ROADWORKS SUMMARY
Westwell, ASHFORD, TN25 4NG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for TN25 4NG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Westwell, ASHFORD, TN25 4NG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Kent County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Willesborough Road

Kent County Council are carrying out Section 50 on Willesborough Road, Kennington.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 August 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Kent County Council on 5 Dec 2024 at 15:28.

Kent County Council logo
LONG TERM
Until
2 Jan 2025
Details
View Map
Share
Follow
Hurstford Lane

Kent County Council are carrying out Highway improvement works on Hurstford Lane, Charing.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 October 2024 at 08:00 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 Sep 2024 at 14:24.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Thornlea

Southern Gas Networks are carrying out Utility repair and maintenance works on Thornlea, Ashford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 16:19.

Southern Gas Networks logo
Until
18 Dec 2024
Details
View Map
Share
Follow
Godinton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Godinton Road, Ashford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 November 2024 at 10:00 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 09:56.

South East Water logo
Finishing
Today
Details
View Map
Share
Follow
Cradlebridge Drive

South East Water are carrying out Utility repair and maintenance works on Cradlebridge Drive, Willesborough.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 05:58 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 4 Dec 2024 at 14:25.

Southern Gas Networks logo
Until
18 Dec 2024
Details
View Map
Share
Follow
Beaver Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Beaver Road, Ashford.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 12:00 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 12:39.

Kent County Council logo
LONG TERM
Between
9 Dec 2024 and 26 Jan 2025
Details
View Map
Share
Follow
Charing Hill

Kent County Council are proposing to carry out Highway improvement works on Charing Hill, Charing.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 5 Dec 2024 at 18:37.

Southern Gas Networks logo
Until
18 Dec 2024
Details
View Map
Share
Follow
Pluckley Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Pluckley Road, Charing.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 11:40 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 13:55.

National Highways logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Sandyhurst Lane

National Highways are proposing to carry out Highway repair and maintenance works on Sandyhurst Lane, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 2 Dec 2024 at 15:28.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Loudon Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Loudon Way, Ashford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:02.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hampden Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hampden Lane, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2024 at 14:27.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hampden Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hampden Lane, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:54.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Austin Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Austin Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 May 2024 at 07:52.

Kent County Council logo
On
10 Jan 2025
Details
View Map
Share
Pett Lane

Kent County Council were proposing to carry out Highway improvement works on Pett Lane, Charing.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 10 January 2025 The works were due to impact the carriageway only.

This roadwork event was last updated by Kent County Council on 4 Dec 2024 at 11:46.

Kent County Council logo
On
13 Jan 2025
Details
View Map
Share
Follow
Maidstone Road

Kent County Council are carrying out Highway improvement works on Maidstone Road, Charing.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 13 January 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 20 Nov 2024 at 14:33.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Cypress Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Cypress Avenue, Ashford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:09.

UK Power Networks South Eastern logo
Between
15 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Canterbury Road

UK Power Networks South Eastern are proposing to carry out New service connection on Canterbury Road, Kennington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Oct 2024 at 16:25.

UK Power Networks South Eastern logo
Between
15 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Canterbury Road

UK Power Networks South Eastern are proposing to carry out New service connection on Canterbury Road, Kennington.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Oct 2024 at 13:12.

South East Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
The Street

South East Water were proposing to carry out Utility repair and maintenance works on The Street, Westwell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South East Water on 24 Oct 2024 at 15:02.

South East Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
Beaver Road

South East Water are proposing to carry out New service connection on Beaver Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 22 Nov 2024 at 12:24.

Southern Water logo
Between
31 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Beaver Road

Southern Water are proposing to carry out Utility repair and maintenance works on Beaver Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 22 Nov 2024 at 11:59.

Southern Gas Networks logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Kingsnorth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsnorth Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 May 2024 at 14:35.

Southern Gas Networks logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Kingsnorth Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kingsnorth Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 09:55.

South East Water logo
Between
4 and 11 Feb 2025
Details
View Map
Share
Follow
Bowl Road

South East Water are proposing to carry out New service connection on Bowl Road, Charing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 11 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 9 Dec 2024 at 09:51.

UK Power Networks South Eastern logo
Between
4 and 10 Feb 2025
Details
View Map
Share
Follow
Rylands Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Rylands Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 8 Nov 2024 at 16:11.

Southern Gas Networks logo
Between
10 and 28 Feb 2025
Details
View Map
Share
Follow
Springwood Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springwood Drive, Ashford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:15.

South East Water logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Maidstone Road North Of Drovers Roundabout

South East Water are proposing to carry out Utility asset works on Maidstone Road North Of Drovers Roundabout, North Of Simone Weil Roundabout, Ashford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 11 Dec 2024 at 15:15.

South East Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
The Hill

South East Water are proposing to carry out New service connection on The Hill, Charing.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 9 Dec 2024 at 13:08.

Southern Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Godinton Road

Southern Water are proposing to carry out Utility repair and maintenance works on Godinton Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 3 Dec 2024 at 16:15.

South East Water logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Maidstone Road North Of Drovers Roundabout

South East Water are proposing to carry out Utility asset works on Maidstone Road North Of Drovers Roundabout, North Of Simone Weil Roundabout, Ashford.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 11 Dec 2024 at 15:11.

Southern Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Godinton Road

Southern Water are proposing to carry out Utility repair and maintenance works on Godinton Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 19 Nov 2024 at 12:36.

Southern Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Godinton Road

Southern Water are proposing to carry out Utility repair and maintenance works on Godinton Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Nov 2024 at 13:21.

Southern Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Godinton Road

Southern Water are proposing to carry out Utility repair and maintenance works on Godinton Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Nov 2024 at 15:36.

Kent County Council logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Victoria Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Victoria Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Oct 2024 at 15:08.

Kent County Council logo
Between
10 and 15 Mar 2025
Details
View Map
Share
Follow
Sandyhurst Lane

Kent County Council are proposing to carry out Highway improvement works on Sandyhurst Lane, Boughton Aluph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Kent County Council on 11 Dec 2024 at 11:08.

Kent County Council logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Avenue Jacques Faucheux

Kent County Council are proposing to carry out Highway repair and maintenance works on Avenue Jacques Faucheux, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Oct 2024 at 15:11.

South East Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Sparrow Hatch Lane

South East Water are proposing to carry out Utility repair and maintenance works on Sparrow Hatch Lane, Bethersden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 9 Dec 2024 at 15:59.

Kent County Council logo
LONG TERM
Between
10 Mar and 2 May 2025
Details
View Map
Share
Follow
Beaver Road

Kent County Council are proposing to carry out Highway repair and maintenance works on Beaver Road, Ashford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Kent County Council on 25 Oct 2024 at 15:11.


Roadworks Map near to Westwell, ASHFORD, TN25 4NG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 22:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Westwell, ASHFORD, TN25 4NG (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.