jan and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.
These works are categorised as Major.
The works will start on or after 6 January 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2024 at 08:42.
6 Jan and 23 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Penwith Road, Southfields, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 23 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:07.
6 Jan and 2 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 2 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:08.
6 Jan and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Apr 2024 at 13:46.
6 and 10 Jan 2025
Thames Water are proposing to carry out Utility asset works on Richmond Road, Twickenham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 14:45.
6 and 8 Jan 2025
Thames Water are proposing to carry out New service connection on Cottage Grove, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:52.
6 and 31 Jan 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Pagoda Avenue, Richmond.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Sep 2024 at 13:11.
6 and 24 Jan 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 12:50.
6 and 24 Jan 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:05.
6 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 08:15.
6 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 08:29.
6 and 17 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 10:56.
6 and 19 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Petley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2024 at 14:26.
6 and 19 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Petley Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:43.
6 Jan and 4 Apr 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Warwick Way, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 28 Nov 2024 at 14:34.
6 Jan and 31 May 2025
Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 17:29.
6 and 31 Jan 2025
Stark Infra – Electric are proposing to carry out Utility asset works on Ebury Street, Warwick, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Stark Infra – Electric on 11 Nov 2024 at 12:12.
6 and 10 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Alexander Place, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 14:05.
6 Jan and 15 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Great College Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 15 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 13:01.
6 Jan and 15 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:42.
6 Jan and 28 Feb 2025
Thames Water are proposing to carry out Utility asset works on Pont Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 15:16.
6 Jan and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Storey's Gate, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.
6 and 20 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Parliament Square, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 13:51.
6 Jan and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Matthew Parker Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.
6 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Gray Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:14.
6 Jan and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 12:15.
6 Jan and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 15:28.
6 Jan and 30 Jun 2025
London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by London Borough Of Lambeth on 11 Sep 2024 at 09:49.
6 and 9 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Half Moon Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 1 Oct 2024 at 11:13.
6 and 9 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Half Moon Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 8 Oct 2024 at 08:33.
6 and 10 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Northumberland Avenue, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 13 Nov 2024 at 09:34.
6 and 26 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Kensington Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 16:13.
6 and 10 Jan 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on South Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Oct 2024 at 11:42.
6 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Hillgate Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Oct 2024 at 09:48.
6 and 26 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Notting Hill Gate, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 16:09.
6 and 26 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Kensington Church Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 14:22.
6 and 26 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Notting Hill Gate, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 16:23.
6 and 26 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Notting Hill Gate, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 11:47.
6 and 20 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Jermyn Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 16 Oct 2024 at 07:22.
6 and 9 Jan 2025
Thames Water were proposing to carry out New service connection on South Audley Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 9 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 16:05.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 09:50.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 13:52.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Bruton Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:51.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Bruton Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 08:54.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:18.
6 and 10 Jan 2025
Thames Water are proposing to carry out Permanent reinstatement on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 06:10.
6 and 15 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Charing Cross Road, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 1 Nov 2024 at 08:15.
6 and 15 Jan 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 15 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 3 Oct 2024 at 10:02.
6 and 15 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 10:09.
6 and 15 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Chapel Side, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 11:26.
6 and 8 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Strand, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 6 Nov 2024 at 08:33.
6 Jan and 9 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Bomore Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 10:31.
6 Jan and 9 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Bomore Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 14:22.
6 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Old Compton Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 14:13.
6 and 22 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Old Compton Street, West End, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:54.
6 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Frith Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 14:10.
6 and 22 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Frith Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 14:26.
6 and 22 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Frith Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 10:46.
6 and 10 Jan 2025
Thames Water are proposing to carry out New service connection on North Audley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:38.
6 and 24 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Walmer Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:22.
6 and 8 Jan 2025
Virgin Media were proposing to carry out Utility asset works on New Bond Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 24 Sep 2024 at 10:15.
6 and 8 Jan 2025
Virgin Media were proposing to carry out Utility asset works on New Bond Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 26 Sep 2024 at 14:14.
6 Jan and 6 Mar 2025
Murphy Power Distribution were proposing to carry out Utility asset works on Great Chapel Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 6 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 7 Oct 2024 at 09:12.
6 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Henrietta Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 9 Oct 2024 at 13:28.
6 and 24 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Henrietta Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 12:21.
6 Jan and 17 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Upper Berkeley Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 16:24.
6 Jan and 17 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Upper Berkeley Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:50.
6 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Wimpole Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Aug 2024 at 17:47.
6 and 9 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Great Castle Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 10 Oct 2024 at 09:31.
6 and 9 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Great Castle Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 23 Oct 2024 at 08:11.
6 Jan and 21 Mar 2025
City Of Westminster are proposing to carry out Highway improvement works on Great Titchfield Street, West End, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 21 Nov 2024 at 12:28.
6 Jan and 21 Mar 2025
City Of Westminster are proposing to carry out Highway improvement works on Great Titchfield Street, West End, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 22 Nov 2024 at 13:04.
6 Jan and 21 Mar 2025
City Of Westminster are proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 21 Nov 2024 at 12:17.
6 Jan and 21 Mar 2025
City Of Westminster are proposing to carry out Highway improvement works on Great Portland Street, West End, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 22 Nov 2024 at 13:04.
6 Jan and 9 Feb 2025
Thames Water are proposing to carry out Utility asset works on Paddington Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 17:02.
6 Jan and 1 May 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 13:50.
6 Jan and 1 May 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 28 Oct 2024 at 20:10.
6 and 10 Jan 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:07.
6 and 10 Jan 2025
Thames Water were proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:52.
6 and 10 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Broadley Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 10:07.
6 and 27 Jan 2025
Thames Water are proposing to carry out Utility asset works on Devonshire Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 19:15.
6 and 27 Jan 2025
Thames Water are proposing to carry out Utility asset works on Devonshire Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 15:10.
6 Jan and 17 Feb 2025
Thames Water are proposing to carry out Utility asset works on Harley Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 12:57.
6 and 8 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Howland Street, Bloomsbury, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 19 Sep 2024 at 09:04.
6 and 26 Jan 2025
Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Sep 2024 at 10:04.
6 and 27 Jan 2025
Thames Water were proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:03.
6 and 27 Jan 2025
Thames Water were proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:45.
6 and 27 Jan 2025
Thames Water are proposing to carry out Utility asset works on Portland Place, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 15:59.
6 Jan and 9 Feb 2025
Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:35.
6 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Disconnection or alteration of supply on Mount Pleasant, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Sep 2024 at 18:12.
6 Jan and 1 May 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Roger Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.
6 Jan and 1 May 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Roger Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 13:57.
6 and 9 Jan 2025
Thames Water are proposing to carry out New service connection on Bristol Gardens, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:15.
6 Jan and 25 Mar 2025
Thames Water are proposing to carry out Utility asset works on Bristol Gardens, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:19.
6 Jan and 25 Mar 2025
Thames Water are proposing to carry out Utility asset works on Bristol Gardens, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 08:58.
6 and 11 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Maida Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:20.
6 Jan and 16 Feb 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:19.
6 Jan and 16 Feb 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 12:53.
6 and 10 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 19:07.
6 Jan and 1 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 22 Oct 2024 at 13:49.
6 Jan and 1 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 28 Oct 2024 at 20:06.
6 and 15 Jan 2025
G. Network Communications are proposing to carry out Remedial works on Randolph Avenue, Maida Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 9 Oct 2024 at 09:07.
6 Jan and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 21:52.
6 Jan and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on King's Cross Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 16:06.
6 Jan and 2 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Northdown Street, Islington, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 11:24.
6 and 10 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Tolhurst Drive, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 17:09.
6 and 10 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Tolhurst Drive, Regent's Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 21 Nov 2024 at 12:39.
6 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility asset works on Circus Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:06.
6 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility asset works on Circus Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:22.
6 Jan and 13 Apr 2025
Thames Water are proposing to carry out Utility asset works on Wellington Road, Regent's Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 12:25.
6 Jan and 13 Apr 2025
Thames Water are proposing to carry out Utility asset works on Wellington Road, Regent's Park, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:59.
6 and 26 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Goods Way, St Pancras And Somers Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 13 Nov 2024 at 08:38.
6 Jan and 2 Mar 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Sep 2024 at 11:30.
6 Jan and 2 Mar 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, Park Royal.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:39.
6 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Waverley Place, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:05.
6 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Waverley Place, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 13:45.
6 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility asset works on Finchley Place, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:05.
6 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility asset works on Finchley Place, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 13:13.
6 Jan and 21 Apr 2025
Thames Water are proposing to carry out Utility asset works on Willesden Lane, Willesden, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 07:50.
6 Jan and 10 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balmoral Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:51.
6 and 9 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Holly Walk, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Sep 2024 at 08:46.
7 and 9 Jan 2025
Thames Water are proposing to carry out Utility asset works on Beaufort Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:26.
7 and 30 Jan 2025
Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 13:08.
7 and 30 Jan 2025
Transport for London (TfL) are proposing to carry out Section 50 on Euston Road, King's Cross, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 10:32.
7 and 9 Jan 2025
BT are proposing to carry out Utility asset works on Mullins Path, Mortlake.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 8 Oct 2024 at 10:07.
7 and 9 Jan 2025
Virgin Media are proposing to carry out Utility asset works on Kensington Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 13 Sep 2024 at 15:45.
8 and 10 Jan 2025
Hyperoptic are proposing to carry out Utility asset works on Hestercombe Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 11 Nov 2024 at 11:58.
8 and 10 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Trafalgar Square, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Oct 2024 at 07:59.
8 and 11 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Trafalgar Square, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 7 Nov 2024 at 06:16.
8 and 21 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Goldhurst Terrace, Swiss Cottage, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 14:45.
9 Jan and 12 Feb 2025
Thames Water are proposing to carry out Utility asset works on Chiltern Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:05.
9 Jan and 12 Feb 2025
Thames Water are proposing to carry out Utility asset works on Paddington Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 13:43.
9 Jan and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkgate Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 10:42.
9 Jan and 3 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westbridge Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 14:36.
9 Jan and 26 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Gardens, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 16:15.
9 Jan and 26 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Fawcett Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 16:39.
9 Jan and 26 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tregunter Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 16:39.
9 Jan and 26 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 16:27.
9 and 15 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Coventry Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 4 Nov 2024 at 10:06.
9 and 24 Jan 2025
T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Kensington Park Gardens, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by T-Mobile (UK) on 28 Nov 2024 at 10:17.
9 and 29 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Dean Street, West End, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 14:23.
9 and 24 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Dean Street, West End, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:51.
10 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Emerald Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Sep 2024 at 18:02.
11 and 19 Jan 2025
Thames Water are proposing to carry out New service connection on Clapham Park Road, Clapham East, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 13:14.
11 and 19 Jan 2025
Thames Water are proposing to carry out New service connection on Clapham Park Road, Clapham East, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 12:27.
11 and 19 Jan 2025
Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:39.
11 and 19 Jan 2025
Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:17.
11 and 19 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 14 Oct 2024 at 13:55.
11 and 19 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 3 Oct 2024 at 08:37.
11 and 19 Jan 2025
ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by ESP Electricity on 3 Oct 2024 at 11:42.
13 and 26 Jan 2025
Thames Water are proposing to carry out roadworks on Brudenell Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:35.
13 and 26 Jan 2025
Thames Water are proposing to carry out roadworks on Beechcroft Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:29.
13 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Culvert Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 10:25.
13 and 31 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 8 Oct 2024 at 08:39.
13 Jan and 1 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 22 Oct 2024 at 14:41.
13 Jan and 1 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 24 Oct 2024 at 08:23.
13 and 15 Jan 2025
Hyperoptic were proposing to carry out Utility asset works on Rostrevor Mews, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 20 Nov 2024 at 10:26.
13 and 15 Jan 2025
Hyperoptic were proposing to carry out Utility asset works on Rostrevor Mews, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 29 Nov 2024 at 11:41.
13 and 15 Jan 2025
Hyperoptic are proposing to carry out Utility asset works on Rostrevor Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 29 Nov 2024 at 11:44.
13 and 17 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 6 Nov 2024 at 09:41.
13 and 17 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on North Road, Kew.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 27 Nov 2024 at 10:06.
13 and 15 Jan 2025
Cadent Gas were proposing to carry out Disconnection or alteration of supply on Smith Terrace, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:59.
13 and 17 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wellington Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 16:42.
13 and 15 Jan 2025
Hyperoptic are proposing to carry out Utility asset works on Gerald Road, Knightsbridge & Belgravia, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 24 Oct 2024 at 14:49.
13 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Fenelon Place, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 12:32.
13 and 15 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Margaret Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 1 Nov 2024 at 08:39.
13 Jan and 14 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 22 Oct 2024 at 09:28.
13 Jan and 14 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 20 Nov 2024 at 10:19.
13 Jan and 14 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 09:14.
13 Jan and 14 Mar 2025
City Of Westminster were proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 25 Sep 2024 at 11:13.
13 and 17 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on South Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 11:20.
13 and 17 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on South Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:33.
13 and 27 Jan 2025
Thames Water were proposing to carry out Highway improvement works on Sackville Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Oct 2024 at 10:24.
13 and 27 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Jermyn Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 08:19.
13 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Oct 2024 at 09:47.
13 and 28 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 08:00.
13 Jan and 9 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Grenfell Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:29.
13 Jan and 3 Jun 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on St Anselm's Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 9 Sep 2024 at 15:44.
13 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on North Audley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:32.
13 Jan and 9 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Walmer Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 16:29.
13 and 15 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 21 Nov 2024 at 10:08.
13 and 17 Jan 2025
Vorboss are proposing to carry out Utility repair and maintenance works on Long Acre, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Vorboss on 17 Oct 2024 at 08:13.
13 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Old Quebec Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 14:13.
13 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 14:07.
13 and 18 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Shoe Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 10:22.
13 and 20 Jan 2025
Thames Water were proposing to carry out Works for road purposes on Great Cumberland Place, Bryanston & Dorset Square, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 11:37.
13 and 15 Jan 2025
G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by G. Network Communications on 26 Nov 2024 at 11:29.
13 Jan and 16 Feb 2025
Thames Water are proposing to carry out Utility asset works on Chiltern Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:30.
13 and 24 Jan 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Devonshire Row Mews, Marylebone High Street, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 13:42.
13 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Frampton Street, Church Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:16.
13 and 24 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lisson Grove, Church Street, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:07.
13 and 16 Jan 2025
Thames Water are proposing to carry out New service connection on Hamilton Terrace, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 14:34.
13 and 31 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Avenue, Maida Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 21 Oct 2024 at 15:27.
13 and 21 Jan 2025
Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:36.
13 and 21 Jan 2025
Thames Water are proposing to carry out New service connection on Dudden Hill Lane, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Nov 2024 at 07:31.
14 and 17 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Sutherland Avenue, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 19:08.
14 Jan and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Ingrave Street, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 14:03.
14 and 20 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bessborough Street, Tachbrook, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 5 Nov 2024 at 09:12.
14 Jan and 28 Feb 2025
Murphy Power Distribution were proposing to carry out Utility asset works on Great Chapel Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Murphy Power Distribution on 9 Oct 2024 at 15:35.
15 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Drayson Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 12:04.
15 and 17 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Westbourne Terrace, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 28 Nov 2024 at 15:34.
15 Jan and 16 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Portman Square, Marylebone High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 16 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 19:25.
15 Jan and 11 Feb 2025
G2 Energy IDNO are proposing to carry out Utility asset works on Oak Tree Road, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by G2 Energy IDNO on 28 Nov 2024 at 08:50.
16 and 22 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Rootes Drive, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:37.
17 and 20 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 24 Jun 2024 at 13:27.
17 and 20 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 09:13.
17 and 20 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Piccadilly Underpass, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 12:11.
17 and 25 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Marshall Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 13:26.
18 Jan 2025
Telefonica UK are proposing to carry out Utility asset works on Gower Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 18 January 2025 and are due to last for only one day. The works will impact the footway and carriageway.
This roadwork event was last updated by Telefonica UK on 15 Nov 2024 at 18:12.
20 and 27 Jan 2025
Thames Water are proposing to carry out New service connection on Morwell Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 16:57.
20 Jan and 4 Feb 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on North Wharf Road, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 22 Nov 2024 at 14:30.
20 and 28 Jan 2025
Thames Water are proposing to carry out New service connection on Luxborough Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 07:58.
20 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Swiss Cottage, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Nov 2024 at 14:02.
20 and 24 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Adelaide Road, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 18:35.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Pilgrim's Lane, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:16.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Pilgrim's Lane, Hampstead Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 12:54.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Garratt Lane, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 11:59.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Sangora Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 12:08.
20 and 22 Jan 2025
Hyperoptic are proposing to carry out Utility asset works on Grimston Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Hyperoptic on 26 Nov 2024 at 14:55.
20 and 31 Jan 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Peterborough Mews, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 11:31.
20 Jan and 10 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Peterborough Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 11:40.
20 Jan and 10 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Peterborough Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 10:57.
20 Jan and 12 Mar 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkgate Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 13:59.
20 Jan and 26 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westbridge Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 15:43.
20 and 28 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Wilfred Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 07:00.
20 and 28 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Catherine Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 06:59.
20 and 28 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 06:59.
20 and 28 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 07:00.
20 and 28 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 26 Nov 2024 at 16:59.
20 Jan and 9 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Fletcher Road, Chiswick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Sep 2024 at 14:07.
20 and 22 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Colombo Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 13:22.
20 Jan and 3 Feb 2025
Thames Water are proposing to carry out Highway improvement works on Sackville Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 09:35.
20 Jan and 7 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Vine Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Sep 2024 at 06:43.
20 and 22 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Savoy Hill, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 14:28.
20 and 22 Jan 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Savoy Way, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Nov 2024 at 14:27.
20 and 23 Jan 2025
Thames Water are proposing to carry out New service connection on South Audley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 09:25.
20 and 23 Jan 2025
Thames Water are proposing to carry out New service connection on South Audley Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 09:38.
20 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Oct 2024 at 09:17.
20 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Leinster Terrace, Lancaster Gate, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Oct 2024 at 12:28.
20 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Creffield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:10.
20 Jan and 2 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Creffield Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 12:14.
20 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Longfield Avenue, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 16:25.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Pollen Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:03.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Pollen Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 09:17.
20 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on D'arblay Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:52.
20 and 24 Jan 2025
Thames Water were proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:23.
20 and 24 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Little Portland Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:43.
21 and 24 Jan 2025
Thames Water are proposing to carry out Utility asset works on Holbein Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 10:40.
21 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Parliament Square, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 09:36.
21 Jan and 10 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Vine Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 1 Oct 2024 at 13:38.
21 Jan and 5 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Vine Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 10:51.
22 Jan and 5 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 11:40.
22 Jan and 4 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Grosvenor Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 10:41.
22 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Grosvenor Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 14:53.
22 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Grosvenor Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 10:06.
22 and 31 Jan 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Grosvenor Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 13:02.
22 Jan and 12 Feb 2025
Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 10:06.
23 Jan and 9 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Grenfell Road, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 13:12.
23 and 25 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Regent Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 06:26.
24 and 26 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Gray's Inn Road, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 10:49.
25 Jan and 3 Feb 2025
National Highways were proposing to carry out Utility repair and maintenance works on Chalk Farm Road, Camden Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 January 2025 and run through until 3 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by National Highways on 11 Nov 2024 at 15:14.
25 and 27 Jan 2025
Network Rail were proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 12 Nov 2024 at 14:38.
25 and 27 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 12 Nov 2024 at 14:40.
25 Jan and 3 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Rosebery Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 14:24.
26 Jan and 28 Oct 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 January 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 08:01.
27 Jan and 3 Feb 2025
Thames Water are proposing to carry out New service connection on Maybury Street, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 07:38.
27 Jan and 3 Feb 2025
Thames Water are proposing to carry out New service connection on Maybury Street, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:12.
27 and 31 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Albert Road, Richmond.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 14:21.
27 Jan and 5 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Diversionary works on Old York Road, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 14:32.
27 and 29 Jan 2025
London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Penton Place, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 28 Nov 2024 at 15:11.
27 and 29 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Sail Street, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 29 Oct 2024 at 07:25.
27 Jan and 4 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Aug 2024 at 06:23.
27 Jan and 13 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Abbey Orchard Street, St James's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 07:32.
27 Jan and 13 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Great Smith Street, St James's, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 07:31.
27 Jan and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Whitehall, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 08:31.
27 Jan and 11 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 08:12.
27 Jan and 11 Feb 2025
UK Power Networks Eastern & London were proposing to carry out New service connection on Maiden Lane, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 11 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 08:29.
27 Jan and 11 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Maiden Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 14:38.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 17 Oct 2024 at 14:04.
27 and 30 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Brewer Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 06:49.
27 and 30 Jan 2025
City Of London Telecomms were proposing to carry out Utility asset works on Brewer Street, West End, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 16 Oct 2024 at 09:32.
27 and 30 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Wardour Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 06:49.
27 Jan and 1 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Lexington Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 08:16.
27 and 30 Jan 2025
Vodafone are proposing to carry out Highway repair and maintenance works on Binney Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Vodafone on 23 Oct 2024 at 13:55.
27 and 31 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Manette Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 14:53.
27 and 31 Jan 2025
City Of London Telecomms are proposing to carry out Utility asset works on Manette Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by City Of London Telecomms on 5 Nov 2024 at 10:51.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Eastbourne Terrace, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:04.
27 and 31 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Thayer Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:21.
27 and 29 Jan 2025
G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by G. Network Communications on 25 Oct 2024 at 17:31.
27 and 29 Jan 2025
G. Network Communications are proposing to carry out Utility asset works on Gloucester Place, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by G. Network Communications on 4 Nov 2024 at 09:40.
27 Jan and 16 Feb 2025
Thames Water are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 16 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:28.
27 Jan and 23 Feb 2025
Thames Water are proposing to carry out Utility asset works on Tottenham Court Road, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 18:14.
27 Jan and 23 Feb 2025
Thames Water are proposing to carry out Utility asset works on Tottenham Court Road, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Oct 2024 at 08:13.
27 and 30 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Kentish Town Road, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 17:00.
27 Jan and 21 Apr 2025
Thames Water are proposing to carry out Utility asset works on Willesden Lane, Willesden, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 20:53.
28 Jan and 31 Dec 2025
London Borough Of Camden are proposing to carry out Highway repair and maintenance works on Queen's Crescent, Haverstock, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 December 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by London Borough Of Camden on 11 Nov 2024 at 14:09.
28 Jan and 3 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thorncliffe Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 14:25.
28 Jan and 3 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thornbury Road, Clapham Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 14:24.
28 Jan and 30 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beaufort Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 13:50.
30 Jan and 24 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bruton Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 14:59.
30 Jan and 12 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Cleveland Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 10:55.
31 Jan and 1 Apr 2025
Thames Water are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 1 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 09:35.
31 Jan and 1 Apr 2025
Thames Water are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 1 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 08:41.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:01.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:15.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:06.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:17.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:51.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Horseferry Road, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 11:15.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Horseferry Road, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2024 at 12:17.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 15:06.
1 Feb and 2 Oct 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 09:45.
1 and 22 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bridge Street, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 11:26.
1 and 3 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Chalk Farm Road, Camden Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 February 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 12 Nov 2024 at 16:13.
3 and 7 Feb 2025
Thames Water are proposing to carry out New service connection on Blandford Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 08:40.
3 and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Tottenham Street, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 20:30.
3 and 14 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Chenies Mews, Bloomsbury, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 15:16.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Southam Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 24 Oct 2024 at 11:26.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Southam Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.
3 and 7 Feb 2025
Thames Water are proposing to carry out New service connection on Doughty Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 17:20.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Adair Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Adair Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 1 Nov 2024 at 15:04.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Golborne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 30 Oct 2024 at 10:10.
3 and 7 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 1 Nov 2024 at 15:04.
3 and 5 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Kensal Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 4 Nov 2024 at 15:13.
3 and 24 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Hall Road, Regent's Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 15:24.
3 and 14 Feb 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Mews South, Maida Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 27 Sep 2024 at 15:36.
3 and 14 Feb 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Elgin Mews South, Maida Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 5 Nov 2024 at 10:47.
3 Feb and 3 Apr 2025
Thames Water are proposing to carry out Utility asset works on Grove End Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:06.
3 Feb and 3 Apr 2025
Thames Water are proposing to carry out Utility asset works on Grove End Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:22.
3 Feb and 8 May 2025
Thames Water are proposing to carry out Utility asset works on Acacia Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:06.
3 Feb and 8 May 2025
Thames Water are proposing to carry out Utility asset works on Acacia Road, Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 8 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:38.
3 and 17 Feb 2025
UK Power Networks Eastern & London were proposing to carry out Disconnection or alteration of supply on Maida Vale, Maida Vale, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 17 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 15:58.
3 Feb and 18 May 2025
Thames Water were proposing to carry out Utility asset works on Finchley Road, Abbey Road, London.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 18 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 13:01.
3 Feb and 18 May 2025
Thames Water are proposing to carry out Utility asset works on Finchley Road, Abbey Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 12:25.
3 Feb and 18 May 2025
Thames Water are proposing to carry out Utility asset works on Finchley Road, Abbey Road, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 15:00.
3 Feb and 4 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 10:48.
3 Feb and 4 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 13:36.
3 Feb and 4 Mar 2025
UK Power Networks Eastern & London were proposing to carry out Utility asset works on Finchley Road, Frognal And Fitzjohns, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 4 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 15:10.
3 Feb and 27 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 07:57.
3 Feb and 27 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 07:02.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kingston Road, Roehampton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 13:41.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Kingston Road, Roehampton, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:01.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Hill, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 13:40.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Hill, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 09:58.
3 and 10 Feb 2025
Thames Water are proposing to carry out New service connection on Camborne Road, Southfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 08:53.
3 and 5 Feb 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wandsworth High Street, Wandsworth, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 10:26.
3 and 9 Feb 2025
Thames Water are proposing to carry out New service connection on Castelnau, Barnes.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:42.
3 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Ebury Bridge Road, Churchill, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:00.
3 and 7 Feb 2025
Thames Water are proposing to carry out New service connection on Kilmarsh Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 13:54.
3 and 7 Feb 2025
Thames Water are proposing to carry out New service connection on Kilmarsh Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:12.
3 Feb and 23 May 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Pall Mall, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of Westminster on 13 Nov 2024 at 09:37.
3 and 22 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coventry Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 14 Nov 2024 at 08:36.
3 and 22 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Coventry Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Nov 2024 at 18:30.
3 and 5 Feb 2025
G. Network Communications are proposing to carry out Utility asset works on Denman Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 20 Nov 2024 at 14:37.
3 Feb and 8 Mar 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Lexington Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 06:47.
4 and 17 Feb 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Ledbury Road, Bayswater, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 29 Nov 2024 at 15:21.
4 and 6 Feb 2025
Thames Water are proposing to carry out Utility asset works on Harrow Road, Westbourne, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:14.
4 and 6 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Belsize Road, Kilburn, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 17:44.
5 and 10 Feb 2025
Virgin Media are proposing to carry out Utility asset works on Coptic Street, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 11 Nov 2024 at 14:14.
5 and 7 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Shepherd's Bush Green, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 10:35.
5 and 11 Feb 2025
Thames Water are proposing to carry out New service connection on Exeter Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 07:35.
5 and 11 Feb 2025
Thames Water are proposing to carry out New service connection on Exeter Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 10:04.
6 and 11 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Union Road, Stockwell West & Larkhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 1 Nov 2024 at 08:28.
6 Feb and 17 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Fitzhardinge Street, Marylebone High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 11:02.
7 Feb and 28 Apr 2025
Transport for London (TfL) are proposing to carry out roadworks on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 5 Jul 2024 at 16:26.
7 Feb and 28 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:40.
7 Feb and 28 Apr 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Aug 2024 at 11:10.
8 Feb and 16 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lower Sloane Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 16:00.
8 Feb and 17 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hinde Street, Marylebone High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 10:51.
9 Feb and 13 Mar 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on Park Royal Road, Acton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 8 Aug 2024 at 09:49.
10 and 13 Feb 2025
Lumen Technologies are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lumen Technologies on 26 Nov 2024 at 19:20.
10 and 14 Feb 2025
Thames Water are proposing to carry out New service connection on Berners Mews, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 10:49.
10 and 17 Feb 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on North Wharf Road, Hyde Park, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 7 Nov 2024 at 11:19.
10 and 13 Feb 2025
Thames Water are proposing to carry out New service connection on Bristol Gardens, Little Venice, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Oct 2024 at 17:26.
10 Feb and 4 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selkirk Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 4 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:01.
10 Feb and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balham Park Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 May 2024 at 06:16.
10 Feb and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balham Park Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Aug 2024 at 13:00.
10 Feb and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balham Park Road, Balham, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Sep 2024 at 11:24.
10 Feb and 23 Mar 2025
Thames Water were proposing to carry out Utility asset works on Balham Park Road, Balham, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 23 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 15:07.
10 Feb and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 May 2024 at 16:52.
10 and 12 Feb 2025
Thames Water are proposing to carry out Utility asset works on Elborough Street, Southfields, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 08:17.
10 and 14 Feb 2025
Thames Water are proposing to carry out Highway improvement works on Mendip Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 08:21.
10 and 14 Feb 2025
Thames Water are proposing to carry out Highway improvement works on Chatfield Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Oct 2024 at 08:24.
10 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on St Dionis Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:52.
10 and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on St Dionis Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 14:19.
10 Feb and 4 May 2025
Cadent Gas are proposing to carry out Utility asset works on Sloane Square, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 4 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Nov 2024 at 16:30.
10 Feb and 14 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Pelham Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:23.
10 and 14 Feb 2025
Hyperoptic are proposing to carry out Utility asset works on Chadwick Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 21 Nov 2024 at 14:19.
10 and 12 Feb 2025
Virgin Media were proposing to carry out Utility asset works on Yeoman's Row, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 11 Nov 2024 at 14:32.
10 and 22 Feb 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Horse Guards Avenue, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 08:31.
10 Feb and 28 Apr 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on White Horse Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 23 Oct 2024 at 08:42.
10 and 14 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Prices Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 12:22.
10 and 14 Feb 2025
London Borough Of Southwark are proposing to carry out Highway improvement works on Prices Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 12:22.
10 and 12 Feb 2025
G. Network Communications are proposing to carry out Utility asset works on Brewer Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 20 Nov 2024 at 15:10.
10 and 13 Feb 2025
G. Network Communications are proposing to carry out Utility asset works on Brewer Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 27 Nov 2024 at 11:32.
10 and 13 Feb 2025
G. Network Communications are proposing to carry out Utility asset works on Brewer Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by G. Network Communications on 27 Nov 2024 at 15:25.
10 and 14 Feb 2025
Cadent Gas were proposing to carry out Remedial works on Mercer Street, St James's, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 08:48.
10 and 14 Feb 2025
Cadent Gas are proposing to carry out Remedial works on Mercer Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 08:33.
10 and 15 Feb 2025
Thames Water are proposing to carry out New service connection on St George Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:53.
10 and 15 Feb 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Princes Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 15 Nov 2024 at 14:48.
10 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Henrietta Place, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 06:42.
10 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Wimpole Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Oct 2024 at 14:54.
10 and 19 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Portman Square, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 18:24.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Cambridge Street, Warwick, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 07:53.
12 and 17 Feb 2025
Thames Water are proposing to carry out New service connection on Old Paradise Street, Waterloo & Southbank, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Oct 2024 at 12:04.
12 and 14 Feb 2025
BT are proposing to carry out Utility asset works on Rysbrack Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 12 Nov 2024 at 11:54.
13 Feb and 23 Apr 2025
UK Power Networks Eastern & London are proposing to carry out Utility asset works on Falcon Road, Battersea, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:51.
14 and 17 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 12:46.
15 and 23 Feb 2025
City Of London Telecomms are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 4 Nov 2024 at 09:46.
15 and 23 Feb 2025
City Of London Telecomms are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by City Of London Telecomms on 25 Nov 2024 at 13:11.
15 and 24 Feb 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Hawkins Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 15 Oct 2024 at 11:10.
15 and 24 Feb 2025
London Borough Of Brent are proposing to carry out Highway repair and maintenance works on Bridge Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Brent on 23 Oct 2024 at 09:07.
15 Feb and 1 Mar 2025
Thames Water are proposing to carry out roadworks on Dafforne Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:30.
15 Feb and 1 Mar 2025
Thames Water are proposing to carry out roadworks on Stapleton Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:33.
15 Feb and 17 Mar 2025
Thames Water are proposing to carry out Utility asset works on Upper Tooting Road, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:32.
15 Feb and 17 Mar 2025
Thames Water are proposing to carry out Utility asset works on Upper Tooting Road, Tooting, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 09:48.
15 Feb and 23 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lonsdale Road, Barnes.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 11:57.
15 and 25 Feb 2025
London Borough Of Ealing are proposing to carry out Highway improvement works on York Road, Ealing.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Ealing on 14 Oct 2024 at 11:31.
16 Feb and 1 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 8 Oct 2024 at 16:20.
16 Feb and 1 Jul 2025
London Borough Of Camden are proposing to carry out Highway improvement works on Harrison Street, King's Cross, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 February 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Camden on 14 Oct 2024 at 12:54.
17 Feb and 19 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Westway, Harrow Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:40.
17 and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Carburton Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Nov 2024 at 12:23.
17 and 21 Feb 2025
Thames Water are proposing to carry out Utility asset works on Carburton Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 10:40.
17 Feb and 8 Mar 2025
Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 13:58.
17 Feb and 8 Mar 2025
Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 12:58.
17 Feb and 8 Mar 2025
Thames Water are proposing to carry out Utility asset works on Marylebone Road, Marylebone High Street, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 8 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 17:55.
17 Feb and 31 Mar 2025
Thames Water are proposing to carry out Utility asset works on Park Crescent Mews West, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 16:00.
17 Feb and 31 Mar 2025
Thames Water are proposing to carry out Utility asset works on Park Crescent Mews West, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 12:55.
17 and 27 Feb 2025
Thames Water are proposing to carry out Utility asset works on Andover Place, Maida Vale, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 19:19.
17 Feb and 24 Mar 2025
Thames Water are proposing to carry out Statutory Infrastructure Works on Twyford Abbey Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:01.
17 Feb and 7 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Finchley Road, Frognal And Fitzjohns, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 12:20.
17 and 20 Feb 2025
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Burntwood Lane, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 21 Nov 2024 at 10:04.
17 and 19 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Beechcroft Road, Tooting, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 12:49.
17 Feb and 6 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Algarve Road, Earlsfield, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Jun 2024 at 08:44.
17 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bellamy Street, Balham, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 16:01.
17 and 19 Feb 2025
London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Harbut Road, Battersea, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Wandsworth on 20 Nov 2024 at 15:41.
17 and 21 Feb 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Clancarty Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 5 Nov 2024 at 09:05.
17 and 21 Feb 2025
London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Clancarty Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 13 Nov 2024 at 09:57.
17 and 19 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on Lots Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 11 Jun 2024 at 09:01.
17 and 19 Feb 2025
Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on Upcerne Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 25 Apr 2024 at 05:56.
17 and 25 Feb 2025
Thames Water are proposing to carry out New service connection on Jonathan Street, Vauxhall, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:16.
17 Feb and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ebury Bridge, Churchill, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 10:30.
17 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Carville Crescent, Brentford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 13:37.
17 Feb and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Victoria Street, St James's, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.
17 Feb and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:43.
17 Feb and 12 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Tothill Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:43.
17 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on Pitt Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 15:43.
17 and 28 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Kensington Place, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 08:31.
17 and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Rupert Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 15:25.
17 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Rupert Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 11:00.
17 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Gerrard Place, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 16:30.
17 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Hopkins Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 14:15.
17 and 21 Feb 2025
Thames Water are proposing to carry out New service connection on St George Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 11:40.
17 Feb and 19 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:40.
17 Feb and 31 Mar 2025
Thames Water are proposing to carry out Utility asset works on Berkeley Mews, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 13 Aug 2024 at 16:23.
17 Feb and 31 Mar 2025
Thames Water are proposing to carry out Utility asset works on Berkeley Mews, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:22.
18 and 28 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Kingsley Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 13 Nov 2024 at 08:05.
18 and 28 Feb 2025
London Borough Of Merton are proposing to carry out Highway improvement works on Kingsley Road, Wimbledon, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Merton on 13 Nov 2024 at 14:40.
18 Feb and 3 Mar 2025
Hyperoptic are proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 19 Nov 2024 at 08:35.
18 and 22 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 22 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 15:16.
18 and 22 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Nov 2024 at 08:07.
18 and 24 Feb 2025
Thames Water are proposing to carry out New service connection on Upper Berkeley Street, Bryanston & Dorset Square, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 15:11.
18 and 24 Feb 2025
Thames Water were proposing to carry out Utility asset works on Upper Berkeley Street, Bryanston & Dorset Square, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 24 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 27 Nov 2024 at 10:40.
18 Feb and 4 Mar 2025
Virgin Media are proposing to carry out Utility asset works on Queen Square, Holborn And Covent Garden, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 19 Nov 2024 at 18:09.
18 and 20 Feb 2025
Vodafone are proposing to carry out Remedial works on Caple Road, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 11 Nov 2024 at 16:25.
19 and 23 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Clapham Crescent, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 31 Oct 2024 at 11:57.
19 and 23 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Clapham Crescent, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 31 Oct 2024 at 10:55.
19 and 23 Feb 2025
London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Triangle Place, Clapham East, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Lambeth on 31 Oct 2024 at 11:58.
19 Feb and 25 Jun 2025
Thames Water are proposing to carry out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 25 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 25 Nov 2024 at 10:22.
19 Feb and 30 Apr 2025
Thames Water are proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 30 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Nov 2024 at 16:16.
19 Feb and 7 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 5 Nov 2024 at 14:18.
19 Feb and 7 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 7 Nov 2024 at 11:18.
19 Feb and 7 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 31 Oct 2024 at 16:07.
19 Feb and 7 Mar 2025
City Of Westminster are proposing to carry out Highway repair and maintenance works on Bayswater Road, Knightsbridge & Belgravia, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by City Of Westminster on 5 Nov 2024 at 14:27.
20 Feb and 12 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 12 May 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:25.
20 Feb and 12 May 2025
Transport for London (TfL) were proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 February 2025 and run through until 12 May 2025. The works were due to impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:42.
20 Feb and 12 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 12 May 2025. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 14:12.
20 Feb and 5 Mar 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Lexham Mews, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 09:18.
21 and 23 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Regent Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 15:02.
21 Feb and 19 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on West Cross Route, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 31 Oct 2024 at 17:39.
21 Feb and 19 May 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Ranelagh Bridge, Bayswater, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 1 Nov 2024 at 15:47.
21 Feb and 19 May 2025
Transport for London (TfL) are proposing to carry out Highway improvement works on Marylebone Flyover, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2024 at 15:16.
21 and 25 Feb 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Harman Close, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 31 Oct 2024 at 12:11.
21 and 25 Feb 2025
London Borough Of Barnet are proposing to carry out Highway improvement works on Harman Close, Cricklewood, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by London Borough Of Barnet on 18 Nov 2024 at 11:12.
24 and 27 Feb 2025
Lumen Technologies are proposing to carry out Utility asset works on Baker Street, Marylebone High Street, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lumen Technologies on 29 Nov 2024 at 09:11.
24 Feb and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Woburn Place, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 18:12.
24 Feb and 23 Mar 2025
Thames Water are proposing to carry out Utility asset works on Woburn Place, Bloomsbury, London.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:12.
24 Feb and 2 Mar 2025
Thames Water were proposing to carry out roadworks on Ponsard Road, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 2 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 12:51.
24 and 28 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Clifton Way, Wembley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks Eastern & London on 19 Nov 2024 at 04:32.
24 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Christchurch Avenue, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 17:30.
24 Feb and 1 Apr 2025
Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge, Battersea, London.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2024 at 13:10.
24 Feb and 10 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Lonsdale Road, Barnes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Nov 2024 at 10:21.
24 and 27 Feb 2025
Hyperoptic are proposing to carry out Utility asset works on Strutton Ground, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Hyperoptic on 28 Nov 2024 at 06:39.
24 Feb and 4 Mar 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Great Smith Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:40.
24 and 28 Feb 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Jermyn Street, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 10:43.
24 Feb and 16 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Ground, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 18 Jul 2024 at 10:50.
24 Feb and 7 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Drury Lane, St James's, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 12:30.
24 Feb and 7 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on New Bond Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 20 Nov 2024 at 15:23.
24 Feb and 3 Mar 2025
Thames Water were proposing to carry out New service connection on Great Cumberland Place, Bryanston & Dorset Square, London.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:47.
27 Feb and 1 Mar 2025
Virgin Media are proposing to carry out Utility asset works on Charles Street, West End, London.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 19 Nov 2024 at 11:42.
Roadworks Map near to Colet Gardens, LONDON, W14 9DN
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Colet Gardens, LONDON, W14 9DN (156 Events)
(Scheduled Dates)
(miles)
(Scheduled: 16 May 2024 - 31 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data