ROADWORKS SUMMARY
Portman Rise, GUISBOROUGH, TS14 7LW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Portman Rise, TS14 7LW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Portman Rise, GUISBOROUGH, TS14 7LW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Portman Rise are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Northern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Derwent Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Derwent Road, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway, verge and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 25 Jul 2024 at 09:46.

Northern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Ullswater Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Ullswater Drive, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northern Gas Networks on 26 Jul 2024 at 08:35.

Northern Gas Networks logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Coniston Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 08:00 and could run through until 23 December 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 14:25.

Northumbrian Water logo
LONG TERM
Between
1 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Balmoral Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Balmoral Road, Lingdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 November 2024 and could run through until 20 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Northumbrian Water on 1 Oct 2024 at 09:33.

Northumbrian Water logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Front Street Back Street Rear Of Back Street

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Front Street Back Street Rear Of Back Street, Charltons.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 4 Oct 2024 at 13:23.

Northumbrian Water logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Front Street Back Street Rear Of Back Street

Northumbrian Water are carrying out Utility repair and maintenance works on Front Street Back Street Rear Of Back Street, Charltons.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 08:00 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 9 Dec 2024 at 10:54.

Northumbrian Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Front Street

Northumbrian Water are carrying out Utility repair and maintenance works on Front Street, Charltons.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northumbrian Water on 9 Dec 2024 at 15:49.

Northern Gas Networks logo
LONG TERM
Between
11 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Coniston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 26 Jul 2024 at 08:46.

Northern Gas Networks logo
LONG TERM
Between
18 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Farndale Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Farndale Drive, Guisborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 13:51.

Northern Gas Networks logo
Today
Details
View Map
Share
Marske Lane

Northern Gas Networks carried out Utility repair and maintenance works on Marske Lane, Skelton-in-cleveland.

These works were categorised as Major.

Multi-way signals were in place for some or all of the period.

The works were originally planned between 20 Nov 2024 and 11 Dec 2024 and were actually completed between 25 Nov 2024 (08:00) and 11 Dec 2024 (14:30). The works impacted the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 14:33.

Northern Gas Networks logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Grasmere Crescent

Northern Gas Networks are carrying out Utility repair and maintenance works on Grasmere Crescent, Skelton-in-cleveland.

These works are categorised as Major.

The works started on 26 November 2024 at 12:00 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 26 Nov 2024 at 13:12.

Northern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
The Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Guisborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 7 Nov 2024 at 13:50.

Northern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Grasmere Crescent

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Grasmere Crescent, Skelton-in-cleveland.

These works are categorised as Major.

The works will start on or after 2 December 2024 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 26 Jul 2024 at 08:40.

Northern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Coniston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 26 Jul 2024 at 08:48.

Northern Gas Networks logo
Until
24 Dec 2024
Details
View Map
Share
Follow
Coniston Road

Northern Gas Networks are carrying out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 16:00 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 10 Dec 2024 at 16:01.

Northern Gas Networks logo
LONG TERM
Until
8 Jan 2025
Details
View Map
Share
Follow
Farndale Drive

Northern Gas Networks are carrying out Utility repair and maintenance works on Farndale Drive, Guisborough.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 12:00 and could run through until 8 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 6 Dec 2024 at 12:05.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Albert Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Albert Road, Eston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 9 Oct 2024 at 11:22.

Northumbrian Water logo
Finishing
Friday
Details
View Map
Share
Follow
Albert Road

Northumbrian Water are carrying out Utility repair and maintenance works on Albert Road, Eston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:45 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Northumbrian Water on 11 Dec 2024 at 11:54.

Northumbrian Water logo
Until
20 Dec 2024
Details
View Map
Share
Follow
South Terrace

Northumbrian Water are carrying out Utility repair and maintenance works on South Terrace, Skelton-in-cleveland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 9 Dec 2024 at 11:23.

Northumbrian Water logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
South Terrace

Northumbrian Water are proposing to carry out Utility repair and maintenance works on South Terrace, Skelton-in-cleveland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 30 Oct 2024 at 16:21.

Northern Gas Networks logo
Between
11 Dec 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Town Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Green, Skelton-in-cleveland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 6 January 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 9 Dec 2024 at 10:57.

Northumbrian Water logo
LONG TERM
Between
20 Dec 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Stanghow Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Stanghow Road, Lingdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Oct 2024 at 09:35.

Northumbrian Water logo
LONG TERM
Between
20 Dec 2024 and 17 Apr 2025
Details
View Map
Share
Follow
Stanghow Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Stanghow Road, Lingdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 December 2024 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 4 Dec 2024 at 10:20.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
High Street

Northern Powergrid (Northeast) are proposing to carry out New service connection on High Street, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Dec 2024 at 12:39.

Northern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
The Avenue

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on The Avenue, Guisborough.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 5 Dec 2024 at 16:06.

Northumbrian Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Rosedale Crescent

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Rosedale Crescent, Guisborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Nov 2024 at 08:59.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Windermere Drive

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Windermere Drive, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 21 Aug 2024 at 12:06.

Northumbrian Water logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Whitby Lane

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Whitby Lane, Guisborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 11 Dec 2024 at 10:30.

Northumbrian Water logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Balmoral Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Balmoral Road, Lingdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 13 Nov 2024 at 12:59.

Northern Gas Networks logo
LONG TERM
Between
6 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Coniston Road

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coniston Road, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Northern Gas Networks on 9 Aug 2024 at 13:32.

Northern Gas Networks logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Garsbeck Way

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Garsbeck Way, Ormesby.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 10:56.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
High Street

Northern Powergrid (Northeast) were proposing to carry out New service connection on High Street, Eston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 6 Nov 2024 at 12:47.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
High Street

Northern Powergrid (Northeast) were proposing to carry out New service connection on High Street, Eston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 31 Oct 2024 at 09:20.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Durham Road

Northern Powergrid (Northeast) were proposing to carry out New service connection on Durham Road, Eston.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 31 Oct 2024 at 09:20.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Durham Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Durham Road, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 11 Dec 2024 at 12:40.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Durham Road

Northern Powergrid (Northeast) are proposing to carry out New service connection on Durham Road, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Dec 2024 at 11:23.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
High Street

Northern Powergrid (Northeast) are proposing to carry out New service connection on High Street, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Northern Powergrid (Northeast) on 4 Dec 2024 at 11:22.

Northern Powergrid (Northeast) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Winston Drive

Northern Powergrid (Northeast) are proposing to carry out New service connection on Winston Drive, Eston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northern Powergrid (Northeast) on 3 Dec 2024 at 15:57.

Redcar And Cleveland Borough Council logo
LONG TERM
Between
14 Jan and 3 May 2025
Details
View Map
Share
Follow
Longbeck Road

Redcar And Cleveland Borough Council are proposing to carry out Section 50 on Longbeck Road, Marske By The Sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 3 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Redcar And Cleveland Borough Council on 28 Oct 2024 at 14:56.

Northumbrian Water logo
LONG TERM
Between
21 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Sandringham Road

Northumbrian Water are proposing to carry out Utility repair and maintenance works on Sandringham Road, Lingdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Northumbrian Water on 1 Oct 2024 at 09:36.

Northern Gas Networks logo
LONG TERM
Between
27 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Birch Tree Close

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Birch Tree Close, Ormesby.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 March 2025. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Northern Gas Networks on 20 Nov 2024 at 13:10.

Northern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Marske Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marske Lane, Skelton-in-cleveland.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 12 Sep 2024 at 11:46.

Northern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Marske Lane

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Marske Lane, Skelton-in-cleveland.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by Northern Gas Networks on 22 Aug 2024 at 15:15.

Northern Gas Networks logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Town Green

Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Green, Skelton-in-cleveland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Northern Gas Networks on 6 Aug 2024 at 10:30.


Roadworks Map near to Portman Rise, GUISBOROUGH, TS14 7LW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Portman Rise, GUISBOROUGH, TS14 7LW (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Redcar And Cleveland Borough Council logo
TEDWORTH CLOSE 
(0.2 miles)
Redcar And Cleveland Borough Council
Highway repair and maintenance works - Footway - Give and take
Complete
10 Dec 2024 08:30 - 14:22
0.2
Details
Share
2
Northern Gas Networks logo
GOATHLAND GROVE 
(0.4 miles)
Northern Gas Networks
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 4 Dec 2024 14:01
(Scheduled: 3 Dec 2024 - 16 Dec 2024)
0.4
Details
Share
Follow
3
Redcar And Cleveland Borough Council logo
CHAPELBECK BUNGALOWS 
(0.9 miles)
Redcar And Cleveland Borough Council
Highway repair and maintenance works - Footway - Give and take
In Progress
Since: 9 Dec 2024 08:46
(Scheduled: 6 Dec 2024 - 11 Dec 2024)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.