The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to North Side, SALTBURN-BY-THE-SEA, TS13 5BY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for North Side are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Friday
Northern Powergrid (Northeast) are carrying out Utility asset works on Beckside, Staithes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 17 October 2024 at 13:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 10 Dec 2024 at 10:17.
24 Dec 2024
Northern Powergrid (Northeast) are carrying out Utility asset works on Access Road To Rear Of Beckside, Staithes.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 08:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 20 Nov 2024 at 08:12.
Monday
Northern Gas Networks are carrying out Utility repair and maintenance works on Front Street, Carlin How.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 November 2024 at 08:00 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 11 Dec 2024 at 10:30.
22 Dec 2024
Northumbrian Water are carrying out Utility repair and maintenance works on New Company Row, Skinningrove.
These works are categorised as Major.
The works started on 24 November 2024 at 09:30 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 25 Nov 2024 at 08:02.
22 Dec 2024
Northumbrian Water are carrying out Utility repair and maintenance works on Mill Lane, Skinningrove.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 November 2024 at 09:30 and could run through until 22 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 25 Nov 2024 at 08:03.
Monday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mount Pleasant Back Street Rear Of Westray Street, Carlin How.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Sep 2024 at 15:37.
16 Jan 2025
Northern Gas Networks are carrying out Utility repair and maintenance works on Brotton Road, Carlin How.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 28 Nov 2024 at 13:53.
25 Nov 2024 and 16 Jan 2025
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brotton Road, Carlin How.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 24 Sep 2024 at 09:36.
25 Nov and 23 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Brotton Road, Carlin How.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 20 Sep 2024 at 10:50.
25 Nov and 23 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Wesley Terrace, Carlin How.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 20 Sep 2024 at 10:45.
Monday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Front Street, Carlin How.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 24 Sep 2024 at 09:18.
25 Nov and 23 Dec 2024
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Belle Vue Terrace, Carlin How.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 24 Sep 2024 at 09:35.
Monday
Northern Gas Networks are carrying out Utility repair and maintenance works on Mill Lane, Carlin How.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 25 Nov 2024 at 09:00.
Monday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Mill Lane, Carlin How.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Northern Gas Networks on 24 Sep 2024 at 09:16.
Monday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Steavenson Street, Carlin How.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Northern Gas Networks on 20 Sep 2024 at 14:27.
25 Nov and 20 Dec 2024
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Access Road To Rear Of Beckside, Staithes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 7 Oct 2024 at 16:38.
25 Nov and 20 Dec 2024
Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Access Road To Rear Of Beckside, Staithes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Oct 2024 at 08:45.
25 Nov and 20 Dec 2024
Northern Powergrid (Northeast) were proposing to carry out Utility asset works on Access Road To Rear Of Beckside, Staithes.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and footpath.
This roadwork event was last updated by Northern Powergrid (Northeast) on 8 Aug 2024 at 15:56.
Monday
Northern Gas Networks are proposing to carry out Utility repair and maintenance works on Coronation Street Back Street Joining Queen Street South, Carlin How.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 24 Sep 2024 at 09:37.
31 Dec 2024
Northern Gas Networks are carrying out Utility repair and maintenance works on Mount Pleasant Back Street Rear Of Westray Street, Carlin How.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 December 2024 at 15:50 and could run through until 31 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Gas Networks on 6 Dec 2024 at 15:53.
2 and 20 Dec 2024
Northern Powergrid (Northeast) are proposing to carry out Utility asset works on Access Road To Rear Of Beckside, Staithes.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Northern Powergrid (Northeast) on 23 Jul 2024 at 12:30.
17 and 21 Feb 2025
Northumbrian Water are proposing to carry out Utility repair and maintenance works on St Hildas Terrace Back Street Rear Of Hartington Street, Loftus.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Northumbrian Water on 14 Nov 2024 at 12:48.
Roadworks Map near to North Side, SALTBURN-BY-THE-SEA, TS13 5BY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to North Side, SALTBURN-BY-THE-SEA, TS13 5BY (7 Events)
(Scheduled Dates)
(miles)
(Scheduled: 14 Oct 2024 - 13 Dec 2024)
(Scheduled: 18 Nov 2024 - 24 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.