ROADWORKS SUMMARY
Knollys Road, LONDON, SW16 2JX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Knollys Road, SW16 2JX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Knollys Road, LONDON, SW16 2JX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Knollys Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Tideway Tunnel logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Deptford Church Street

Thames Tideway Tunnel are carrying out Statutory Infrastructure Works on Deptford Church Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 July 2020 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 10 Dec 2024 at 11:40.

Thames Tideway Tunnel logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Trinity Road

Thames Tideway Tunnel are carrying out Utility asset works on Trinity Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 March 2021 at 14:50 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 1 Jul 2024 at 10:28.

London Borough Of Wandsworth logo
LONG TERM
Until
24 Feb 2026
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 April 2021 at 08:00 and could run through until 24 February 2026. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 27 Feb 2024 at 12:14.

Thames Water logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Vulcan Road

Thames Water are carrying out roadworks on Vulcan Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 August 2021 at 10:00 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 09:46.

London Borough Of Southwark logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Bianca Road

London Borough Of Southwark are carrying out Highway improvement works on Bianca Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 May 2022 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 20 Jun 2024 at 05:53.

Thames Tideway Tunnel logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Albert Embankment

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on Albert Embankment, Prince's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 September 2022 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Tideway Tunnel on 23 Oct 2024 at 08:37.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2023 at 08:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 9 Jan 2023 at 09:41.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Sloane Terrace

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Terrace, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Ellis Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Ellis Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 15:53.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Pont Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Pont Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Cadogan Place

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Cadogan Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:15.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Between
7 Jan 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Harriet Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Harriet Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 14 Dec 2022 at 16:04.

London Borough Of Wandsworth logo
LONG TERM
Between
17 Feb 2023 and 30 Apr 2025
Details
View Map
Share
Follow
Havelock Terrace

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Havelock Terrace, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2023 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 14 May 2024 at 13:21.

London Borough Of Wandsworth logo
LONG TERM
Between
17 Feb 2023 and 30 Apr 2025
Details
View Map
Share
Follow
Bradmead

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Bradmead, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2023 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 14 May 2024 at 13:21.

Transport for London (TfL) logo
LONG TERM
Between
30 Mar 2023 and 25 Mar 2025
Details
View Map
Share
Follow
St Thomas Street

Transport for London (TfL) are proposing to carry out roadworks on St Thomas Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 March 2023 and could run through until 25 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 4 Apr 2024 at 14:01.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Cadogan Gardens

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Cadogan Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 May 2023 at 07:00 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 15 May 2023 at 07:01.

Thames Tideway Tunnel logo
LONG TERM
Until
30 May 2025
Details
View Map
Share
Follow
York Road

Thames Tideway Tunnel are carrying out Utility repair and maintenance works on York Road, Wandsworth, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 May 2023 at 08:00 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 4 Dec 2024 at 09:17.

London Borough Of Southwark logo
LONG TERM
Until
11 Jan 2025
Details
View Map
Share
Follow
Melior Street

London Borough Of Southwark are carrying out Highway improvement works on Melior Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 July 2023 at 23:00 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Apr 2024 at 18:14.

Transport for London (TfL) logo
LONG TERM
Between
6 Sep 2023 and 3 Sep 2025
Details
View Map
Share
Follow
Walworth Road

Transport for London (TfL) are proposing to carry out roadworks on Walworth Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2023 and could run through until 3 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 25 Oct 2023 at 13:54.

Transport for London (TfL) logo
LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Jan 2024 at 14:15.

Transport for London (TfL) logo
LONG TERM
Until
11 Oct 2025
Details
View Map
Share
Follow
Druid Street

Transport for London (TfL) are carrying out roadworks on Druid Street, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2023 at 06:00 and could run through until 11 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2023 at 21:46.

Thames Water logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Eaton Square

Thames Water are carrying out Utility asset works on Eaton Square, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 January 2024 at 08:30 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 14:36.

Transport for London (TfL) logo
LONG TERM
Between
17 Jan 2024 and 14 Jan 2026
Details
View Map
Share
Follow
Victoria Embankment

Transport for London (TfL) are proposing to carry out roadworks on Victoria Embankment, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2024 and could run through until 14 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Jan 2024 at 09:41.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Mount Rise

Thames Water are carrying out Disconnection or alteration of supply on Mount Rise, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:47.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Grassmount

Thames Water are carrying out Disconnection or alteration of supply on Grassmount, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:46.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Forestholme Close

Thames Water are carrying out Disconnection or alteration of supply on Forestholme Close, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:50.

Thames Water logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Taymount Rise

Thames Water are carrying out Disconnection or alteration of supply on Taymount Rise, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 February 2024 at 09:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:49.

Transport for London (TfL) logo
LONG TERM
Between
14 Feb 2024 and 12 Feb 2025
Details
View Map
Share
Follow
Vauxhall Bridge Road

Transport for London (TfL) are proposing to carry out roadworks on Vauxhall Bridge Road, Tachbrook, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2024 and could run through until 12 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 31 Jul 2024 at 15:58.

Network Rail logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Sydenham Road

Network Rail are carrying out Works for Rail Purposes on Sydenham Road, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 February 2024 at 10:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Nov 2024 at 07:10.

UK Power Networks Eastern & London logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Sydenham Park

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Sydenham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 10:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Dec 2024 at 11:24.

Thames Water logo
LONG TERM
Between
15 Apr 2024 and 23 Jan 2025
Details
View Map
Share
Follow
Monnow Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Monnow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2024 and could run through until 23 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Mar 2023 at 13:34.

London Borough Of Lambeth logo
LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 09:44.

London Borough Of Lambeth logo
LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 12:45.

London Borough Of Lambeth logo
LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 3 Apr 2024 at 09:46.

London Borough Of Lambeth logo
LONG TERM
Between
7 May 2024 and 21 Jan 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 25 Mar 2024 at 12:51.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Thorncombe Road

Thames Water are carrying out Disconnection or alteration of supply on Thorncombe Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 10:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 May 2024 at 09:54.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Glengarry Road

Thames Water are carrying out Disconnection or alteration of supply on Glengarry Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 May 2024 at 10:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Oct 2024 at 09:25.

Thames Water logo
LONG TERM
Until
10 Feb 2025
Details
View Map
Share
Follow
Wiltshire Road

Thames Water are carrying out Disconnection or alteration of supply on Wiltshire Road, Brixton North, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 May 2024 at 08:00 and could run through until 10 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 29 May 2024 at 07:50.

Thames Water logo
LONG TERM
Until
13 Feb 2025
Details
View Map
Share
Follow
Western Road

Thames Water are carrying out Disconnection or alteration of supply on Western Road, Brixton North, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2024 at 10:45 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 3 Jun 2024 at 09:54.

London Borough Of Southwark logo
LONG TERM
Until
5 Mar 2025
Details
View Map
Share
Follow
Borland Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Borland Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 08:00 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:54.

London Borough Of Southwark logo
LONG TERM
Until
12 Mar 2025
Details
View Map
Share
Follow
Limesford Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Limesford Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 07:00 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Jun 2024 at 07:53.

Transport for London (TfL) logo
LONG TERM
Between
10 Jun 2024 and 13 Apr 2026
Details
View Map
Share
Follow
Kennington Lane

Transport for London (TfL) are proposing to carry out roadworks on Kennington Lane, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 13 April 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 6 Jun 2024 at 10:34.

UK Power Networks Eastern & London logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Jews Walk

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Jews Walk, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 June 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 15:35.

London Borough Of Wandsworth logo
LONG TERM
Until
18 Jun 2025
Details
View Map
Share
Follow
Totterdown Street

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Totterdown Street, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 June 2024 at 08:00 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 26 Jun 2024 at 07:16.

London Borough Of Wandsworth logo
LONG TERM
Between
24 Jun 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Randall Close

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Randall Close, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 June 2024 and could run through until 1 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Wandsworth on 4 Jul 2024 at 14:24.

Thames Tideway Tunnel logo
LONG TERM
Until
31 Jul 2025
Details
View Map
Share
Follow
Nine Elms Lane

Thames Tideway Tunnel are carrying out Works for road purposes on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 26 June 2024 at 08:00 and could run through until 31 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Tideway Tunnel on 24 Jul 2024 at 12:05.

London Borough Of Southwark logo
LONG TERM
Between
2 Jul 2024 and 27 Jan 2026
Details
View Map
Share
Follow
Sceaux Gardens

London Borough Of Southwark are proposing to carry out Highway improvement works on Sceaux Gardens, London.

These works are categorised as Major.

The works will start on or after 2 July 2024 and could run through until 27 January 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Jul 2024 at 16:30.

Thames Water logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Gresham Road

Thames Water are carrying out Disconnection or alteration of supply on Gresham Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 July 2024 at 11:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Jul 2024 at 10:51.

London Borough Of Southwark logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Warndon Street

London Borough Of Southwark are carrying out Highway improvement works on Warndon Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 July 2024 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 09:36.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
Lower Sloane Street

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Lower Sloane Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2024 at 08:00 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 8 Jul 2024 at 07:51.

London Borough Of Southwark logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
King James Street

London Borough Of Southwark are carrying out Highway improvement works on King James Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 July 2024 at 06:51 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 12 Jul 2024 at 05:55.

Transport for London (TfL) logo
LONG TERM
Between
15 Jul 2024 and 13 Jul 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 July 2024 and could run through until 13 July 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 10:48.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Dec 2024
Details
View Map
Share
Follow
Summerley Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Summerley Street, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2023 at 08:07.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 22 Dec 2024
Details
View Map
Share
Follow
Thornsett Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornsett Road, Earlsfield, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 24 Apr 2023 at 13:11.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 22 Dec 2024
Details
View Map
Share
Follow
Garratt Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Apr 2023 at 07:11.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 22 Dec 2024
Details
View Map
Share
Follow
Magdalen Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Apr 2023 at 07:12.

Southern Gas Networks logo
LONG TERM
Between
23 Jul and 22 Dec 2024
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 July 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Apr 2023 at 07:08.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 31 Mar 2025
Details
View Map
Share
The Ridgeway

Thames Water were proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 July 2024 and run through until 31 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Aug 2024 at 13:27.

Thames Water logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Palace Road

Thames Water are carrying out Disconnection or alteration of supply on Palace Road, St Martin's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 12:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 14:48.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Ivydale Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Ivydale Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 15 Jan 2024 at 09:00.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 5 Feb 2025
Details
View Map
Share
Follow
Kempsford Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kempsford Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 26 Jul 2024 at 15:30.

Thames Water logo
LONG TERM
Between
29 Jul 2024 and 5 Feb 2025
Details
View Map
Share
Follow
Wincott Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Wincott Street, Kennington, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2024 and could run through until 5 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 26 Jul 2024 at 15:30.

Thames Water logo
LONG TERM
Friday
Details
View Map
Share
Wilton Road

Thames Water carried out Utility asset works on Wilton Road, Warwick, London.

These works were categorised as Major.

A lane was closed for some or all of the period.

The works were originally planned between 29 Jul 2024 and 13 Dec 2024 and were actually completed between 31 Jul 2024 (10:30) and 11 Dec 2024 (14:30). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 14:55.

London Borough Of Lewisham logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Lewisham High Street

London Borough Of Lewisham are carrying out Highway improvement works on Lewisham High Street, Hither Green, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2024 at 08:00 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 2 Dec 2024 at 15:03.

Thames Water logo
LONG TERM
Between
12 Aug 2024 and 22 Jul 2025
Details
View Map
Share
Renfrew Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2024 and run through until 22 July 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 08:56.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 30 Jun 2025
Details
View Map
Share
Concert Hall Approach

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Concert Hall Approach, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 August 2024 and run through until 30 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 07:44.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 8 Aug 2024 at 14:49.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 25 Apr 2025
Details
View Map
Share
Concert Hall Approach

London Borough Of Lambeth were proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 August 2024 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 1 Aug 2024 at 10:36.

London Borough Of Lambeth logo
LONG TERM
Between
19 Aug 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 August 2024 and could run through until 25 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 2 Aug 2024 at 13:35.

Thames Water logo
LONG TERM
Between
26 Aug 2024 and 28 Feb 2025
Details
View Map
Share
The Ridgeway

Thames Water were proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2024 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 09:15.

London Borough Of Merton logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Streatham Road

London Borough Of Merton are carrying out Highway improvement works on Streatham Road, Mitcham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 August 2024 at 09:30 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 3 Sep 2024 at 15:24.

Transport for London (TfL) logo
LONG TERM
Between
29 Aug and 28 Dec 2024
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:17.

Transport for London (TfL) logo
LONG TERM
Between
29 Aug and 28 Dec 2024
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:16.

Transport for London (TfL) logo
LONG TERM
Between
29 Aug and 28 Dec 2024
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:18.

Transport for London (TfL) logo
LONG TERM
Between
29 Aug and 28 Dec 2024
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:18.

London Borough Of Southwark logo
LONG TERM
Between
30 Aug and 18 Dec 2024
Details
View Map
Share
Follow
Warndon Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Warndon Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Aug 2024 at 11:01.

London Borough Of Southwark logo
LONG TERM
Between
31 Aug 2024 and 31 May 2025
Details
View Map
Share
Follow
Stoney Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 13:59.

London Borough Of Southwark logo
LONG TERM
Between
31 Aug 2024 and 31 May 2025
Details
View Map
Share
Follow
Stoney Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Stoney Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 August 2024 and could run through until 31 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:06.

Royal Borough Of Kensington And Chelsea logo
LONG TERM
Until
7 Mar 2025
Details
View Map
Share
Follow
Draycott Avenue

Royal Borough Of Kensington And Chelsea are carrying out Highway repair and maintenance works on Draycott Avenue, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2024 at 08:00 and could run through until 7 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 2 Sep 2024 at 09:00.

London Borough Of Southwark logo
LONG TERM
Between
2 Sep 2024 and 2 Jun 2025
Details
View Map
Share
Follow
Slippers Place

London Borough Of Southwark are proposing to carry out Highway improvement works on Slippers Place, London.

These works are categorised as Major.

The works will start on or after 2 September 2024 and could run through until 2 June 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 30 Sep 2024 at 16:30.

Thames Water logo
LONG TERM
Between
3 Sep 2024 and 24 Mar 2025
Details
View Map
Share
Follow
Waddon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 September 2024 and could run through until 24 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:53.

London Borough Of Southwark logo
LONG TERM
Until
4 Jan 2025
Details
View Map
Share
Follow
Paris Garden

London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:42.

London Borough Of Southwark logo
LONG TERM
Until
4 Jan 2025
Details
View Map
Share
Follow
Paris Garden

London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:42.

London Borough Of Southwark logo
LONG TERM
Until
4 Jan 2025
Details
View Map
Share
Follow
Paris Garden

London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:55.

London Borough Of Southwark logo
LONG TERM
Until
4 Jan 2025
Details
View Map
Share
Follow
Paris Garden

London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 06:55.

London Borough Of Southwark logo
LONG TERM
Until
4 Jan 2025
Details
View Map
Share
Follow
Paris Garden

London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 07:08.

London Borough Of Southwark logo
LONG TERM
Until
4 Jan 2025
Details
View Map
Share
Follow
Paris Garden

London Borough Of Southwark are carrying out Highway improvement works on Paris Garden, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 September 2024 at 00:00 and could run through until 4 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 8 Oct 2024 at 07:08.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:21.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:23.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:22.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 28 Aug 2024 at 15:22.

London Borough Of Lambeth logo
LONG TERM
Between
9 Sep 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 2 Sep 2024 at 12:45.

London Borough Of Lambeth logo
LONG TERM
Between
9 Sep 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 12:00.

London Borough Of Lambeth logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are carrying out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 9 Sep 2024 at 08:13.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Beddington Farm Road

UK Power Networks South Eastern are proposing to carry out New service connection on Beddington Farm Road, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks South Eastern on 6 Aug 2024 at 12:50.

UK Power Networks South Eastern logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Beddington Farm Road

UK Power Networks South Eastern are carrying out New service connection on Beddington Farm Road, Beddington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Sep 2024 at 08:59.

UK Power Networks South Eastern logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are carrying out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 September 2024 at 08:00 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 25 Nov 2024 at 09:58.

Thames Water logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Northstead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 15:10.

Thames Water logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Northstead Road

Thames Water are proposing to carry out roadworks on Northstead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 15:29.

Thames Water logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Kingsmead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 6 Sep 2024 at 15:11.

Thames Water logo
LONG TERM
Between
9 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Kingsmead Road

Thames Water are proposing to carry out roadworks on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 15:28.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Vesta Road

Thames Water are proposing to carry out Utility asset works on Vesta Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:25.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Ashby Road

Thames Water are proposing to carry out Utility asset works on Ashby Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 11:20.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 8 Sep 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out roadworks on New Cross Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2024 and could run through until 8 September 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 Aug 2024 at 12:38.

Transport for London (TfL) logo
LONG TERM
Between
9 Sep 2024 and 8 Sep 2025
Details
View Map
Share
New Cross Road

Transport for London (TfL) were proposing to carry out roadworks on New Cross Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 September 2024 and run through until 8 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 11:30.

Thames Water logo
LONG TERM
Until
6 Feb 2025
Details
View Map
Share
Follow
Gilbert Road

Thames Water are carrying out Disconnection or alteration of supply on Gilbert Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 13:50 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 14:37.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 11:56.

Transport for London (TfL) logo
LONG TERM
Until
1 Feb 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are carrying out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 13:27.

Transport for London (TfL) logo
LONG TERM
Until
1 Feb 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:05.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Lambeth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 16 Sep 2024 at 09:10.

Transport for London (TfL) logo
LONG TERM
Until
1 Feb 2025
Details
View Map
Share
Follow
Lambeth Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 14:57.

Transport for London (TfL) logo
LONG TERM
Until
1 Feb 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:06.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 1 Feb 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 1 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 29 Aug 2024 at 14:57.

Transport for London (TfL) logo
LONG TERM
Until
1 Feb 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are carrying out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2024 at 08:00 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 17 Sep 2024 at 08:07.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 10:42.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 30 May 2025
Details
View Map
Share
Follow
Battersea Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 30 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 May 2024 at 10:41.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Cheyne Walk

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Cheyne Walk, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 08:41.

Transport for London (TfL) logo
LONG TERM
Between
17 Sep 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 September 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 13 May 2024 at 08:42.

Transport for London (TfL) logo
LONG TERM
Between
18 Sep and 28 Dec 2024
Details
View Map
Share
Follow
Lambeth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2024 and could run through until 28 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 18 Jun 2024 at 13:34.

Southern Gas Networks logo
LONG TERM
Until
27 Apr 2025
Details
View Map
Share
Follow
Streatham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Streatham Road, Streatham, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 14:43.

London Borough Of Wandsworth logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Putney High Street

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Putney High Street, Putney, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 1 Oct 2024 at 13:25.

London Borough Of Wandsworth logo
LONG TERM
Until
23 Jun 2025
Details
View Map
Share
Follow
Old York Road

London Borough Of Wandsworth are carrying out Highway repair and maintenance works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 October 2024 at 08:00 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 23 Oct 2024 at 09:06.

Transport for London (TfL) logo
LONG TERM
Between
30 Sep 2024 and 1 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 1 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2024 at 12:20.

Thames Water logo
LONG TERM
Finishing
Today
Details
View Map
Share
Hillsboro Road

Thames Water were proposing to carry out roadworks on Hillsboro Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 October 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 15:10.

London Borough Of Southwark logo
LONG TERM
Between
12 Oct 2024 and 12 Oct 2025
Details
View Map
Share
Colombo Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Colombo Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 October 2024 and run through until 12 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 06:32.

Thames Water logo
LONG TERM
Between
14 Oct 2024 and 21 Apr 2025
Details
View Map
Share
Follow
The Ridgeway

Thames Water are proposing to carry out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 21 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 14:41.

Thames Water logo
LONG TERM
Until
21 Apr 2025
Details
View Map
Share
Follow
The Ridgeway

Thames Water are carrying out Disconnection or alteration of supply on The Ridgeway, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 12:15 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 12:42.

Thames Water logo
LONG TERM
Between
14 Oct and 31 Dec 2024
Details
View Map
Share
Follow
Godson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Godson Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 11:19.

Thames Water logo
LONG TERM
Until
31 Dec 2024
Details
View Map
Share
Follow
Godson Road

Thames Water are carrying out Disconnection or alteration of supply on Godson Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 13:00 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 13:26.

Thames Water logo
LONG TERM
Between
15 Oct 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Courtney Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Courtney Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 October 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:49.

UK Power Networks Eastern & London logo
LONG TERM
Between
15 Oct and 30 Dec 2024
Details
View Map
Share
Portland Street

UK Power Networks Eastern & London were proposing to carry out New service connection on Portland Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 October 2024 and run through until 30 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 09:42.

London Borough Of Lambeth logo
LONG TERM
Between
19 Oct 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2024 and could run through until 25 April 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Lambeth on 2 Aug 2024 at 11:58.

London Borough Of Southwark logo
LONG TERM
Until
14 Jan 2025
Details
View Map
Share
Follow
De Laune Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on De Laune Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:45 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 13:27.

London Borough Of Southwark logo
LONG TERM
Until
14 Jan 2025
Details
View Map
Share
Follow
Braganza Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on Braganza Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:45 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 13:27.

London Borough Of Southwark logo
LONG TERM
Until
14 Jan 2025
Details
View Map
Share
Follow
Alberta Street

London Borough Of Southwark are carrying out Highway repair and maintenance works on Alberta Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 09:45 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 13:50.

London Borough Of Southwark logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Bermondsey Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 14 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 11 Oct 2024 at 13:01.

Thames Water logo
LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Woodbury Street

Thames Water are carrying out Utility asset works on Woodbury Street, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 24 October 2024 at 10:00 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:47.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Tooting High Street

Thames Water are carrying out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The works started on 24 October 2024 at 10:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 11:46.

UK Power Networks Eastern & London logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 October 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Jul 2024 at 08:44.

Thames Water logo
LONG TERM
Between
28 Oct 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Truslove Road

Thames Water are proposing to carry out Utility asset works on Truslove Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 09:24.

Thames Water logo
LONG TERM
Until
27 Jan 2025
Details
View Map
Share
Follow
Truslove Road

Thames Water are carrying out Utility asset works on Truslove Road, Knight's Hill, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 10:30 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:59.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Woodbury Street

Thames Water are proposing to carry out Utility asset works on Woodbury Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 23 May 2024 at 12:10.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Woodbury Street

Thames Water are proposing to carry out Utility asset works on Woodbury Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 08:25.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Tooting High Street

Thames Water are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The works will start on or after 28 October 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 29 May 2024 at 08:57.

Southern Gas Networks logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Magdalen Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 14:54.

Southern Gas Networks logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Penwith Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Penwith Road, Southfields, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:38 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 14:55.

Southern Gas Networks logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Garratt Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Garratt Lane, Tooting, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 14:54.

Southern Gas Networks logo
LONG TERM
Until
23 Dec 2024
Details
View Map
Share
Follow
Duntshill Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Duntshill Road, Southfields, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 14:55.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct 2024 and 31 Jan 2026
Details
View Map
Share
Follow
Cringle Street

Transport for London (TfL) are proposing to carry out Highway improvement works on Cringle Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 31 January 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:12.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct and 21 Dec 2024
Details
View Map
Share
Follow
Ponton Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Ponton Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 9 Jul 2024 at 07:31.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct and 21 Dec 2024
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 15 Jul 2024 at 08:20.

Transport for London (TfL) logo
LONG TERM
Between
28 Oct and 21 Dec 2024
Details
View Map
Share
Follow
Wandsworth Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 17 Jul 2024 at 10:23.

London Borough Of Southwark logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Bermondsey Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 12:40.

London Borough Of Southwark logo
LONG TERM
Between
28 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Bermondsey Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:34.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Streatham Common North

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham Common North, Streatham Common & Vale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 7 Jun 2024 at 07:27.

Transport for London (TfL) logo
LONG TERM
Between
4 Nov and 24 Dec 2024
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 24 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 1 Jul 2024 at 07:57.

Transport for London (TfL) logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 09:00 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 08:35.

London Borough Of Southwark logo
LONG TERM
Between
4 Nov 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.

UK Power Networks Eastern & London logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 09:00 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Nov 2024 at 09:11.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 31 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Jun 2024 at 12:15.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 13 Aug 2024 at 10:29.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 15:18.

Thames Water logo
LONG TERM
Between
5 Nov 2024 and 10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are proposing to carry out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 10 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 15:22.

Thames Water logo
LONG TERM
Until
10 Feb 2025
Details
View Map
Share
Follow
Friern Road

Thames Water are carrying out Utility asset works on Friern Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 11:30 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 11:31.

London Borough Of Southwark logo
LONG TERM
Between
5 Nov 2024 and 15 Jan 2025
Details
View Map
Share
Follow
Camberwell Station Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Camberwell Station Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 November 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by London Borough Of Southwark on 22 Jul 2024 at 14:26.

London Borough Of Southwark logo
LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Camberwell Station Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Camberwell Station Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 November 2024 at 08:00 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 7 Nov 2024 at 09:04.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Carlwell Street

Thames Water are carrying out roadworks on Carlwell Street, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 10:30 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:26.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Trevelyan Road

Thames Water are carrying out Utility asset works on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 November 2024 at 10:30 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:26.

Thames Water logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Tooting High Street

Thames Water are carrying out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The works started on 8 November 2024 at 10:30 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 08:27.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Redcliffe Gardens

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 23 Aug 2024 at 15:02.

Transport for London (TfL) logo
LONG TERM
Between
8 Nov 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Redcliffe Gardens

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 28 January 2025. The works will impact the footway, carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 15:23.

Transport for London (TfL) logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Tregunter Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tregunter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Transport for London (TfL) on 5 Aug 2024 at 10:41.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Vauxhall, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 11:26.

Transport for London (TfL) logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Grosvenor Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Grosvenor Road, Churchill, London.

These works are categorised as Major.

The works will start on or after 11 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 14:32.

Transport for London (TfL) logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Grosvenor Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Grosvenor Road, Churchill, London.

These works are categorised as Major.

The works will start on or after 11 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:30.

Transport for London (TfL) logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Grosvenor Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Grosvenor Road, Churchill, London.

These works are categorised as Major.

The works started on 11 November 2024 at 21:00 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 06:49.

Transport for London (TfL) logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millbank, Vincent Square, London.

These works are categorised as Major.

The works will start on or after 11 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 5 Nov 2024 at 14:31.

Transport for London (TfL) logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Millbank, Vincent Square, London.

These works are categorised as Major.

The works will start on or after 11 November 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Nov 2024 at 17:36.

Transport for London (TfL) logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are carrying out Highway repair and maintenance works on Millbank, Vincent Square, London.

These works are categorised as Major.

The works started on 11 November 2024 at 21:00 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 12 Nov 2024 at 06:50.

LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Raymouth Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 11 Nov 2024 at 08:56.

London Borough Of Lambeth logo
LONG TERM
Between
11 Nov 2024 and 30 Jun 2025
Details
View Map
Share
Follow
Concert Hall Approach

London Borough Of Lambeth are proposing to carry out Highway improvement works on Concert Hall Approach, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 30 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 9 Aug 2024 at 11:05.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov 2024 and 11 Jan 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 08:24.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov 2024 and 11 Jan 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 11 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 12:01.

Thames Water logo
LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Balham High Road

Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

The works started on 11 November 2024 at 12:20 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 12:23.

Thames Water logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Hillsboro Road

Thames Water are carrying out roadworks on Hillsboro Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 14:00 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 14:02.

UK Power Networks Eastern & London logo
LONG TERM
Between
11 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Wye Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Wye Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:54.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov 2024 and 8 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Drive

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Sep 2024 at 09:54.

Transport for London (TfL) logo
LONG TERM
Until
17 Jan 2025
Details
View Map
Share
Follow
Prince Of Wales Drive

Transport for London (TfL) are carrying out Highway repair and maintenance works on Prince Of Wales Drive, Battersea, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 10:10.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Sep 2024 at 11:48.

Transport for London (TfL) logo
LONG TERM
Between
11 Nov and 21 Dec 2024
Details
View Map
Share
Follow
Nine Elms Lane

Transport for London (TfL) are proposing to carry out Highway improvement works on Nine Elms Lane, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 21 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 2 Aug 2024 at 13:55.

Thames Water logo
LONG TERM
Between
12 Nov 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Limes Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Limes Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:55.

Thames Water logo
LONG TERM
Until
30 Apr 2025
Details
View Map
Share
Follow
Portland Road

Thames Water are carrying out roadworks on Portland Road, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 09:00 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 09:48.

Thames Water logo
LONG TERM
Between
12 Nov 2024 and 29 Apr 2025
Details
View Map
Share
Follow
Western Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Western Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 30 Aug 2024 at 22:55.

Thames Water logo
LONG TERM
Until
29 Apr 2025
Details
View Map
Share
Follow
Western Road

Thames Water are carrying out Disconnection or alteration of supply on Western Road, Mitcham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 November 2024 at 13:00 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 16:27.

Thames Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Balham Park Road

Thames Water are carrying out roadworks on Balham Park Road, Balham, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 11:00 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:54.

Thames Water logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Balham High Road

Thames Water are carrying out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 11:00 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 11:10.

LONG TERM
Between
13 Nov and 22 Dec 2024
Details
View Map
Share
New Cross Road

Last Mile Electricity (formerly Global Utility Connections) were proposing to carry out Utility repair and maintenance works on New Cross Road, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 November 2024 and run through until 22 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Nov 2024 at 14:42.

Thames Water logo
LONG TERM
Until
7 Jan 2025
Details
View Map
Share
Follow
Limes Avenue

Thames Water are carrying out Disconnection or alteration of supply on Limes Avenue, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 08:00 and could run through until 7 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 08:36.

Southern Gas Networks logo
Finishing
Today
Details
View Map
Share
Follow
Meteor Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Meteor Street, Battersea, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 November 2024 at 22:00 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Dec 2024 at 15:21.

Thames Water logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Lynwood Gardens

Thames Water are carrying out Disconnection or alteration of supply on Lynwood Gardens, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:30 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:36.

Thames Water logo
Until
18 Dec 2024
Details
View Map
Share
Follow
Arundel Road

Thames Water are carrying out Utility repair and maintenance works on Arundel Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 November 2024 at 09:02 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 10:42.

Southern Gas Networks logo
LONG TERM
Until
30 Dec 2024
Details
View Map
Share
Follow
Lavender Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Lavender Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 15:50 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 10:44.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Crusoe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crusoe Road, Mitcham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 21:04.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 23 Oct 2024 at 10:46.

London Borough Of Southwark logo
LONG TERM
Between
18 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Ilderton Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:55.

London Borough Of Southwark logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are carrying out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 00:00 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 09:58.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Benson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Benson Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:47.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Vicarage Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Vicarage Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:46.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 13 Jun 2025
Details
View Map
Share
Follow
Waddon Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Waddon Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:44.

Thames Water logo
LONG TERM
Between
19 Nov 2024 and 17 Feb 2025
Details
View Map
Share
Follow
Kemble Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kemble Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 13:46.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 17 Mar 2025
Details
View Map
Share
Follow
Avenue Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Avenue Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Mar 2024 at 14:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Portland Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 08:21.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Portland Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Oct 2024 at 09:14.

UK Power Networks Eastern & London logo
LONG TERM
Between
20 Nov 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Portland Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Portland Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 November 2024 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 11:46.

UK Power Networks Eastern & London logo
LONG TERM
Until
20 Feb 2025
Details
View Map
Share
Follow
Portland Street

UK Power Networks Eastern & London are carrying out Utility asset works on Portland Street, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 November 2024 at 08:00 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 08:11.

London Borough Of Southwark logo
LONG TERM
Between
22 Nov 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Hatcham Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Hatcham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Oct 2024 at 12:26.

London Borough Of Southwark logo
LONG TERM
Between
22 Nov 2024 and 16 Jan 2025
Details
View Map
Share
Follow
Hatcham Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Hatcham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 November 2024 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 18 Nov 2024 at 15:16.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Sefton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sefton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:00.

Southern Gas Networks logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Sefton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sefton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 16:23.

Electricity Network Company logo
Finishing
Sunday
Details
View Map
Share
Follow
Ravensbury Grove

Electricity Network Company are carrying out Utility asset works on Ravensbury Grove, Mitcham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 08:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 2 Dec 2024 at 15:52.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Trevelyan Road

Thames Water are proposing to carry out Utility asset works on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 May 2024 at 12:10.

Thames Water logo
Finishing
Sunday
Details
View Map
Share
Follow
Trevelyan Road

Thames Water are proposing to carry out Utility asset works on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Aug 2024 at 09:11.

Transport for London (TfL) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 15:14.

Transport for London (TfL) logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Christchurch Road

Transport for London (TfL) are carrying out Highway repair and maintenance works on Christchurch Road, St Martin's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Nov 2024 at 10:52.

Transport for London (TfL) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Hardel Rise

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Hardel Rise, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 10:48.

Transport for London (TfL) logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Hardel Rise

Transport for London (TfL) are carrying out Highway repair and maintenance works on Hardel Rise, St Martin's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Nov 2024 at 10:53.

Transport for London (TfL) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Tulse Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tulse Hill, St Martin's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 10:46.

Transport for London (TfL) logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Tulse Hill

Transport for London (TfL) are carrying out Highway repair and maintenance works on Tulse Hill, St Martin's, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Nov 2024 at 10:53.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:00 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 09:47.

UK Power Networks Eastern & London logo
LONG TERM
Until
14 Jan 2025
Details
View Map
Share
Follow
Wye Street

UK Power Networks Eastern & London are carrying out Utility asset works on Wye Street, Battersea, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 08:00 and could run through until 14 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 08:08.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Arklow Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 15:01.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Arklow Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 08:41.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Arklow Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 09:29.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Arklow Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 16:08.

UK Power Networks Eastern & London logo
Finishing
Monday
Details
View Map
Share
Follow
Arklow Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Arklow Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 09:24.

UK Power Networks Eastern & London logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Arklow Road

UK Power Networks Eastern & London are carrying out Utility asset works on Arklow Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 08:46.

London Borough Of Lambeth logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Montford Place

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Montford Place, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 5 Dec 2024 at 11:21.

London Borough Of Lambeth logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Montford Place

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Montford Place, Kennington, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 5 Dec 2024 at 11:21.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Crane Mead

Hertfordshire County Council are proposing to carry out Section 50 on Crane Mead, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 13:59.

Hertfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Crane Mead

Hertfordshire County Council were proposing to carry out Section 50 on Crane Mead, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 15 Nov 2024 at 14:04.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Balniel Gate

Cadent Gas are carrying out Utility repair and maintenance works on Balniel Gate, Tachbrook, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 10:00 and could run through until 13 December 2024. The works will impact the footpath only.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 10:20.

Finishing
Tomorrow
Details
View Map
Share
Follow
Rotherhithe New Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility repair and maintenance works on Rotherhithe New Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:00 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 6 Dec 2024 at 15:14.

Transport for London (TfL) logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 11:18.

London Borough Of Lambeth logo
LONG TERM
Until
8 Feb 2025
Details
View Map
Share
Follow
Hercules Road

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Hercules Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 08:30 and could run through until 8 February 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 25 Nov 2024 at 09:25.

Thames Water logo
LONG TERM
Between
26 Nov 2024 and 6 Jan 2025
Details
View Map
Share
Follow
Jennett Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Jennett Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 5 Jun 2024 at 09:36.

Thames Water logo
Monday
Details
View Map
Share
Kirkdale

Thames Water carried out Utility repair and maintenance works on Kirkdale, London.

The road was closed for some or all of the period.

The works were originally planned between 26 Nov 2024 and 16 Dec 2024 and were actually completed between 26 Nov 2024 (11:58) and 11 Dec 2024 (15:30). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 15:39.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Lewisham Road

Thames Water are carrying out Utility repair and maintenance works on Lewisham Road, Lewisham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 10:50 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 12:19.

Thames Water logo
Until
27 Dec 2024
Details
View Map
Share
Follow
Milford Gardens

Thames Water are carrying out Utility repair and maintenance works on Milford Gardens, Croydon.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 10:48 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:45.

Southern Gas Networks logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 08:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 12:16.

London Borough Of Sutton logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Wrythe Green Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Wrythe Green Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Nov 2024 at 15:56.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:02.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 16:24.

Southern Gas Networks logo
LONG TERM
Until
31 Jan 2025
Details
View Map
Share
Follow
Selwood Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Selwood Road, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 13:00 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 13:36.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Thornton Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Avenue, Thornton Heath, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 12:42.

Southern Gas Networks logo
Until
30 Dec 2024
Details
View Map
Share
Follow
Thornton Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Thornton Avenue, Thornton Heath, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 December 2024 at 13:00 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Dec 2024 at 13:40.

UK Power Networks Eastern & London logo
LONG TERM
Until
6 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 11:30 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 12:19.

Thames Water logo
LONG TERM
Until
5 Mar 2025
Details
View Map
Share
Follow
Northstead Road

Thames Water are carrying out Disconnection or alteration of supply on Northstead Road, St Martin's, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 11:30 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 11:46.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Carson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carson Road, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 15 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 09:42.

Southern Gas Networks logo
Until
18 Dec 2024
Details
View Map
Share
Follow
Cader Road

Southern Gas Networks are carrying out roadworks on Cader Road, Wandsworth, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 11:15 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 07:00.

London Borough Of Lambeth logo
Finishing
Friday
Details
View Map
Share
Kings Avenue

London Borough Of Lambeth were proposing to carry out Highway repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 19 Nov 2024 at 08:30.

London Borough Of Lewisham logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Lausanne Road

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Lausanne Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 12 Nov 2024 at 10:37.

London Borough Of Lewisham logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Lausanne Road

London Borough Of Lewisham are proposing to carry out Highway repair and maintenance works on Lausanne Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 28 Nov 2024 at 15:32.

Thames Water logo
LONG TERM
Between
2 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Southwark Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.

UK Power Networks Eastern & London logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Southwark Park Road

UK Power Networks Eastern & London are carrying out Statutory Infrastructure Works on Southwark Park Road, London.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 10:05.

UK Power Networks Eastern & London logo
Finishing
Friday
Details
View Map
Share
Follow
Victoria Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Aug 2024 at 14:03.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Pollards Hill North

Thames Water are carrying out New service connection on Pollards Hill North, Norbury, Croydon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 11:07 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 10:53.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Pollards Hill North

Thames Water were proposing to carry out New service connection on Pollards Hill North, Norbury, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 13 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 08:55.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Pollards Hill North

Thames Water are proposing to carry out New service connection on Pollards Hill North, Norbury, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 11:03.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Pollards Hill North

Thames Water were proposing to carry out New service connection on Pollards Hill North, Norbury, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 16:21.

Thames Water logo
Between
3 and 20 Dec 2024
Details
View Map
Share
Northstead Road

Thames Water were proposing to carry out roadworks on Northstead Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 07:47.

Thames Water logo
Between
3 and 20 Dec 2024
Details
View Map
Share
Northstead Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 13:51.

Thames Water logo
Between
3 and 20 Dec 2024
Details
View Map
Share
Kingsmead Road

Thames Water were proposing to carry out roadworks on Kingsmead Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2024 at 07:47.

Thames Water logo
Between
3 and 20 Dec 2024
Details
View Map
Share
Kingsmead Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Kingsmead Road, St Martin's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Sep 2024 at 13:51.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Clapham High Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Clapham High Street, Clapham Town, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 11:30 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 12:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Aug 2024 at 11:05.

UK Power Networks Eastern & London logo
LONG TERM
Between
4 Dec 2024 and 7 Jan 2025
Details
View Map
Share
Follow
Seward Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Seward Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 7 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:23.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Beauchamp Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Beauchamp Road, Upper Norwood, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 15:30 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 11:22.

Southern Gas Networks logo
Between
4 and 19 Dec 2024
Details
View Map
Share
Croydon Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 13:51.

Thames Water logo
Between
4 and 19 Dec 2024
Details
View Map
Share
Follow
Bell Green

Thames Water are proposing to carry out New service connection on Bell Green, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 09:16.

Thames Water logo
Until
19 Dec 2024
Details
View Map
Share
Follow
Bell Green

Thames Water are carrying out New service connection on Bell Green, London.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 10:49 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 10:50.

Royal Borough Of Kensington And Chelsea logo
Finishing
Saturday
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are carrying out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 December 2024 at 20:00 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Dec 2024 at 08:50.

Electricity Network Company logo
Between
5 and 18 Dec 2024
Details
View Map
Share
Follow
Kennington Road

Electricity Network Company are proposing to carry out Utility asset works on Kennington Road, Kennington, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 12 Sep 2024 at 12:49.

Thames Water logo
Until
27 Dec 2024
Details
View Map
Share
Follow
Whitehorse Lane

Thames Water are carrying out Utility repair and maintenance works on Whitehorse Lane, South Norwood, Croydon.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 09:10 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Dec 2024 at 09:36.

Thames Water logo
Until
27 Dec 2024
Details
View Map
Share
Follow
Farnley Road

Thames Water are carrying out Utility repair and maintenance works on Farnley Road, South Norwood, Croydon.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 09:10 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 10:57.

Thames Water logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Northstead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Northstead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:56.

Thames Water logo
Between
5 and 20 Dec 2024
Details
View Map
Share
Follow
Kingsmead Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:56.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Clapham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Clapham Road, Oval, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 14:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 12:13.

ESP Electricity logo
Finishing
Today
Details
View Map
Share
Follow
Bramwell Place

ESP Electricity are proposing to carry out Utility asset works on Bramwell Place, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 12 Sep 2024 at 15:03.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Friday
Details
View Map
Share
Follow
The Bridle Way

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on The Bridle Way, Wallington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Sep 2024 at 13:35.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Friday
Details
View Map
Share
Follow
The Bridle Way

Ses Water (formerly Sutton & East Surrey Water Company) are carrying out New service connection on The Bridle Way, Wallington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:52 and could run through until 13 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 9 Dec 2024 at 09:30.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Compton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Compton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:01.

Thames Water logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Upper Elmers End Road

Thames Water are carrying out Utility repair and maintenance works on Upper Elmers End Road, Beckenham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 10:31 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Dec 2024 at 14:42.

Thames Water logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Lloyds Way

Thames Water are carrying out roadworks on Lloyds Way, Beckenham.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 10:31 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Dec 2024 at 14:42.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Elmhurst Avenue

Thames Water are proposing to carry out New service connection on Elmhurst Avenue, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Sep 2024 at 15:47.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Elmhurst Avenue

Thames Water are carrying out New service connection on Elmhurst Avenue, Mitcham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 11:14 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 14:59.

London Borough Of Lambeth logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Voss Court

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Voss Court, Streatham Common & Vale, London.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Dec 2024 at 13:44.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Crystal Palace Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Crystal Palace Park Road, Sydenham.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 13:55 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 14:05.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Lansdowne Hill

Thames Water were proposing to carry out New service connection on Lansdowne Hill, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Sep 2024 at 08:39.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Torridon Road

Thames Water are proposing to carry out Utility asset works on Torridon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 15:35.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Torridon Road

Thames Water are proposing to carry out Utility asset works on Torridon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 16:07.

Thames Water logo
Today
Details
View Map
Share
Torridon Road

Thames Water carried out Utility asset works on Torridon Road, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 9 Dec 2024 and 11 Dec 2024 and were actually completed between 9 Dec 2024 (22:00) and 11 Dec 2024 (05:30). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 08:07.

Thames Water logo
Today
Details
View Map
Share
Dowanhill Road

Thames Water carried out Utility asset works on Dowanhill Road, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 9 Dec 2024 and 11 Dec 2024 and were actually completed between 9 Dec 2024 (22:00) and 11 Dec 2024 (05:30). The works impacted the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 08:07.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Mexfield Road

Thames Water are proposing to carry out New service connection on Mexfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Sep 2024 at 10:07.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Mexfield Road

Thames Water were proposing to carry out New service connection on Mexfield Road, Wandsworth, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 17 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 09:36.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
The Gardens

Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 18:08.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
The Gardens

Southern Gas Networks are proposing to carry out New service connection on The Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 15:14.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
The Gardens

Southern Gas Networks are carrying out New service connection on The Gardens, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 10:27 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 10:28.

London Borough Of Lambeth logo
Finishing
Today
Details
View Map
Share
Follow
Union Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Union Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 3 Dec 2024 at 08:37.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Queens Road

Thames Water are carrying out Utility repair and maintenance works on Queens Road, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 20:33 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 11:21.

London Borough Of Southwark logo
Today
Details
View Map
Share
Southampton Way

London Borough Of Southwark carried out Highway improvement works on Southampton Way, London.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 9 Dec 2024 and 11 Dec 2024 and were actually completed between 9 Dec 2024 (20:00) and 11 Dec 2024 (05:00). The works impacted the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Dec 2024 at 08:57.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 10 Oct 2024 at 11:34.

UK Power Networks Eastern & London logo
Between
9 and 31 Dec 2024
Details
View Map
Share
Follow
Edward Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 08:33.

UK Power Networks Eastern & London logo
Between
9 and 31 Dec 2024
Details
View Map
Share
Follow
Edward Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 21 Nov 2024 at 16:10.

UK Power Networks Eastern & London logo
Between
9 and 31 Dec 2024
Details
View Map
Share
Follow
Edward Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 26 Nov 2024 at 09:21.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 15 Oct 2024 at 08:35.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Hornshay Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:03.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 24 Sep 2024 at 12:19.

London Borough Of Southwark logo
LONG TERM
Between
9 Dec 2024 and 30 Apr 2025
Details
View Map
Share
Hornshay Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Hornshay Street, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 18 Sep 2024 at 15:32.

London Borough Of Lambeth logo
LONG TERM
Between
9 Dec 2024 and 6 Feb 2025
Details
View Map
Share
Follow
Wandsworth Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 5 Sep 2024 at 12:39.

London Borough Of Lambeth logo
Finishing
Monday
Details
View Map
Share
Follow
Wandsworth Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 5 Sep 2024 at 12:40.

Thames Water logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Oakley Street

Thames Water are carrying out Utility repair and maintenance works on Oakley Street, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 08:45 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 09:44.

LONG TERM
Between
9 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Raymouth Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Raymouth Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 24 Sep 2024 at 14:31.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Horseferry Road

Thames Water are carrying out Utility repair and maintenance works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 11:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Dec 2024 at 11:39.

Virgin Media logo
Between
9 and 23 Dec 2024
Details
View Map
Share
Hans Place

Virgin Media were proposing to carry out Utility asset works on Hans Place, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 10 Dec 2024 at 09:08.

Murphy Power Distribution logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Copperfield Street

Murphy Power Distribution are proposing to carry out New service connection on Copperfield Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 11 Oct 2024 at 11:32.

Murphy Power Distribution logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Copperfield Street

Murphy Power Distribution are carrying out New service connection on Copperfield Street, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 09:05 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 9 Dec 2024 at 09:59.

London Borough Of Merton logo
Finishing
Friday
Details
View Map
Share
Follow
The Broadway

London Borough Of Merton are proposing to carry out Statutory Infrastructure Works on The Broadway, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Merton on 14 Nov 2024 at 11:35.

Virgin Media logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Jasper Road

Virgin Media are proposing to carry out Utility asset works on Jasper Road, Gipsy Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 9 Sep 2024 at 08:41.

Virgin Media logo
Finishing
Tomorrow
Details
View Map
Share
Jasper Road

Virgin Media were proposing to carry out Utility asset works on Jasper Road, Gipsy Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 21 Nov 2024 at 12:56.

Virgin Media logo
Finishing
Tomorrow
Details
View Map
Share
Jasper Road

Virgin Media were proposing to carry out Utility asset works on Jasper Road, Gipsy Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 25 Nov 2024 at 10:52.

Virgin Media logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Jasper Road

Virgin Media are carrying out Utility asset works on Jasper Road, Gipsy Hill, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 21:00 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 11 Dec 2024 at 08:40.

Southern Gas Networks logo
Until
23 Dec 2024
Details
View Map
Share
Follow
Summerley Street

Southern Gas Networks are carrying out Utility repair and maintenance works on Summerley Street, Earlsfield, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 08:00 and could run through until 23 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 14:47.

London Borough Of Lambeth logo
Until
21 Dec 2024
Details
View Map
Share
Follow
Thorncliffe Road

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Thorncliffe Road, Clapham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 11 Dec 2024 at 09:08.

London Borough Of Lambeth logo
Until
21 Dec 2024
Details
View Map
Share
Follow
Thornbury Road

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Thornbury Road, Clapham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 11 Dec 2024 at 09:07.

London Borough Of Lambeth logo
Until
21 Dec 2024
Details
View Map
Share
Follow
Rosebery Road

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Rosebery Road, Clapham Park, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 11 Dec 2024 at 09:06.

London Borough Of Lambeth logo
Finishing
Friday
Details
View Map
Share
Follow
Lynette Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lynette Avenue, Clapham Common & Abbeville, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 2 Dec 2024 at 16:33.

London Borough Of Lambeth logo
Until
21 Dec 2024
Details
View Map
Share
Follow
Kings Avenue

London Borough Of Lambeth are carrying out Highway repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 20:00 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 11 Dec 2024 at 09:04.

London Borough Of Southwark logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Evelina Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Evelina Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 18 Nov 2024 at 14:55.

London Borough Of Southwark logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Evelina Road

London Borough Of Southwark are carrying out Highway repair and maintenance works on Evelina Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 20:00 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 11 Dec 2024 at 08:58.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Parthenia Road

Thames Water are proposing to carry out Utility repair and maintenance works on Parthenia Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 11:18.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Parthenia Road

Thames Water are carrying out Utility repair and maintenance works on Parthenia Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 07:17 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 08:16.

London Borough Of Southwark logo
LONG TERM
Between
10 Dec 2024 and 25 Jan 2025
Details
View Map
Share
Ilderton Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 December 2024 and run through until 25 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 10:44.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Fulham Road

Cadent Gas are carrying out Utility repair and maintenance works on Fulham Road, London.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 10:06 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 12:53.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Ifield Road

Cadent Gas are carrying out Utility repair and maintenance works on Ifield Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 December 2024 at 08:23 and could run through until 16 December 2024. The works will impact the carriageway and footpath.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 13:00.

Southern Gas Networks logo
LONG TERM
Between
10 Dec 2024 and 28 Jan 2025
Details
View Map
Share
Follow
Miles Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Miles Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Sep 2024 at 11:13.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Elsinore Road

Thames Water are carrying out Utility repair and maintenance works on Elsinore Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 11:28 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 11:30.

Thames Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Buer Road

Thames Water are carrying out Utility repair and maintenance works on Buer Road, London.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 22:42 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 22:42.

Thames Water logo
Finishing
Saturday
Details
View Map
Share
Follow
Albyn Road

Thames Water are proposing to carry out Utility asset works on Albyn Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 09:03.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Rostrevor Road

Thames Water are proposing to carry out Utility repair and maintenance works on Rostrevor Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:58.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Rostrevor Road

Thames Water are carrying out Utility repair and maintenance works on Rostrevor Road, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 08:27 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 08:28.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Galleywall Road

Thames Water are carrying out Utility repair and maintenance works on Galleywall Road, London.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 22:00 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 21:35.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Ebury Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Ebury Street, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 4 Dec 2024 at 11:52.

City Of Westminster logo
Finishing
Friday
Details
View Map
Share
Follow
Ebury Street

City Of Westminster are carrying out Highway repair and maintenance works on Ebury Street, Warwick, London.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 December 2024 at 08:00 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 11 Dec 2024 at 08:38.

Royal Borough Of Kensington And Chelsea logo
Between
11 and 21 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 10 Oct 2024 at 15:57.

Royal Borough Of Kensington And Chelsea logo
Between
11 and 21 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 16 Oct 2024 at 16:05.

UK Power Networks Eastern & London logo
Between
12 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Edward Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Edward Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 3 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Dec 2024 at 15:37.

Thames Water logo
Between
13 and 19 Dec 2024
Details
View Map
Share
Follow
Epsom Road

Thames Water are proposing to carry out Utility repair and maintenance works on Epsom Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 13:09.

Thames Water logo
Between
13 and 19 Dec 2024
Details
View Map
Share
Follow
Epsom Road

Thames Water are proposing to carry out Utility repair and maintenance works on Epsom Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Oct 2024 at 15:34.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Chetwode Road

Southern Gas Networks are proposing to carry out roadworks on Chetwode Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 12:59.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Chetwode Road

Southern Gas Networks are proposing to carry out New service connection on Chetwode Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 15:14.

Southern Gas Networks logo
Finishing
Sunday
Details
View Map
Share
Follow
Chetwode Road

Southern Gas Networks are proposing to carry out New service connection on Chetwode Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 12:49.

Transport for London (TfL) logo
Finishing
Sunday
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 15:06.

Transport for London (TfL) logo
Finishing
Sunday
Details
View Map
Share
New Kent Road

Transport for London (TfL) were proposing to carry out Highway improvement works on New Kent Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 15 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 15:19.

Transport for London (TfL) logo
Finishing
Sunday
Details
View Map
Share
Follow
St Thomas Street

Transport for London (TfL) are proposing to carry out Highway improvement works on St Thomas Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 9 Dec 2024 at 14:35.

Virgin Media logo
Finishing
Monday
Details
View Map
Share
Borough High Street

Virgin Media were proposing to carry out Utility asset works on Borough High Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 28 Aug 2024 at 15:14.

London Borough Of Southwark logo
LONG TERM
Between
13 Dec 2024 and 31 Mar 2025
Details
View Map
Share
Omeara Street

London Borough Of Southwark were proposing to carry out Highway improvement works on Omeara Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Dec 2024 at 13:22.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Trundleys Road

Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Oct 2024 at 09:14.

Network Rail logo
Finishing
Monday
Details
View Map
Share
Follow
Trundleys Road

Network Rail are proposing to carry out Works for Rail Purposes on Trundleys Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 15 Nov 2024 at 15:58.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Dec 2024 and 3 Feb 2025
Details
View Map
Share
Follow
Beddington Farm Road

UK Power Networks South Eastern are proposing to carry out New service connection on Beddington Farm Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2024 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 28 Oct 2024 at 10:51.

Vodafone logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
London Road

Vodafone are proposing to carry out Utility repair and maintenance works on London Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Vodafone on 16 Sep 2024 at 15:16.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Natal Road

Thames Water are proposing to carry out Utility repair and maintenance works on Natal Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 10:51.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Natal Road

Thames Water are proposing to carry out Utility repair and maintenance works on Natal Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 15:44.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Natal Road

Thames Water are proposing to carry out Utility repair and maintenance works on Natal Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:57.

Transport for London (TfL) logo
Between
16 Dec 2024 and 11 Jan 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 11 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Nov 2024 at 16:10.

Transport for London (TfL) logo
Between
16 Dec 2024 and 11 Jan 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 11 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Dec 2024 at 09:46.

Transport for London (TfL) logo
Between
16 Dec 2024 and 11 Jan 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 11 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 10:52.

Transport for London (TfL) logo
Between
16 Dec 2024 and 11 Jan 2025
Details
View Map
Share
Follow
Streatham High Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Streatham High Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 11 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 15:55.

Southern Gas Networks logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Salehurst Road

Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Sep 2024 at 11:13.

Southern Gas Networks logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Salehurst Road

Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 11:31.

Southern Gas Networks logo
Between
16 and 23 Dec 2024
Details
View Map
Share
Follow
Salehurst Road

Southern Gas Networks are proposing to carry out New service connection on Salehurst Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 13:34.

Thames Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Horseferry Road

Thames Water are proposing to carry out Utility repair and maintenance works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:31.

Thames Water logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Horseferry Road

Thames Water are proposing to carry out Utility repair and maintenance works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 08:53.

Thames Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Lambeth Walk

Thames Water were proposing to carry out New service connection on Lambeth Walk, Kennington, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 19 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 13:47.

UK Power Networks Eastern & London logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Sondes Street

UK Power Networks Eastern & London were proposing to carry out roadworks on Sondes Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:16.

UK Power Networks Eastern & London logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Sondes Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Sondes Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:30.

Royal Borough Of Kensington And Chelsea logo
Between
17 and 21 Dec 2024
Details
View Map
Share
Follow
Sloane Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway improvement works on Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 25 Sep 2024 at 14:35.

Thames Water logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Follow
Brownhill Road

Thames Water are proposing to carry out New service connection on Brownhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 17:38.

Hyperoptic logo
Between
17 and 19 Dec 2024
Details
View Map
Share
Grimston Road

Hyperoptic were proposing to carry out Utility asset works on Grimston Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 December 2024 and run through until 19 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 14 Nov 2024 at 11:39.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 24 Sep 2024 at 14:05.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 27 Sep 2024 at 08:29.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 4 Oct 2024 at 08:46.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 24 Sep 2024 at 14:07.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 27 Sep 2024 at 08:23.

ESP Electricity logo
Between
17 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 1 Oct 2024 at 14:38.

UK Power Networks Eastern & London logo
LONG TERM
Between
18 Dec 2024 and 19 Feb 2025
Details
View Map
Share
Follow
Ingrave Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Ingrave Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:52.

Transport for London (TfL) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Surrey Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Surrey Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 15:50.

Transport for London (TfL) logo
Between
18 and 20 Dec 2024
Details
View Map
Share
Follow
Surrey Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Surrey Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 08:35.

Thames Water logo
Between
18 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Cole Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cole Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 December 2024 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 13:35.

Thames Water logo
Between
23 and 30 Dec 2024
Details
View Map
Share
Carlyle Square

Thames Water were proposing to carry out New service connection on Carlyle Square, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 30 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 13:12.

Thames Water logo
Between
23 and 30 Dec 2024
Details
View Map
Share
Follow
Carlyle Square

Thames Water are proposing to carry out New service connection on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Sep 2024 at 15:56.

Thames Water logo
Between
23 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Carnwath Road

Thames Water were proposing to carry out New service connection on Carnwath Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 2 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 15:40.

ESP Electricity logo
Between
24 Dec 2024 and 9 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 10:14.

ESP Electricity logo
Between
26 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Clyston Street

ESP Electricity are proposing to carry out Utility asset works on Clyston Street, Larkhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 11:49.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Streatham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Streatham Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 07:28.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Streatham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Streatham Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 15:22.

Southern Gas Networks logo
Between
27 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Swains Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swains Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 14:42.

Southern Gas Networks logo
Between
27 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Swains Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swains Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 22:43.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Brixton Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 11:05.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Brixton Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 12:00.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Brixton Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Brixton Hill, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 13:30.

Thames Water logo
Between
27 and 30 Dec 2024
Details
View Map
Share
Follow
Clapham High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 December 2024 and could run through until 30 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:01.

Transport for London (TfL) logo
Between
28 Dec 2024 and 11 Jan 2025
Details
View Map
Share
Streatham High Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Streatham High Road, Streatham St Leonard's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 December 2024 and run through until 11 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 27 Nov 2024 at 16:16.

Transport for London (TfL) logo
Between
28 Dec 2024 and 11 Jan 2025
Details
View Map
Share
Follow
Gracefield Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Gracefield Gardens, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 11 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 09:22.

Transport for London (TfL) logo
Between
28 Dec 2024 and 11 Jan 2025
Details
View Map
Share
Follow
Gracefield Gardens

Transport for London (TfL) are proposing to carry out Highway improvement works on Gracefield Gardens, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 December 2024 and could run through until 11 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 10:01.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Rochford Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Rochford Way, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 14:11.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Springfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:48.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Springfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:24.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Springfield Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 12:50.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 30 Mar 2025
Details
View Map
Share
Follow
Selkirk Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selkirk Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 07:17.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Thorncliffe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 09:59.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Thorncliffe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 13:17.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Thorncliffe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thorncliffe Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Kings Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 11:00.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Apr 2025
Details
View Map
Share
Heathfield Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 27 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:17.

Transport for London (TfL) logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:46.

Transport for London (TfL) logo
Between
2 and 6 Jan 2025
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 6 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 12:51.

Transport for London (TfL) logo
Between
2 and 8 Jan 2025
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 16 Oct 2024 at 12:47.

Transport for London (TfL) logo
Between
2 and 8 Jan 2025
Details
View Map
Share
Follow
Brompton Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Brompton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 13 Nov 2024 at 12:50.

Transport for London (TfL) logo
Between
3 and 5 Jan 2025
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on New Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 5 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 29 Oct 2024 at 15:07.

Transport for London (TfL) logo
Between
3 and 5 Jan 2025
Details
View Map
Share
New Kent Road

Transport for London (TfL) were proposing to carry out Highway improvement works on New Kent Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 January 2025 and run through until 5 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 15:19.

London Borough Of Lambeth logo
LONG TERM
Between
3 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Crownstone Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Crownstone Road, Brixton Rush Common, London.

These works are categorised as Major.

The works will start on or after 3 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lambeth on 4 Oct 2024 at 13:01.

Thames Water logo
Between
3 and 5 Jan 2025
Details
View Map
Share
Follow
Clapham High Street

Thames Water are proposing to carry out Utility repair and maintenance works on Clapham High Street, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 5 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 14:45.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Oct 2024 at 10:20.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 23 Oct 2024 at 12:19.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 11:24.

UK Power Networks South Eastern logo
Between
4 and 25 Jan 2025
Details
View Map
Share
Follow
Stafford Road

UK Power Networks South Eastern are proposing to carry out New service connection on Stafford Road, Croydon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 25 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 18 Nov 2024 at 11:52.

Transport for London (TfL) logo
Between
4 and 6 Jan 2025
Details
View Map
Share
Tooting High Street

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Tooting High Street, Tooting, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 January 2025 and run through until 6 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 10:54.

Transport for London (TfL) logo
Between
4 and 6 Jan 2025
Details
View Map
Share
Follow
Tooting High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 11:03.

Transport for London (TfL) logo
Between
4 and 6 Jan 2025
Details
View Map
Share
Follow
Mitcham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Mitcham Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 11:03.

Transport for London (TfL) logo
Between
4 and 6 Jan 2025
Details
View Map
Share
Follow
Garratt Lane

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Garratt Lane, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 6 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 11:03.

ESP Electricity logo
Between
4 and 12 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 2 Oct 2024 at 14:12.

Thames Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Lodge Avenue

Thames Water were proposing to carry out Disconnection or alteration of supply on Lodge Avenue, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 11:45.

Thames Water logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Wandle Side

Thames Water were proposing to carry out Disconnection or alteration of supply on Wandle Side, Croydon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 12:46.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Beddington Farm Road

UK Power Networks South Eastern are proposing to carry out New service connection on Beddington Farm Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 9 Dec 2024 at 13:25.

UK Power Networks South Eastern logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Ampere Way

UK Power Networks South Eastern are proposing to carry out New service connection on Ampere Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:56.

UK Power Networks South Eastern logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:54.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Mitcham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mitcham Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 16:07.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:45.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Bordergate

Southern Gas Networks are proposing to carry out New service connection on Bordergate, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 08:00.

Southern Gas Networks logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Bordergate

Southern Gas Networks are proposing to carry out New service connection on Bordergate, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 17:35.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Southdown Road

Thames Water are proposing to carry out Utility asset works on Southdown Road, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Oct 2024 at 08:34.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 1 Jun 2025
Details
View Map
Share
Follow
Bridgewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridgewood Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 14 Aug 2024 at 15:27.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 1 Jun 2025
Details
View Map
Share
Follow
Bridgewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridgewood Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 12:43.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 1 Jun 2025
Details
View Map
Share
Follow
Bridgewood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bridgewood Road, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 10:58.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Pitcairn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pitcairn Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 22:47.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Pitcairn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Pitcairn Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 08:05.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Swains Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Swains Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 17:00.

London Borough Of Merton logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Grenfell Road

London Borough Of Merton are proposing to carry out Highway improvement works on Grenfell Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 13 Nov 2024 at 15:52.

London Borough Of Merton logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Grenfell Road

London Borough Of Merton are proposing to carry out Highway improvement works on Grenfell Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 4 Dec 2024 at 16:52.

Thames Water logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Voss Court

Thames Water are proposing to carry out New service connection on Voss Court, Streatham Common & Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Sep 2024 at 14:59.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 10:55.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 10:12.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Oct 2024 at 09:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 24 Oct 2024 at 09:31.

London Borough Of Merton logo
Between
6 and 16 Jan 2025
Details
View Map
Share
Follow
Haydon Park Road

London Borough Of Merton are proposing to carry out Highway improvement works on Haydon Park Road, Wimbledon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 14 Nov 2024 at 15:46.

London Borough Of Merton logo
Between
6 and 16 Jan 2025
Details
View Map
Share
Follow
Haydon Park Road

London Borough Of Merton are proposing to carry out Highway improvement works on Haydon Park Road, Wimbledon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 18 Nov 2024 at 08:10.

London Borough Of Merton logo
Between
6 and 16 Jan 2025
Details
View Map
Share
Follow
Haydon Park Road

London Borough Of Merton are proposing to carry out Highway improvement works on Haydon Park Road, Wimbledon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 18 Nov 2024 at 14:45.

UK Power Networks Eastern & London logo
LONG TERM
Between
6 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Kirkdale

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Kirkdale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 08:11.

Thames Water logo
LONG TERM
Between
6 Jan and 23 Mar 2025
Details
View Map
Share
Follow
Balham High Road

Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 May 2024 at 08:52.

Thames Water logo
LONG TERM
Between
6 Jan and 23 Mar 2025
Details
View Map
Share
Follow
Balham High Road

Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2024 at 10:25.

Thames Water logo
LONG TERM
Between
6 Jan and 23 Mar 2025
Details
View Map
Share
Balham High Road

Thames Water were proposing to carry out Utility asset works on Balham High Road, Balham, London.

These works were categorised as Major.

The works were originally planned to start 6 January 2025 and run through until 23 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 10:19.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 23 Mar 2025
Details
View Map
Share
Penwith Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Penwith Road, Southfields, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 23 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:07.

Southern Gas Networks logo
Between
6 Jan and 2 Feb 2025
Details
View Map
Share
Garratt Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 2 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 11:08.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Heathfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Heathfield Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Apr 2024 at 13:46.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Kelvington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kelvington Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:54.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Kelvington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kelvington Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 15:13.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Kelvington Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kelvington Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 12:26.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Athenlay Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Athenlay Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:43.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Athenlay Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Athenlay Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 08:44.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Comerford Road

Thames Water are proposing to carry out Utility asset works on Comerford Road, Crofton Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:33.

Network Rail logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Brixton Station Road

Network Rail are proposing to carry out roadworks on Brixton Station Road, Brixton Windrush, London.

These works are categorised as Major.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Dec 2024 at 13:08.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Cottage Grove

Thames Water are proposing to carry out New service connection on Cottage Grove, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Sep 2024 at 09:52.

Thames Water logo
LONG TERM
Between
6 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Linden Grove

Thames Water are proposing to carry out Utility repair and maintenance works on Linden Grove, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 10:03.

London Borough Of Lewisham logo
LONG TERM
Between
6 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Malpas Road

London Borough Of Lewisham are proposing to carry out Highway improvement works on Malpas Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Lewisham on 2 Dec 2024 at 10:23.

UK Power Networks Eastern & London logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Rowditch Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Rowditch Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 14:37.

UK Power Networks Eastern & London logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Rowditch Lane

UK Power Networks Eastern & London are proposing to carry out New service connection on Rowditch Lane, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 15:44.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Deptford Broadway

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Deptford Broadway, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:33.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 17:35.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
New Cross Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Cross Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Oct 2024 at 14:34.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Parkfield Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Sep 2024 at 16:09.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Parkfield Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkfield Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:36.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Alpha Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Alpha Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 30 Aug 2024 at 12:21.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Amersham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 27 Sep 2024 at 09:13.

Transport for London (TfL) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Amersham Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Amersham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Oct 2024 at 15:44.

Transport for London (TfL) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Battersea Bridge Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 12:50.

Transport for London (TfL) logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Battersea Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Battersea Bridge Road, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:05.

London Borough Of Wandsworth logo
LONG TERM
Between
6 Jan and 19 Mar 2025
Details
View Map
Share
Follow
Elcho Street

London Borough Of Wandsworth are proposing to carry out Section 50 on Elcho Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 11 Dec 2024 at 10:59.

London Borough Of Wandsworth logo
LONG TERM
Between
6 Jan and 19 Mar 2025
Details
View Map
Share
Follow
Elcho Street

London Borough Of Wandsworth are proposing to carry out Section 50 on Elcho Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Wandsworth on 11 Dec 2024 at 11:00.

Southern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Carroun Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Oct 2024 at 08:15.

Southern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Carroun Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 08:29.

Southern Gas Networks logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Carroun Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carroun Road, Oval, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 10:56.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Lower Sloane Street

Cadent Gas are proposing to carry out Utility asset works on Lower Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 13:00.

Cadent Gas logo
LONG TERM
Between
6 Jan and 26 Mar 2025
Details
View Map
Share
Follow
Sloane Square

Cadent Gas are proposing to carry out Utility asset works on Sloane Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:09.

City Of Westminster logo
LONG TERM
Between
6 Jan and 4 Apr 2025
Details
View Map
Share
Follow
Warwick Way

City Of Westminster are proposing to carry out Highway repair and maintenance works on Warwick Way, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of Westminster on 28 Nov 2024 at 14:34.

Thames Water logo
Between
6 and 26 Jan 2025
Details
View Map
Share
Follow
Guildhouse Street

Thames Water are proposing to carry out Utility asset works on Guildhouse Street, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 26 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 9 Dec 2024 at 12:51.

Transport for London (TfL) logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 16:08.

Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Ebury Street

Stark Infra – Electric are proposing to carry out Utility asset works on Ebury Street, Warwick, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Stark Infra – Electric on 11 Nov 2024 at 12:12.

Cadent Gas logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Alexander Place

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Alexander Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 14:05.

Cadent Gas logo
LONG TERM
Between
6 Jan and 15 Feb 2025
Details
View Map
Share
Great College Street

Cadent Gas were proposing to carry out Utility asset works on Great College Street, St James's, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 15 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 13:01.

Cadent Gas logo
LONG TERM
Between
6 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Great Peter Street

Cadent Gas are proposing to carry out Utility asset works on Great Peter Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 15 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:42.

Thames Water logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Pont Street

Thames Water are proposing to carry out Utility asset works on Pont Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 15:16.

Thames Water logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Pont Street

Thames Water are proposing to carry out Utility asset works on Pont Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 12:38.

Cadent Gas logo
LONG TERM
Between
6 Jan and 12 Apr 2025
Details
View Map
Share
Follow
Storey's Gate

Cadent Gas are proposing to carry out Utility asset works on Storey's Gate, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.

UK Power Networks Eastern & London logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Parliament Square

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Parliament Square, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Nov 2024 at 13:51.

Cadent Gas logo
LONG TERM
Between
6 Jan and 12 Apr 2025
Details
View Map
Share
Follow
Matthew Parker Street

Cadent Gas are proposing to carry out Utility asset works on Matthew Parker Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.

London Borough Of Southwark logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Bermondsey Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Bermondsey Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 25 Oct 2024 at 06:54.

London Borough Of Southwark logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Tanner Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Tanner Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 08:28.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Gray Street

Thames Water are proposing to carry out Utility repair and maintenance works on Gray Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:14.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Gray Street

Thames Water are proposing to carry out Utility repair and maintenance works on Gray Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 13:31.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Gray Street

Thames Water are proposing to carry out Utility repair and maintenance works on Gray Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Dec 2024 at 12:30.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 12:15.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 10 Sep 2024 at 15:28.

London Borough Of Lambeth logo
LONG TERM
Between
6 Jan and 30 Jun 2025
Details
View Map
Share
Follow
Belvedere Road

London Borough Of Lambeth are proposing to carry out Highway improvement works on Belvedere Road, Multiple Wards, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by London Borough Of Lambeth on 11 Sep 2024 at 09:49.

City Of Westminster logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Northumberland Avenue

City Of Westminster are proposing to carry out Highway repair and maintenance works on Northumberland Avenue, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 13 Nov 2024 at 09:34.

London Borough Of Southwark logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Bear Lane

London Borough Of Southwark are proposing to carry out Highway improvement works on Bear Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 3 Dec 2024 at 11:05.

Thames Water logo
LONG TERM
Between
7 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Courtney Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Courtney Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 08:58.

Thames Water logo
LONG TERM
Between
7 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Benson Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Benson Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 12:57.

Thames Water logo
Between
7 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Wandle Side

Thames Water are proposing to carry out Disconnection or alteration of supply on Wandle Side, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 06:26.

Thames Water logo
LONG TERM
Between
7 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Jennett Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Jennett Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 06:26.

Transport for London (TfL) logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Becmead Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Becmead Avenue, Brixton Windrush, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 09:21.

Transport for London (TfL) logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Becmead Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Becmead Avenue, Brixton Windrush, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 10:01.

Thames Water logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Melon Road

Thames Water are proposing to carry out New service connection on Melon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 13:58.

Thames Water logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Melon Road

Thames Water were proposing to carry out New service connection on Melon Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 16:01.

Thames Water logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Melon Road

Thames Water are proposing to carry out New service connection on Melon Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 12:01.

Hyperoptic logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Hestercombe Avenue

Hyperoptic are proposing to carry out Utility asset works on Hestercombe Avenue, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 11 Nov 2024 at 11:58.

Southern Gas Networks logo
LONG TERM
Between
9 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 15:13.

Transport for London (TfL) logo
Between
9 and 12 Jan 2025
Details
View Map
Share
Follow
Pendennis Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pendennis Road, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 12 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 09:22.

Transport for London (TfL) logo
Between
9 and 12 Jan 2025
Details
View Map
Share
Follow
Pendennis Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Pendennis Road, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 12 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 10:00.

Transport for London (TfL) logo
Between
9 and 12 Jan 2025
Details
View Map
Share
Follow
Leigham Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Leigham Avenue, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 12 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 09:22.

Transport for London (TfL) logo
Between
9 and 12 Jan 2025
Details
View Map
Share
Follow
Leigham Avenue

Transport for London (TfL) are proposing to carry out Highway improvement works on Leigham Avenue, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 12 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 10:00.

Transport for London (TfL) logo
LONG TERM
Between
9 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Parkgate Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkgate Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 6 Sep 2024 at 10:42.

Transport for London (TfL) logo
LONG TERM
Between
9 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Westbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westbridge Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Sep 2024 at 14:36.

Transport for London (TfL) logo
LONG TERM
Between
9 Jan and 26 Mar 2025
Details
View Map
Share
Follow
Redcliffe Gardens

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 16:15.

Transport for London (TfL) logo
LONG TERM
Between
9 Jan and 26 Mar 2025
Details
View Map
Share
Follow
Fawcett Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Fawcett Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 16:39.

Transport for London (TfL) logo
LONG TERM
Between
9 Jan and 26 Mar 2025
Details
View Map
Share
Follow
Tregunter Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Tregunter Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 16:39.

Transport for London (TfL) logo
LONG TERM
Between
9 Jan and 26 Mar 2025
Details
View Map
Share
Follow
Redcliffe Square

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Redcliffe Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 26 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Nov 2024 at 16:27.

Thames Water logo
Between
10 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Southwark Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 8 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.

Thames Water logo
Between
10 and 13 Jan 2025
Details
View Map
Share
Follow
Pawsons Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pawsons Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:33.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Beaford Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:43.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Beaford Grove

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Beaford Grove, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:20.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Buckleigh Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckleigh Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:42.

Southern Gas Networks logo
LONG TERM
Between
10 Jan and 17 Feb 2025
Details
View Map
Share
Follow
Buckleigh Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Buckleigh Avenue, Raynes Park.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 January 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:23.

Thames Water logo
Between
11 and 16 Jan 2025
Details
View Map
Share
Follow
Willett Place

Thames Water are proposing to carry out New service connection on Willett Place, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:15.

Thames Water logo
Between
11 and 16 Jan 2025
Details
View Map
Share
Follow
Willett Place

Thames Water are proposing to carry out New service connection on Willett Place, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 16:34.

Thames Water logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Clapham Park Road

Thames Water are proposing to carry out New service connection on Clapham Park Road, Clapham East, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 13:14.

Thames Water logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Clapham Park Road

Thames Water were proposing to carry out New service connection on Clapham Park Road, Clapham East, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 January 2025 and run through until 19 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 15:28.

Thames Water logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Clapham Park Road

Thames Water are proposing to carry out New service connection on Clapham Park Road, Clapham East, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 13:29.

Thames Water logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
St Alphonsus Road

Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 10:39.

Thames Water logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
St Alphonsus Road

Thames Water are proposing to carry out Utility asset works on St Alphonsus Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:17.

ESP Electricity logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 14 Oct 2024 at 13:55.

ESP Electricity logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 3 Oct 2024 at 08:37.

ESP Electricity logo
Between
11 and 19 Jan 2025
Details
View Map
Share
Follow
Wandsworth Road

ESP Electricity are proposing to carry out Utility asset works on Wandsworth Road, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 3 Oct 2024 at 11:42.

London Borough Of Southwark logo
LONG TERM
Between
11 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:14.

Transport for London (TfL) logo
LONG TERM
Between
12 Jan and 15 Feb 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 10:34.

Southern Gas Networks logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Compton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Compton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 11:39.

UK Power Networks South Eastern logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 11:52.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Chilmark Road

Southern Gas Networks are proposing to carry out New service connection on Chilmark Road, Streatham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 15:37.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Chilmark Road

Southern Gas Networks are proposing to carry out New service connection on Chilmark Road, Streatham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 16:03.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Worple Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Worple Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:06.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Thornton Hill

Thames Water are proposing to carry out roadworks on Thornton Hill, Wimbledon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:06.

Thames Water logo
Between
13 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Cranbrook Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Cranbrook Road, Wimbledon, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 08:09.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Crystal Palace Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Crystal Palace Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:33.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 11:49.

London Borough Of Merton logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Links Road

London Borough Of Merton are proposing to carry out Highway improvement works on Links Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 12 Nov 2024 at 16:45.

London Borough Of Merton logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Links Road

London Borough Of Merton are proposing to carry out Highway improvement works on Links Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 15 Nov 2024 at 08:51.

Southern Gas Networks logo
Between
13 and 25 Jan 2025
Details
View Map
Share
Follow
Newlands Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newlands Park, Sydenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 15:31.

Thames Water logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Carlwell Street

Thames Water were proposing to carry out Utility asset works on Carlwell Street, Tooting, London.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 11:51.

Thames Water logo
Between
13 and 26 Jan 2025
Details
View Map
Share
Follow
Carlwell Street

Thames Water are proposing to carry out Utility asset works on Carlwell Street, Tooting, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Oct 2024 at 14:43.

Southern Gas Networks logo
Between
13 and 25 Jan 2025
Details
View Map
Share
Follow
Homecroft Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Homecroft Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 14:50.

Southern Gas Networks logo
Between
13 and 25 Jan 2025
Details
View Map
Share
Follow
Newlands Park

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newlands Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 11:16.

Thames Water logo
Between
13 and 26 Jan 2025
Details
View Map
Share
Follow
Brudenell Road

Thames Water are proposing to carry out roadworks on Brudenell Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:35.

Thames Water logo
Between
13 and 26 Jan 2025
Details
View Map
Share
Follow
Beechcroft Road

Thames Water are proposing to carry out roadworks on Beechcroft Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 26 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:29.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Heber Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Heber Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 16:30.

Thames Water logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Townley Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Townley Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:26.

Thames Water logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Culvert Road

Thames Water are proposing to carry out New service connection on Culvert Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 10:25.

Network Rail logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Southolm Street

Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 8 Oct 2024 at 08:39.

Network Rail logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Southolm Street

Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 22 Oct 2024 at 14:41.

Network Rail logo
Between
13 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Southolm Street

Network Rail are proposing to carry out Works for Rail Purposes on Southolm Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Oct 2024 at 08:23.

Hyperoptic logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Rostrevor Mews

Hyperoptic were proposing to carry out Utility asset works on Rostrevor Mews, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 20 Nov 2024 at 10:26.

Hyperoptic logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Rostrevor Mews

Hyperoptic were proposing to carry out Utility asset works on Rostrevor Mews, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 29 Nov 2024 at 11:41.

Hyperoptic logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Rostrevor Mews

Hyperoptic are proposing to carry out Utility asset works on Rostrevor Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 29 Nov 2024 at 11:44.

Cadent Gas logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Smith Terrace

Cadent Gas were proposing to carry out Disconnection or alteration of supply on Smith Terrace, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 15 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 15:59.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Wellington Square

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Wellington Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Nov 2024 at 16:42.

Hyperoptic logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Gerald Road

Hyperoptic are proposing to carry out Utility asset works on Gerald Road, Knightsbridge & Belgravia, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 24 Oct 2024 at 14:49.

Thames Water logo
LONG TERM
Between
13 Jan and 10 May 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are proposing to carry out Highway improvement works on Drummond Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 08:11.

Thames Water logo
LONG TERM
Between
13 Jan and 10 May 2025
Details
View Map
Share
Drummond Road

Thames Water were proposing to carry out Highway improvement works on Drummond Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 10 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 09:39.

Thames Water logo
LONG TERM
Between
13 Jan and 10 May 2025
Details
View Map
Share
Follow
Drummond Road

Thames Water are proposing to carry out Highway improvement works on Drummond Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 09:41.

City Of Westminster logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
St Margaret Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on St Margaret Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 1 Nov 2024 at 08:39.

UK Power Networks Eastern & London logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Merrow Street

UK Power Networks Eastern & London were proposing to carry out roadworks on Merrow Street, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:32.

UK Power Networks Eastern & London logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Merrow Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Merrow Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:30.

City Of Westminster logo
Between
14 and 20 Jan 2025
Details
View Map
Share
Follow
Bessborough Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bessborough Street, Tachbrook, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 5 Nov 2024 at 09:12.

Thames Water logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Union Street

Thames Water are proposing to carry out Utility repair and maintenance works on Union Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Oct 2024 at 11:33.

Thames Water logo
Between
14 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Wandle Side

Thames Water are proposing to carry out Disconnection or alteration of supply on Wandle Side, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:07.

Thames Water logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Lyndhurst Road

Thames Water are proposing to carry out New service connection on Lyndhurst Road, Thornton Heath, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:47.

Transport for London (TfL) logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Clapham Park Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Clapham Park Road, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 15:14.

UK Power Networks Eastern & London logo
LONG TERM
Between
14 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Ingrave Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Ingrave Street, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 14:03.

Southern Gas Networks logo
Between
16 and 19 Jan 2025
Details
View Map
Share
Follow
Selhurst New Road

Southern Gas Networks are proposing to carry out roadworks on Selhurst New Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 10:25.

Southern Gas Networks logo
Between
17 and 19 Jan 2025
Details
View Map
Share
Follow
Selhurst New Road

Southern Gas Networks are proposing to carry out roadworks on Selhurst New Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 10:03.

London Borough Of Southwark logo
Between
17 Jan and 6 Feb 2025
Details
View Map
Share
Follow
Penarth Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Penarth Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Oct 2024 at 21:09.

City Of Westminster logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Wilfred Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Wilfred Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 07:00.

City Of Westminster logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Catherine Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Catherine Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 06:59.

City Of Westminster logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Buckingham Place

City Of Westminster are proposing to carry out Highway repair and maintenance works on Buckingham Place, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 06:59.

City Of Westminster logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Palace Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 11 Jun 2024 at 07:00.

City Of Westminster logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Palace Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Palace Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Dec 2024 at 09:33.

City Of London Telecomms logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Colombo Street

City Of London Telecomms are proposing to carry out Utility asset works on Colombo Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Telecomms on 22 Oct 2024 at 13:22.

Southern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hazelwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Oct 2024 at 08:29.

Southern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Hazelwood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 08:38.

Southern Gas Networks logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Leander Road

Southern Gas Networks are proposing to carry out New service connection on Leander Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 15:52.

Southern Gas Networks logo
Between
20 and 28 Jan 2025
Details
View Map
Share
Follow
Leander Road

Southern Gas Networks are proposing to carry out New service connection on Leander Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 12:19.

London Borough Of Merton logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Martin Way

London Borough Of Merton are proposing to carry out Highway improvement works on Martin Way, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 4 Nov 2024 at 09:33.

London Borough Of Merton logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Mostyn Road

London Borough Of Merton are proposing to carry out Highway improvement works on Mostyn Road, Wimbledon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 18 Nov 2024 at 16:06.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Martin Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Martin Way, Morden.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:45.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Utility repair and maintenance works on London Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 23 Oct 2024 at 07:43.

UK Power Networks Eastern & London logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
Blandford Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Blandford Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 14:42.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Brickfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 10:50.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Brickfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Brickfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 11:13.

BT logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Willow View

BT are proposing to carry out Utility asset works on Willow View, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 21 Nov 2024 at 07:41.

Thames Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Brownhill Road

Thames Water are proposing to carry out New service connection on Brownhill Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 16:47.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Garratt Lane

Thames Water are proposing to carry out New service connection on Garratt Lane, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 11:59.

Thames Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Sangora Road

Thames Water are proposing to carry out New service connection on Sangora Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 12:08.

Hyperoptic logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Grimston Road

Hyperoptic are proposing to carry out Utility asset works on Grimston Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hyperoptic on 26 Nov 2024 at 14:55.

UK Power Networks Eastern & London logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Peterborough Mews

UK Power Networks Eastern & London were proposing to carry out New service connection on Peterborough Mews, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Oct 2024 at 11:31.

UK Power Networks Eastern & London logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Peterborough Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Peterborough Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 7 Nov 2024 at 11:40.

UK Power Networks Eastern & London logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Peterborough Mews

UK Power Networks Eastern & London are proposing to carry out New service connection on Peterborough Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 12 Nov 2024 at 10:57.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 12 Mar 2025
Details
View Map
Share
Follow
Parkgate Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Parkgate Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 23 Oct 2024 at 13:59.

Transport for London (TfL) logo
LONG TERM
Between
20 Jan and 26 Feb 2025
Details
View Map
Share
Follow
Westbridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Westbridge Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 15:43.

Thames Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
St Georges Way

Thames Water are proposing to carry out Utility repair and maintenance works on St Georges Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 09:36.

Thames Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
St Georges Way

Thames Water are proposing to carry out Utility repair and maintenance works on St Georges Way, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:46.

Thames Water logo
Between
21 and 24 Jan 2025
Details
View Map
Share
Follow
Holbein Mews

Thames Water are proposing to carry out Utility asset works on Holbein Mews, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 30 Oct 2024 at 10:40.

UK Power Networks Eastern & London logo
Between
21 and 31 Jan 2025
Details
View Map
Share
Follow
Parliament Square

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Parliament Square, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 29 Nov 2024 at 09:36.

UK Power Networks Eastern & London logo
Between
22 and 27 Jan 2025
Details
View Map
Share
Burton Grove

UK Power Networks Eastern & London were proposing to carry out roadworks on Burton Grove, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Sep 2024 at 09:33.

UK Power Networks Eastern & London logo
Between
22 and 27 Jan 2025
Details
View Map
Share
Follow
Burton Grove

UK Power Networks Eastern & London are proposing to carry out New service connection on Burton Grove, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Oct 2024 at 13:57.

Thames Water logo
LONG TERM
Between
22 Jan and 11 Mar 2025
Details
View Map
Share
Follow
Lodge Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Lodge Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 11 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 09:21.

London Borough Of Lambeth logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Kings Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 11:40.

London Borough Of Lambeth logo
Between
25 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Rosebery Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Rosebery Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 14:24.

Thames Water logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Silk Mills Path

Thames Water are proposing to carry out Utility repair and maintenance works on Silk Mills Path, Ladywell, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 13:20.

Thames Water logo
LONG TERM
Between
26 Jan and 28 Oct 2025
Details
View Map
Share
Follow
Renfrew Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Renfrew Road, Stockwell East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 January 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 08:01.

London Borough Of Southwark logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Penton Place

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Penton Place, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:36.

London Borough Of Southwark logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Penton Place

London Borough Of Southwark were proposing to carry out Highway repair and maintenance works on Penton Place, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 28 Nov 2024 at 15:11.

Southern Gas Networks logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Layard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layard Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:57.

Southern Gas Networks logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Layard Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Layard Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 08:28.

Network Rail logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Sail Street

Network Rail are proposing to carry out Works for Rail Purposes on Sail Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Oct 2024 at 07:25.

Thames Water logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Victoria Street

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Aug 2024 at 06:23.

UK Power Networks Eastern & London logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Abbey Orchard Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 07:32.

UK Power Networks Eastern & London logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Great Smith Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Great Smith Street, St James's, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 11 Nov 2024 at 07:31.

ESP Electricity logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Carteret Street

ESP Electricity are proposing to carry out Utility asset works on Carteret Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by ESP Electricity on 11 Dec 2024 at 15:01.

UK Power Networks Eastern & London logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Whitehall

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Whitehall, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 08:31.

UK Power Networks South Eastern logo
LONG TERM
Between
27 Jan and 2 Mar 2025
Details
View Map
Share
Beddington Farm Road

UK Power Networks South Eastern were proposing to carry out New service connection on Beddington Farm Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 2 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 1 Oct 2024 at 13:49.

Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Bensham Lane

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility repair and maintenance works on Bensham Lane, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 3 Dec 2024 at 15:56.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Central Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Road, Morden.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 10:02.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Central Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Central Road, Morden.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 14:46.

Thames Water logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 08:16.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Westcroft Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcroft Gardens, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:47.

Southern Gas Networks logo
Between
27 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Westcroft Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Westcroft Gardens, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:26.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Friday Road

London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 4 Nov 2024 at 15:20.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Friday Road

London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 8 Nov 2024 at 15:39.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Friday Road

London Borough Of Merton are proposing to carry out Highway improvement works on Friday Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 5 Nov 2024 at 08:27.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Friday Road

London Borough Of Merton were proposing to carry out Highway improvement works on Friday Road, Mitcham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 6 Dec 2024 at 14:57.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Crusoe Road

London Borough Of Merton are proposing to carry out Highway improvement works on Crusoe Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 5 Nov 2024 at 08:28.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Crusoe Road

London Borough Of Merton are proposing to carry out Highway improvement works on Crusoe Road, Mitcham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 15 Nov 2024 at 08:40.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Crusoe Road

London Borough Of Merton were proposing to carry out Highway improvement works on Crusoe Road, Mitcham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 2 Dec 2024 at 16:49.

London Borough Of Merton logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Crusoe Road

London Borough Of Merton were proposing to carry out Highway improvement works on Crusoe Road, Mitcham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 7 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 6 Dec 2024 at 14:54.

UK Power Networks Eastern & London logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Lawrie Park Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Lawrie Park Road, Sydenham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Dec 2024 at 14:32.

Thames Water logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Maybury Street

Thames Water are proposing to carry out New service connection on Maybury Street, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 07:38.

Thames Water logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Maybury Street

Thames Water are proposing to carry out New service connection on Maybury Street, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:12.

Thames Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Lakeview Road

Thames Water are proposing to carry out Utility asset works on Lakeview Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Jul 2024 at 09:25.

Thames Water logo
Between
27 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Lakeview Road

Thames Water are proposing to carry out Utility asset works on Lakeview Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 9 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Aug 2024 at 15:49.

UK Power Networks Eastern & London logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Auckland Hill

UK Power Networks Eastern & London are proposing to carry out New service connection on Auckland Hill, Gipsy Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 11:58.

London Borough Of Lambeth logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Lowden Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 18 Nov 2024 at 14:12.

London Borough Of Lambeth logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Lowden Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 29 Nov 2024 at 15:12.

UK Power Networks Eastern & London logo
Between
27 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Old York Road

UK Power Networks Eastern & London are proposing to carry out Diversionary works on Old York Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 17 Oct 2024 at 14:32.

London Borough Of Southwark logo
LONG TERM
Between
27 Jan and 10 Mar 2025
Details
View Map
Share
Ilderton Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Ilderton Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 12:48.

UK Power Networks South Eastern logo
Between
28 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 7 Aug 2024 at 16:55.

T-Mobile (UK) logo
LONG TERM
Between
28 Jan and 15 Apr 2025
Details
View Map
Share
Follow
Grosvenor Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Grosvenor Road, South Norwood, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 15 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 21 Nov 2024 at 11:37.

T-Mobile (UK) logo
LONG TERM
Between
28 Jan and 11 Mar 2025
Details
View Map
Share
Follow
Grosvenor Road

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Grosvenor Road, South Norwood, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 11 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by T-Mobile (UK) on 25 Nov 2024 at 12:40.

London Borough Of Lambeth logo
Between
28 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Thorncliffe Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thorncliffe Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 14:25.

London Borough Of Lambeth logo
Between
28 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Thornbury Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Thornbury Road, Clapham Park, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 22 Oct 2024 at 14:24.

Transport for London (TfL) logo
LONG TERM
Between
28 Jan and 30 May 2025
Details
View Map
Share
Follow
Beaufort Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Beaufort Street, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 25 Apr 2024 at 13:50.

City Of London Corporation logo
Between
28 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway repair and maintenance works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 26 Jul 2024 at 14:15.

City Of London Corporation logo
Between
28 Jan and 1 Feb 2025
Details
View Map
Share
Tower Bridge Road

City Of London Corporation were proposing to carry out Highway repair and maintenance works on Tower Bridge Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 1 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 13 Aug 2024 at 11:53.

City Of London Corporation logo
Between
28 Jan and 2 Feb 2025
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 26 Jul 2024 at 14:17.

City Of London Corporation logo
Between
28 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Tower Bridge Road

City Of London Corporation are proposing to carry out Highway improvement works on Tower Bridge Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by City Of London Corporation on 2 Aug 2024 at 16:01.

Hyperoptic logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Chelsea Manor Street

Hyperoptic are proposing to carry out Utility asset works on Chelsea Manor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 6 Dec 2024 at 18:53.

Hyperoptic logo
Between
29 and 31 Jan 2025
Details
View Map
Share
Follow
Chelsea Manor Street

Hyperoptic are proposing to carry out Utility asset works on Chelsea Manor Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 9 Dec 2024 at 10:31.

Thames Water logo
Between
29 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Tulse Hill

Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 10:27.

Southern Gas Networks logo
LONG TERM
Between
29 Jan and 10 Mar 2025
Details
View Map
Share
Follow
Red Post Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Red Post Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.

London Borough Of Southwark logo
Between
29 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Dog Kennel Hill

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dog Kennel Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 3 Dec 2024 at 08:11.

Thames Water logo
Between
30 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Sutherland Road

Thames Water are proposing to carry out Utility asset works on Sutherland Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 13:49.

UK Power Networks South Eastern logo
Between
30 Jan and 20 Feb 2025
Details
View Map
Share
Follow
Coomber Way

UK Power Networks South Eastern are proposing to carry out New service connection on Coomber Way, Beddington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 10 Dec 2024 at 13:52.

UK Power Networks Eastern & London logo
Between
31 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Sunnydene Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Sunnydene Street, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 25 Nov 2024 at 14:09.

Southern Gas Networks logo
LONG TERM
Between
31 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Normanhurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Normanhurst Road, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:51.

Southern Gas Networks logo
LONG TERM
Between
31 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Nuthurst Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nuthurst Avenue, Streatham Hill East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 15:52.

Thames Water logo
LONG TERM
Between
31 Jan and 1 Apr 2025
Details
View Map
Share
Follow
Eccleston Street

Thames Water are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 09:35.

Thames Water logo
LONG TERM
Between
31 Jan and 1 Apr 2025
Details
View Map
Share
Follow
Eccleston Street

Thames Water are proposing to carry out Utility asset works on Eccleston Street, Knightsbridge & Belgravia, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 09:09.

London Borough Of Southwark logo
LONG TERM
Between
31 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Omeara Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Omeara Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Dec 2024 at 13:22.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:01.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Albert Embankment

Transport for London (TfL) are proposing to carry out Highway improvement works on Albert Embankment, Vauxhall, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:15.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Road Roundabout

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Road Roundabout, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:50.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 14:06.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Bridge

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Bridge, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 18 Oct 2024 at 18:13.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Oct 2024 at 10:17.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Lambeth Palace Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Lambeth Palace Road, Waterloo & Southbank, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 14 Nov 2024 at 10:51.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Horseferry Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 11:15.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Horseferry Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Horseferry Road, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 9 Oct 2024 at 12:17.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 30 Sep 2024 at 15:06.

Transport for London (TfL) logo
LONG TERM
Between
1 Feb and 2 Oct 2025
Details
View Map
Share
Follow
Millbank

Transport for London (TfL) are proposing to carry out Highway improvement works on Millbank, Vincent Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 2 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 4 Oct 2024 at 09:45.

UK Power Networks Eastern & London logo
Between
1 and 22 Feb 2025
Details
View Map
Share
Follow
Bridge Street

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Bridge Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 11:26.

Thames Water logo
Between
1 and 14 Feb 2025
Details
View Map
Share
Follow
Landcroft Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Landcroft Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:26.

London Borough Of Lewisham logo
LONG TERM
Between
1 Feb and 30 May 2025
Details
View Map
Share
Lewisham High Street

London Borough Of Lewisham were proposing to carry out Highway improvement works on Lewisham High Street, Hither Green, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 30 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Lewisham on 11 Nov 2024 at 09:39.

Transport for London (TfL) logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Edridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Edridge Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 08:49.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Leamington Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leamington Avenue, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:46.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Leamington Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leamington Avenue, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:32.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Carolina Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carolina Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 10:49.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Carolina Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carolina Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 11:16.

London Borough Of Bromley logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Westbury Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Westbury Road, Penge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 18 Nov 2024 at 13:55.

London Borough Of Bromley logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Lennard Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Lennard Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:20.

London Borough Of Bromley logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Kent House Road

London Borough Of Bromley are proposing to carry out Highway improvement works on Kent House Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Bromley on 3 Oct 2024 at 14:20.

Thames Water logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Natal Road

Thames Water are proposing to carry out Utility repair and maintenance works on Natal Road, Streatham St Leonard's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 14:00.

Thames Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Arran Road

Thames Water are proposing to carry out Utility repair and maintenance works on Arran Road, Catford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 15:57.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Follow
Garratt Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 07:57.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 27 Apr 2025
Details
View Map
Share
Follow
Magdalen Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Magdalen Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 07:02.

London Borough Of Southwark logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Melford Road

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Melford Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 09:11.

London Borough Of Southwark logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Melford Road

London Borough Of Southwark were proposing to carry out Highway improvement works on Melford Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 6 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 16:12.

Transport for London (TfL) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
West Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 24 Oct 2024 at 13:40.

Transport for London (TfL) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
West Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on West Hill, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 09:58.

Thames Water logo
Between
3 and 10 Feb 2025
Details
View Map
Share
Follow
Camborne Road

Thames Water are proposing to carry out New service connection on Camborne Road, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 08:53.

Southern Gas Networks logo
Between
3 and 6 Feb 2025
Details
View Map
Share
Follow
Cheltenham Road

Southern Gas Networks are proposing to carry out New service connection on Cheltenham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 12:26.

Transport for London (TfL) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Buckhold Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 3 Dec 2024 at 09:46.

Transport for London (TfL) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Buckhold Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Buckhold Road, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 12:59.

Transport for London (TfL) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Wandsworth High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wandsworth High Street, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 28 Nov 2024 at 10:26.

Transport for London (TfL) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Wandsworth High Street

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Wandsworth High Street, Wandsworth, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 5 Dec 2024 at 09:02.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Casino Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Casino Avenue, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:19.

London Borough Of Southwark logo
Between
3 and 8 Feb 2025
Details
View Map
Share
Follow
Grove Vale

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Grove Vale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:44.

Royal Borough Of Kensington And Chelsea logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Lots Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on Lots Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Dec 2024 at 14:25.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 9 Dec 2024 at 11:18.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 6 Dec 2024 at 09:52.

London Borough Of Southwark logo
LONG TERM
Between
3 Feb and 1 Aug 2025
Details
View Map
Share
Follow
Hornshay Street

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Hornshay Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 1 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 6 Dec 2024 at 10:07.

UK Power Networks Eastern & London logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Carlyle Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Dec 2024 at 12:19.

UK Power Networks Eastern & London logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Carlyle Square

UK Power Networks Eastern & London are proposing to carry out New service connection on Carlyle Square, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Dec 2024 at 14:31.

Cadent Gas logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Ebury Bridge Road

Cadent Gas were proposing to carry out Utility asset works on Ebury Bridge Road, Churchill, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 21 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 12:52.

London Borough Of Southwark logo
Between
3 and 25 Feb 2025
Details
View Map
Share
Follow
Long Lane

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Long Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 25 February 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Southwark on 21 Nov 2024 at 08:20.

BT logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Boundary Lane

BT are proposing to carry out Utility repair and maintenance works on Boundary Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 2 Dec 2024 at 09:23.

London Borough Of Lambeth logo
Between
6 and 11 Feb 2025
Details
View Map
Share
Follow
Union Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Union Road, Stockwell West & Larkhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 1 Nov 2024 at 08:28.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 8 Feb 2025
Details
View Map
Share
Follow
First Street

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on First Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Dec 2024 at 14:40.

Royal Borough Of Kensington And Chelsea logo
Between
6 and 8 Feb 2025
Details
View Map
Share
Follow
Lennox Gardens

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on Lennox Gardens, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 5 Dec 2024 at 15:12.

Thames Water logo
Between
7 and 14 Feb 2025
Details
View Map
Share
Follow
Jennings Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Jennings Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 12:26.

Thames Water logo
LONG TERM
Between
8 Feb and 2 Apr 2025
Details
View Map
Share
Follow
Trevelyan Road

Thames Water are proposing to carry out roadworks on Trevelyan Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:32.

Thames Water logo
LONG TERM
Between
8 Feb and 2 Apr 2025
Details
View Map
Share
Follow
Tooting High Street

Thames Water are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The works will start on or after 8 February 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:55.

Thames Water logo
LONG TERM
Between
8 Feb and 2 Apr 2025
Details
View Map
Share
Follow
Tooting High Street

Thames Water are proposing to carry out Utility asset works on Tooting High Street, Tooting, London.

These works are categorised as Major.

The works will start on or after 8 February 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 09:45.

Cadent Gas logo
LONG TERM
Between
8 Feb and 16 Mar 2025
Details
View Map
Share
Follow
Lower Sloane Street

Cadent Gas are proposing to carry out Utility asset works on Lower Sloane Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 16 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 16:25.

Cadent Gas logo
LONG TERM
Between
10 Feb and 4 May 2025
Details
View Map
Share
Follow
Sloane Square

Cadent Gas are proposing to carry out Utility asset works on Sloane Square, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 16:57.

Thames Water logo
Between
10 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Southwark Park Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southwark Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2023 at 12:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Pelham Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Pelham Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 8 Nov 2024 at 13:23.

London Borough Of Southwark logo
LONG TERM
Between
10 Feb and 24 Apr 2025
Details
View Map
Share
Follow
Clements Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Clements Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 26 Nov 2024 at 15:41.

Hyperoptic logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Chadwick Street

Hyperoptic are proposing to carry out Utility asset works on Chadwick Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 10 Dec 2024 at 07:08.

Virgin Media logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Yeoman's Row

Virgin Media were proposing to carry out Utility asset works on Yeoman's Row, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 12 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 11 Nov 2024 at 14:32.

London Borough Of Southwark logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
Long Lane

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Long Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 4 Dec 2024 at 15:29.

UK Power Networks Eastern & London logo
Between
10 and 22 Feb 2025
Details
View Map
Share
Follow
Horse Guards Avenue

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Horse Guards Avenue, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 08:31.

London Borough Of Southwark logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Prices Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Prices Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 12:22.

London Borough Of Southwark logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Prices Street

London Borough Of Southwark are proposing to carry out Highway improvement works on Prices Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 19 Nov 2024 at 12:22.

UK Power Networks South Eastern logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Sumner Road South

UK Power Networks South Eastern are proposing to carry out New service connection on Sumner Road South, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 29 Nov 2024 at 09:02.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Marden Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Marden Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:17.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Marden Crescent

Thames Water are proposing to carry out Utility repair and maintenance works on Marden Crescent, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:27.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Thornton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Thornton Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:17.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Shamrock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Shamrock Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:19.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Shamrock Road

Thames Water are proposing to carry out Utility repair and maintenance works on Shamrock Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 11:28.

Southern Gas Networks logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Ecclesbourne Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Ecclesbourne Road, Thornton Heath, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 12:43.

Southern Gas Networks logo
Between
10 and 27 Feb 2025
Details
View Map
Share
Hazelwood Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hazelwood Avenue, Morden.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 27 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 11:04.

Thames Water logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Bramcote Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Bramcote Avenue, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 13:23.

Thames Water logo
Between
10 and 25 Feb 2025
Details
View Map
Share
Follow
Cricket Green

Thames Water are proposing to carry out Disconnection or alteration of supply on Cricket Green, Mitcham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 13:21.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Monkleigh Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monkleigh Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Sep 2024 at 09:51.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Monkleigh Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Monkleigh Road, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 08:54.

Thames Water logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
High Street

Thames Water are proposing to carry out Utility repair and maintenance works on High Street, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 17:22.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
St Julian's Farm Road

Thames Water are proposing to carry out Remedial works on St Julian's Farm Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 08:32.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
St Julian's Farm Road

Thames Water are proposing to carry out Utility repair and maintenance works on St Julian's Farm Road, Knight's Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 14:06.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
St Julian's Farm Road

Thames Water were proposing to carry out Utility repair and maintenance works on St Julian's Farm Road, Knight's Hill, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 13:16.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 4 May 2025
Details
View Map
Share
Follow
Selkirk Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Selkirk Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 12:01.

Southern Gas Networks logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Kingsmead Road

Southern Gas Networks are proposing to carry out New service connection on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 12:07.

Southern Gas Networks logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Kingsmead Road

Southern Gas Networks are proposing to carry out New service connection on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 13:05.

Southern Gas Networks logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Kingsmead Road

Southern Gas Networks are proposing to carry out New service connection on Kingsmead Road, St Martin's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 08:43.

Thames Water logo
LONG TERM
Between
10 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Balham Park Road

Thames Water are proposing to carry out Utility asset works on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 May 2024 at 06:16.

Thames Water logo
LONG TERM
Between
10 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Balham Park Road

Thames Water are proposing to carry out Utility asset works on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Aug 2024 at 13:00.

Thames Water logo
LONG TERM
Between
10 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Balham Park Road

Thames Water are proposing to carry out Utility asset works on Balham Park Road, Balham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Sep 2024 at 11:24.

Thames Water logo
LONG TERM
Between
10 Feb and 23 Mar 2025
Details
View Map
Share
Balham Park Road

Thames Water were proposing to carry out Utility asset works on Balham Park Road, Balham, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 23 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 15:07.

Thames Water logo
LONG TERM
Between
10 Feb and 23 Mar 2025
Details
View Map
Share
Follow
Balham High Road

Thames Water are proposing to carry out Utility asset works on Balham High Road, Balham, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 May 2024 at 16:52.

Thames Water logo
Between
10 and 12 Feb 2025
Details
View Map
Share
Follow
Elborough Street

Thames Water are proposing to carry out Utility asset works on Elborough Street, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 08:17.

Thames Water logo
Between
10 Feb and 10 Mar 2025
Details
View Map
Share
Follow
Barry Road

Thames Water are proposing to carry out Utility repair and maintenance works on Barry Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 10 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:20.

Thames Water logo
Between
10 Feb and 10 Mar 2025
Details
View Map
Share
Barry Road

Thames Water were proposing to carry out roadworks on Barry Road, London.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 10 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 7 Aug 2024 at 08:17.

Thames Water logo
LONG TERM
Between
10 Feb and 9 Jun 2025
Details
View Map
Share
Follow
Lordship Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Lordship Lane, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 9 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 16 Aug 2024 at 12:13.

London Borough Of Lambeth logo
Between
10 and 22 Feb 2025
Details
View Map
Share
Follow
Lowden Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 15 Nov 2024 at 15:05.

London Borough Of Lambeth logo
Between
10 and 22 Feb 2025
Details
View Map
Share
Follow
Lowden Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Lowden Road, Herne Hill & Loughborough Junction, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 20 Nov 2024 at 13:19.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Mendip Road

Thames Water are proposing to carry out Highway improvement works on Mendip Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 08:21.

Thames Water logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Chatfield Road

Thames Water are proposing to carry out Highway improvement works on Chatfield Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 14 Oct 2024 at 08:24.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
St Dionis Road

Cadent Gas are proposing to carry out Utility asset works on St Dionis Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Nov 2024 at 12:52.

Cadent Gas logo
Between
10 and 21 Feb 2025
Details
View Map
Share
Follow
St Dionis Road

Cadent Gas are proposing to carry out Utility asset works on St Dionis Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 12:05.

Thames Water logo
LONG TERM
Between
11 Feb and 21 Apr 2025
Details
View Map
Share
Follow
Lodge Avenue

Thames Water are proposing to carry out Disconnection or alteration of supply on Lodge Avenue, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jul 2024 at 13:01.

London Borough Of Enfield logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Westbury Road

London Borough Of Enfield were proposing to carry out Highway improvement works on Westbury Road, Penge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 February 2025 and run through until 13 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by London Borough Of Enfield on 11 Nov 2024 at 08:13.

Thames Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Longley Road

Thames Water are proposing to carry out Utility asset works on Longley Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 07:39.

Transport for London (TfL) logo
Between
12 and 15 Feb 2025
Details
View Map
Share
Follow
Pump Pail South

Transport for London (TfL) are proposing to carry out Highway improvement works on Pump Pail South, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 4 Dec 2024 at 10:08.

Thames Water logo
Between
12 and 17 Feb 2025
Details
View Map
Share
Follow
Tulse Hill

Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:36.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Brookbank Road

Thames Water are proposing to carry out Utility repair and maintenance works on Brookbank Road, Ladywell, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 09:44.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Brookbank Road

Thames Water are proposing to carry out Utility repair and maintenance works on Brookbank Road, Ladywell, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 11:14.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Cambridge Street

Thames Water are proposing to carry out Utility repair and maintenance works on Cambridge Street, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:18.

Thames Water logo
Between
12 and 17 Feb 2025
Details
View Map
Share
Follow
Old Paradise Street

Thames Water are proposing to carry out New service connection on Old Paradise Street, Waterloo & Southbank, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Oct 2024 at 12:04.

BT logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Rysbrack Street

BT are proposing to carry out Utility asset works on Rysbrack Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 6 Dec 2024 at 10:37.

UK Power Networks Eastern & London logo
LONG TERM
Between
13 Feb and 23 Apr 2025
Details
View Map
Share
Follow
Falcon Road

UK Power Networks Eastern & London are proposing to carry out Utility asset works on Falcon Road, Battersea, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 30 Aug 2024 at 11:51.

Thames Water logo
Between
13 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Lewisham Road

Thames Water are proposing to carry out Utility repair and maintenance works on Lewisham Road, Lewisham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 10:29.

Transport for London (TfL) logo
Between
14 and 24 Feb 2025
Details
View Map
Share
Follow
Wellesley Road

Transport for London (TfL) are proposing to carry out Utility asset works on Wellesley Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 07:58.

Transport for London (TfL) logo
Between
14 and 24 Feb 2025
Details
View Map
Share
Follow
George Street

Transport for London (TfL) are proposing to carry out Highway improvement works on George Street, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 11 Dec 2024 at 07:58.

Thames Water logo
Between
14 and 19 Feb 2025
Details
View Map
Share
Follow
Tulse Hill

Thames Water are proposing to carry out New service connection on Tulse Hill, St Martin's, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 12:38.

London Borough Of Southwark logo
LONG TERM
Between
14 Feb and 12 Apr 2025
Details
View Map
Share
Follow
Green Dale

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Green Dale, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 5 Nov 2024 at 08:51.

London Borough Of Sutton logo
Between
15 and 19 Feb 2025
Details
View Map
Share
Follow
West Street

London Borough Of Sutton are proposing to carry out Highway improvement works on West Street, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Dec 2024 at 17:14.

UK Power Networks Eastern & London logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Churchfields Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Churchfields Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 9 Dec 2024 at 14:42.

Thames Water logo
Between
15 and 23 Feb 2025
Details
View Map
Share
Follow
Green Lane

Thames Water are proposing to carry out New service connection on Green Lane, Streatham Common & Vale, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 12:38.

Thames Water logo
Between
15 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Dafforne Road

Thames Water are proposing to carry out roadworks on Dafforne Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:30.

Thames Water logo
Between
15 Feb and 1 Mar 2025
Details
View Map
Share
Follow
Stapleton Road

Thames Water are proposing to carry out roadworks on Stapleton Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:33.

Thames Water logo
Between
15 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Upper Tooting Road

Thames Water are proposing to carry out Utility asset works on Upper Tooting Road, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:32.

Thames Water logo
Between
15 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Upper Tooting Road

Thames Water are proposing to carry out Utility asset works on Upper Tooting Road, Tooting, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 09:48.

Transport for London (TfL) logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 6 Nov 2024 at 12:30.

Transport for London (TfL) logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 18:03.

Transport for London (TfL) logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 14:27.

Transport for London (TfL) logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 14:28.

Transport for London (TfL) logo
Between
15 and 17 Feb 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 26 Nov 2024 at 18:15.

Transport for London (TfL) logo
Between
16 Feb and 6 Mar 2025
Details
View Map
Share
Bromley Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Bromley Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 10:51.

Transport for London (TfL) logo
Between
16 Feb and 6 Mar 2025
Details
View Map
Share
Bromley Road

Transport for London (TfL) were proposing to carry out Highway repair and maintenance works on Bromley Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 February 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 10:51.

Transport for London (TfL) logo
Between
16 Feb and 6 Mar 2025
Details
View Map
Share
Follow
Bromley Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Bromley Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 16:02.

Transport for London (TfL) logo
LONG TERM
Between
16 Feb and 29 Mar 2025
Details
View Map
Share
Follow
Streatham Hill

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Streatham Hill, Streatham Hill East, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 8 Oct 2024 at 15:04.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chatsworth Road

Southern Gas Networks are proposing to carry out New service connection on Chatsworth Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 07:01.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chatsworth Road

Southern Gas Networks are proposing to carry out New service connection on Chatsworth Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 09:10.

Southern Gas Networks logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Chatsworth Road

Southern Gas Networks are proposing to carry out New service connection on Chatsworth Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 10 Nov 2024 at 15:33.

Transport for London (TfL) logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Pump Pail North

Transport for London (TfL) are proposing to carry out Highway improvement works on Pump Pail North, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 18 Nov 2024 at 12:42.

BT logo
Between
17 and 26 Feb 2025
Details
View Map
Share
Follow
Sydenham Road

BT are proposing to carry out Utility repair and maintenance works on Sydenham Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Dec 2024 at 13:28.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Southcote Road

Thames Water are proposing to carry out Utility repair and maintenance works on Southcote Road, South Norwood, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 14:04.

Thames Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Pawsons Road

Thames Water are proposing to carry out Utility repair and maintenance works on Pawsons Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 15:46.

Southern Gas Networks logo
Between
17 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Northway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Northway, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 20:34.

UK Power Networks Eastern & London logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Churchfields Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Churchfields Road, Beckenham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 18 Nov 2024 at 17:06.

Southern Gas Networks logo
Between
17 and 24 Feb 2025
Details
View Map
Share
Follow
Springfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 11:46.

Southern Gas Networks logo
Between
17 and 23 Feb 2025
Details
View Map
Share
Follow
Springfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Springfield Road, Croydon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 09:19.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 3 Apr 2025
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 26 Sep 2024 at 09:39.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 3 Apr 2025
Details
View Map
Share
Follow
Croydon Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Croydon Road, Penge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 3 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 10:08.

UK Power Networks Eastern & London logo
LONG TERM
Between
17 Feb and 11 Sep 2025
Details
View Map
Share
Follow
Anerley Park

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Anerley Park, Penge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 11 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 23 Oct 2024 at 12:21.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Dewey Street

Thames Water are proposing to carry out New service connection on Dewey Street, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Oct 2024 at 12:47.

London Borough Of Wandsworth logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Burntwood Lane

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Burntwood Lane, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 21 Nov 2024 at 10:04.

Thames Water logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Beechcroft Road

Thames Water are proposing to carry out Utility repair and maintenance works on Beechcroft Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 12:49.

Southern Gas Networks logo
Between
17 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Carson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carson Road, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 12:29.

Southern Gas Networks logo
Between
17 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Carson Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Carson Road, West Dulwich, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Dec 2024 at 09:37.

Southern Gas Networks logo
Between
17 Feb and 9 Mar 2025
Details
View Map
Share
Follow
Culverley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Culverley Road, Catford, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 9 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:48.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 6 Apr 2025
Details
View Map
Share
Follow
Algarve Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Algarve Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Jun 2024 at 08:44.

Southern Gas Networks logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Engleheart Road

Southern Gas Networks are proposing to carry out New service connection on Engleheart Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 10:56.

Southern Gas Networks logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Engleheart Road

Southern Gas Networks are proposing to carry out New service connection on Engleheart Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 16:30.

Southern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bellamy Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bellamy Street, Balham, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 16:01.

London Borough Of Wandsworth logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Harbut Road

London Borough Of Wandsworth are proposing to carry out Highway repair and maintenance works on Harbut Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 20 Nov 2024 at 15:41.

London Borough Of Hammersmith & Fulham logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Clancarty Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Clancarty Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 5 Nov 2024 at 09:05.

London Borough Of Hammersmith & Fulham logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Clancarty Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway improvement works on Clancarty Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 13 Nov 2024 at 09:57.

UK Power Networks Eastern & London logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Doria Road

UK Power Networks Eastern & London were proposing to carry out New service connection on Doria Road, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 2 Dec 2024 at 11:30.

Royal Borough Of Kensington And Chelsea logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Upcerne Road

Royal Borough Of Kensington And Chelsea are proposing to carry out Highway repair and maintenance works on Upcerne Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Royal Borough Of Kensington And Chelsea on 25 Apr 2024 at 05:56.

London Borough Of Hammersmith & Fulham logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Fulham Road

London Borough Of Hammersmith & Fulham are proposing to carry out Highway repair and maintenance works on Fulham Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Hammersmith & Fulham on 9 Dec 2024 at 14:11.

London Borough Of Southwark logo
LONG TERM
Between
17 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Ilderton Road

London Borough Of Southwark are proposing to carry out Highway improvement works on Ilderton Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Southwark on 29 Oct 2024 at 14:21.

Thames Water logo
Between
17 and 25 Feb 2025
Details
View Map
Share
Follow
Jonathan Street

Thames Water are proposing to carry out New service connection on Jonathan Street, Vauxhall, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 08:16.

Cadent Gas logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Ebury Bridge

Cadent Gas are proposing to carry out Utility asset works on Ebury Bridge, Churchill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 09:35.

UK Power Networks Eastern & London logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Gomm Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Gomm Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 15 Oct 2024 at 10:56.

Cadent Gas logo
LONG TERM
Between
17 Feb and 12 Apr 2025
Details
View Map
Share
Follow
Victoria Street

Cadent Gas are proposing to carry out Utility asset works on Victoria Street, St James's, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:44.

Cadent Gas logo
LONG TERM
Between
17 Feb and 12 Apr 2025
Details
View Map
Share
Follow
Abbey Orchard Street

Cadent Gas are proposing to carry out Utility asset works on Abbey Orchard Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:43.

Cadent Gas logo
LONG TERM
Between
17 Feb and 12 Apr 2025
Details
View Map
Share
Follow
Tothill Street

Cadent Gas are proposing to carry out Utility asset works on Tothill Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 12 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 09:43.

London Borough Of Merton logo
Between
18 and 28 Feb 2025
Details
View Map
Share
Follow
Kingsley Road

London Borough Of Merton are proposing to carry out Highway improvement works on Kingsley Road, Wimbledon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 13 Nov 2024 at 08:05.

London Borough Of Merton logo
Between
18 and 28 Feb 2025
Details
View Map
Share
Follow
Kingsley Road

London Borough Of Merton are proposing to carry out Highway improvement works on Kingsley Road, Wimbledon, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Merton on 13 Nov 2024 at 14:40.

Hyperoptic logo
Between
18 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Garratt Lane

Hyperoptic are proposing to carry out Utility repair and maintenance works on Garratt Lane, Tooting, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 19 Nov 2024 at 08:35.

Thames Water logo
Between
18 and 22 Feb 2025
Details
View Map
Share
Victoria Rise

Thames Water were proposing to carry out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 22 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 6 Nov 2024 at 15:16.

Thames Water logo
Between
18 and 22 Feb 2025
Details
View Map
Share
Follow
Victoria Rise

Thames Water are proposing to carry out Utility repair and maintenance works on Victoria Rise, Clapham Town, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 7 Nov 2024 at 08:07.

UK Power Networks Eastern & London logo
Between
18 and 24 Feb 2025
Details
View Map
Share
Follow
New King's Road

UK Power Networks Eastern & London are proposing to carry out New service connection on New King's Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 09:08.

UK Power Networks Eastern & London logo
Between
18 and 24 Feb 2025
Details
View Map
Share
Follow
Doria Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Doria Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 4 Dec 2024 at 09:08.

London Borough Of Sutton logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Follow
Wrythe Green Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Wrythe Green Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 4 Dec 2024 at 13:09.

London Borough Of Sutton logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Follow
Wrythe Green Road

London Borough Of Sutton are proposing to carry out Highway improvement works on Wrythe Green Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Sutton on 6 Dec 2024 at 11:54.

UK Power Networks Eastern & London logo
Between
19 and 27 Feb 2025
Details
View Map
Share
Follow
Auckland Hill

UK Power Networks Eastern & London are proposing to carry out New service connection on Auckland Hill, Gipsy Hill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks Eastern & London on 20 Nov 2024 at 07:48.

London Borough Of Lambeth logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Follow
Clapham Crescent

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Clapham Crescent, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 31 Oct 2024 at 11:57.

London Borough Of Lambeth logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Follow
Clapham Crescent

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Clapham Crescent, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 31 Oct 2024 at 10:55.

London Borough Of Lambeth logo
Between
19 and 23 Feb 2025
Details
View Map
Share
Follow
Triangle Place

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Triangle Place, Clapham East, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 31 Oct 2024 at 11:58.

Thames Water logo
LONG TERM
Between
19 Feb and 25 Jun 2025
Details
View Map
Share
Follow
Eaton Place

Thames Water are proposing to carry out Utility asset works on Eaton Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 25 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 10:22.

Thames Water logo
LONG TERM
Between
19 Feb and 30 Apr 2025
Details
View Map
Share
Follow
Belgrave Place

Thames Water are proposing to carry out Utility asset works on Belgrave Place, Knightsbridge & Belgravia, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 16:16.

Transport for London (TfL) logo
LONG TERM
Between
20 Feb and 12 May 2025
Details
View Map
Share
Follow
Vauxhall Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 12 May 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:25.

Transport for London (TfL) logo
LONG TERM
Between
20 Feb and 12 May 2025
Details
View Map
Share
Vauxhall Bridge Road

Transport for London (TfL) were proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 February 2025 and run through until 12 May 2025. The works were due to impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 11 Nov 2024 at 13:42.

Transport for London (TfL) logo
LONG TERM
Between
20 Feb and 12 May 2025
Details
View Map
Share
Follow
Vauxhall Bridge Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Vauxhall Bridge Road, Tachbrook, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 12 May 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 14:12.

Southern Gas Networks logo
Between
20 and 24 Feb 2025
Details
View Map
Share
Follow
Ecclesbourne Road

Southern Gas Networks are proposing to carry out Disconnection or alteration of supply on Ecclesbourne Road, Thornton Heath, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 16:56.

UK Power Networks Eastern & London logo
Between
20 and 26 Feb 2025
Details
View Map
Share
Follow
New King's Road

UK Power Networks Eastern & London are proposing to carry out New service connection on New King's Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Dec 2024 at 09:02.

UK Power Networks Eastern & London logo
Between
20 and 26 Feb 2025
Details
View Map
Share
Follow
New King's Road

UK Power Networks Eastern & London are proposing to carry out New service connection on New King's Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 13:57.

UK Power Networks Eastern & London logo
Between
20 and 26 Feb 2025
Details
View Map
Share
Follow
Doria Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Doria Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 5 Dec 2024 at 09:02.

UK Power Networks Eastern & London logo
Between
20 and 26 Feb 2025
Details
View Map
Share
Follow
Doria Road

UK Power Networks Eastern & London are proposing to carry out New service connection on Doria Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 10 Dec 2024 at 14:03.

UK Power Networks Eastern & London logo
Between
21 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Browning Street

UK Power Networks Eastern & London are proposing to carry out New service connection on Browning Street, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 22 Oct 2024 at 13:29.

Cadent Gas logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Ebury Bridge

Cadent Gas are proposing to carry out Utility asset works on Ebury Bridge, Churchill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 13:35.

Hyperoptic logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Strutton Ground

Hyperoptic are proposing to carry out Utility asset works on Strutton Ground, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Hyperoptic on 28 Nov 2024 at 06:39.

Cadent Gas logo
Between
24 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Great Smith Street

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Great Smith Street, St James's, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 09:40.

UK Power Networks South Eastern logo
LONG TERM
Between
24 Feb and 13 Apr 2025
Details
View Map
Share
Beddington Farm Road

UK Power Networks South Eastern were proposing to carry out New service connection on Beddington Farm Road, Croydon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 13 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Sep 2024 at 13:41.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Marham Gardens

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Marham Gardens, Morden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 3 Dec 2024 at 08:10.

Thames Water logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
London Road

Thames Water are proposing to carry out Disconnection or alteration of supply on London Road, Mitcham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 06:40.

Southern Gas Networks logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Chilmark Road

Southern Gas Networks are proposing to carry out New service connection on Chilmark Road, Streatham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 23:02.

Southern Gas Networks logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Chilmark Road

Southern Gas Networks are proposing to carry out New service connection on Chilmark Road, Streatham, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:48.

Southern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Georgia Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Georgia Road, Thornton Heath, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 10:50.

Southern Gas Networks logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Georgia Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Georgia Road, Thornton Heath, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 11:18.

London Borough Of Lambeth logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Leigham Court Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Leigham Court Road, Streatham Wells, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 19 Nov 2024 at 10:35.

Thames Water logo
Between
24 Feb and 4 Mar 2025
Details
View Map
Share
Follow
Barry Road

Thames Water are proposing to carry out New service connection on Barry Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 08:18.

London Borough Of Southwark logo
LONG TERM
Between
24 Feb and 2 May 2025
Details
View Map
Share
Follow
Dulwich Village

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Dulwich Village, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Nov 2024 at 15:05.

London Borough Of Southwark logo
LONG TERM
Between
24 Feb and 2 May 2025
Details
View Map
Share
Follow
Village Way

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Village Way, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Nov 2024 at 15:11.

London Borough Of Southwark logo
LONG TERM
Between
24 Feb and 2 May 2025
Details
View Map
Share
Follow
East Dulwich Grove

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on East Dulwich Grove, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Nov 2024 at 15:18.

London Borough Of Southwark logo
LONG TERM
Between
24 Feb and 2 May 2025
Details
View Map
Share
Follow
Red Post Hill

London Borough Of Southwark are proposing to carry out Highway repair and maintenance works on Red Post Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by London Borough Of Southwark on 22 Nov 2024 at 15:08.

London Borough Of Wandsworth logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Putney High Street

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Putney High Street, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 10 Dec 2024 at 11:25.

Transport for London (TfL) logo
LONG TERM
Between
24 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Battersea Bridge

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Battersea Bridge, Battersea, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 12 Aug 2024 at 13:10.

Thames Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Wells Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wells Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 08:44.

Thames Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Wells Park Road

Thames Water are proposing to carry out Utility repair and maintenance works on Wells Park Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 29 Nov 2024 at 09:39.

Cadent Gas logo
Between
25 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Buckingham Palace Road

Cadent Gas are proposing to carry out Utility asset works on Buckingham Palace Road, Warwick, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:00.

London Borough Of Croydon logo
Between
26 Feb and 1 Mar 2025
Details
View Map
Share
Follow
High Street

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on High Street, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 4 Nov 2024 at 07:07.

Southern Gas Networks logo
Between
26 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Selhurst New Road

Southern Gas Networks are proposing to carry out roadworks on Selhurst New Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 3 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 12:56.

Thames Water logo
Between
26 Feb and 1 Mar 2025
Details
View Map
Share
Kingston Road

Thames Water were proposing to carry out Utility repair and maintenance works on Kingston Road, Raynes Park.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 1 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 12:02.

BT logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Willow View

BT are proposing to carry out Utility asset works on Willow View, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 9 Dec 2024 at 08:58.

BT logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Willow View

BT are proposing to carry out Utility asset works on Willow View, Colliers Wood, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 11 Dec 2024 at 17:07.

London Borough Of Lambeth logo
LONG TERM
Between
26 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Hillworth Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillworth Road, Brixton Rush Common, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 17 Sep 2024 at 15:41.

London Borough Of Lambeth logo
LONG TERM
Between
26 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Hillworth Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Hillworth Road, Brixton Rush Common, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 20 Sep 2024 at 12:49.

London Borough Of Lambeth logo
LONG TERM
Between
26 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Athlone Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Athlone Road, Tulse Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 17 Sep 2024 at 15:41.

London Borough Of Lambeth logo
LONG TERM
Between
26 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Athlone Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Athlone Road, Tulse Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 20 Sep 2024 at 12:59.

London Borough Of Lambeth logo
LONG TERM
Between
26 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Claverdale Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Claverdale Road, Tulse Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 17 Sep 2024 at 15:31.

London Borough Of Lambeth logo
LONG TERM
Between
26 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Claverdale Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Claverdale Road, Tulse Hill, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 20 Sep 2024 at 12:49.

London Borough Of Lambeth logo
LONG TERM
Between
26 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Craignair Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Craignair Road, Brixton Rush Common, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 17 Sep 2024 at 15:17.

London Borough Of Lambeth logo
LONG TERM
Between
26 Feb and 18 Apr 2025
Details
View Map
Share
Follow
Craignair Road

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Craignair Road, Brixton Rush Common, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 18 April 2025. The works will impact the footway only.

This roadwork event was last updated by London Borough Of Lambeth on 20 Sep 2024 at 12:49.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Dec 2024 at 13:24.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Thornton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thornton Road, Carshalton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 11 Dec 2024 at 14:27.

Southern Gas Networks logo
Between
3 and 12 Mar 2025
Details
View Map
Share
Follow
Maryland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maryland Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 11:06.

Southern Gas Networks logo
Between
3 and 12 Mar 2025
Details
View Map
Share
Follow
Maryland Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Maryland Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 11:20.

Thames Water logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Lessingham Avenue

Thames Water are proposing to carry out roadworks on Lessingham Avenue, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:36.

Thames Water logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Derinton Road

Thames Water are proposing to carry out roadworks on Derinton Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 07:35.

Thames Water logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Upper Tooting Road

Thames Water are proposing to carry out Utility asset works on Upper Tooting Road, Tooting, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 14:32.

Thames Water logo
Between
3 and 31 Mar 2025
Details
View Map
Share
Follow
Upper Tooting Road

Thames Water are proposing to carry out Utility asset works on Upper Tooting Road, Tooting, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 09:49.

Electricity Network Company logo
Between
3 and 12 Mar 2025
Details
View Map
Share
Follow
Holdernesse Road

Electricity Network Company are proposing to carry out Utility asset works on Holdernesse Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 29 Nov 2024 at 10:03.

Electricity Network Company logo
Between
3 and 12 Mar 2025
Details
View Map
Share
Follow
Glenburnie Road

Electricity Network Company are proposing to carry out Utility asset works on Glenburnie Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 29 Nov 2024 at 10:08.

Southern Gas Networks logo
Between
3 and 23 Mar 2025
Details
View Map
Share
Follow
Strathville Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Strathville Road, Southfields, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 23 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Jun 2024 at 06:46.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Earlsfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Earlsfield Road, Earlsfield, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 28 Jun 2024 at 08:45.

London Borough Of Lambeth logo
Between
3 and 17 Mar 2025
Details
View Map
Share
Follow
Kings Avenue

London Borough Of Lambeth are proposing to carry out Highway repair and maintenance works on Kings Avenue, Brixton Acre Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Lambeth on 3 Dec 2024 at 16:04.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Follow
Salcott Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Salcott Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 16:05.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Follow
Winsham Grove

Thames Water are proposing to carry out Disconnection or alteration of supply on Winsham Grove, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 15:53.

Thames Water logo
LONG TERM
Between
3 Mar and 1 Oct 2025
Details
View Map
Share
Follow
Jedburgh Street

Thames Water are proposing to carry out Disconnection or alteration of supply on Jedburgh Street, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 1 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 15:35.

Thames Water logo
LONG TERM
Between
3 Mar and 4 Aug 2025
Details
View Map
Share
Follow
Mysore Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Mysore Road, Battersea, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 14:58.

London Borough Of Wandsworth logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Putney Bridge

London Borough Of Wandsworth are proposing to carry out Works for road purposes on Putney Bridge, Putney, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Wandsworth on 10 Dec 2024 at 11:29.

Electricity Network Company logo
LONG TERM
Between
3 Mar and 2 May 2025
Details
View Map
Share
Follow
Townmead Road

Electricity Network Company are proposing to carry out Utility asset works on Townmead Road, London.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity Network Company on 29 Nov 2024 at 10:35.

UK Power Networks Eastern & London logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Rotherhithe New Road

UK Power Networks Eastern & London are proposing to carry out Statutory Infrastructure Works on Rotherhithe New Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks Eastern & London on 3 Sep 2024 at 08:27.

Thames Water logo
Between
3 and 16 Mar 2025
Details
View Map
Share
Follow
Great Suffolk Street

Thames Water are proposing to carry out Utility repair and maintenance works on Great Suffolk Street, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Dec 2024 at 07:45.

BT logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Boyson Road

BT are proposing to carry out Utility repair and maintenance works on Boyson Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Dec 2024 at 16:17.

Transport for London (TfL) logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
Elephant And Castle

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Elephant And Castle, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 11:49.

Transport for London (TfL) logo
Between
4 and 7 Mar 2025
Details
View Map
Share
Follow
New Kent Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on New Kent Road, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 15 Oct 2024 at 12:13.

BT logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Boundary Lane

BT are proposing to carry out Utility repair and maintenance works on Boundary Lane, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Dec 2024 at 16:12.

London Borough Of Croydon logo
Between
5 and 8 Mar 2025
Details
View Map
Share
Follow
Oakfield Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Oakfield Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:41.

London Borough Of Croydon logo
Between
5 and 8 Mar 2025
Details
View Map
Share
Follow
Montague Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on Montague Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:42.

London Borough Of Croydon logo
Between
5 and 8 Mar 2025
Details
View Map
Share
Follow
London Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on London Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:43.

London Borough Of Croydon logo
Between
5 and 8 Mar 2025
Details
View Map
Share
Follow
St James's Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on St James's Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:43.

London Borough Of Croydon logo
Between
5 and 8 Mar 2025
Details
View Map
Share
Follow
London Road

London Borough Of Croydon are proposing to carry out Highway repair and maintenance works on London Road, Croydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by London Borough Of Croydon on 29 Nov 2024 at 09:43.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Tavistock Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Tavistock Road, Carshalton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Dec 2024 at 16:01.

Southern Gas Networks logo
Between
10 and 30 Mar 2025
Details
View Map
Share
Follow
Khama Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Khama Road, Tooting, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 07:17.

Network Rail logo
LONG TERM
Between
10 Mar and 7 May 2025
Details
View Map
Share
Brixton Station Road

Network Rail were proposing to carry out roadworks on Brixton Station Road, Brixton Windrush, London.

These works were categorised as Major.

The works were originally planned to start 10 March 2025 and run through until 7 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 11 Dec 2024 at 14:22.

Transport for London (TfL) logo
LONG TERM
Between
10 Mar and 10 May 2025
Details
View Map
Share
Follow
Old Kent Road

Transport for London (TfL) are proposing to carry out Highway improvement works on Old Kent Road, London.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 10 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Transport for London (TfL) on 21 Nov 2024 at 12:50.

Transport for London (TfL) logo
Between
10 and 22 Mar 2025
Details
View Map
Share
Follow
Chelsea Embankment

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chelsea Embankment, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 14:05.

Transport for London (TfL) logo
Between
10 and 22 Mar 2025
Details
View Map
Share
Follow
Chelsea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chelsea Bridge Road, Churchill, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 14:14.

Transport for London (TfL) logo
Between
10 and 22 Mar 2025
Details
View Map
Share
Follow
Chelsea Bridge Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Chelsea Bridge Road, London.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 10 Dec 2024 at 14:36.

Transport for London (TfL) logo
LONG TERM
Between
10 Mar and 21 May 2025
Details
View Map
Share
Follow
Grosvenor Road

Transport for London (TfL) are proposing to carry out Highway repair and maintenance works on Grosvenor Road, Churchill, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Transport for London (TfL) on 22 Nov 2024 at 15:40.

City Of Westminster logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Lupus Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Lupus Street, Warwick, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Dec 2024 at 14:42.

City Of Westminster logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Bessborough Street

City Of Westminster are proposing to carry out Highway repair and maintenance works on Bessborough Street, Tachbrook, London.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by City Of Westminster on 2 Dec 2024 at 14:35.


Roadworks Map near to Knollys Road, LONDON, SW16 2JX

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 11 Dec 2024 23:25
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Knollys Road, LONDON, SW16 2JX (96 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
KNOLLYS ROAD, KNIGHT'S HILL 
(0.0 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Cancelled
(Scheduled: 9 Dec 2024 - 11 Dec 2024)
0.0
Details
Share
2
BT logo
CANTERBURY GROVE, KNIGHT'S HILL 
(0.2 miles)
BT
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 10 Dec 2024 15:22
(Scheduled: 9 Dec 2024 - 12 Dec 2024)
0.2
Details
Share
Follow
3
BT logo
ROMEYN ROAD, STREATHAM HILL EAST 
(0.2 miles)
BT
Remedial works - Footway - No carriageway incursion
Complete
10 Dec 2024 15:38 - 11 Dec 2024 15:58
0.2
Details
Share
4
Thames Water logo
MOUNT NOD ROAD, STREATHAM HILL EAST 
(0.3 miles)
Thames Water
Remedial works - Footway - No carriageway incursion
Planned
Scheduled: 11 Dec 2024 - 12 Dec 2024
0.3
Details
Share
Follow
5
Southern Gas Networks logo
EMERGENCY
  
WALDECK GROVE, KNIGHT'S HILL 
(0.3 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 4 Dec 2024 22:00
(Scheduled: 4 Dec 2024 - 11 Dec 2024)
0.3
Details
Share
Follow
6
London Borough Of Lambeth logo
MAJOR
  
LYDHURST AVENUE, STREATHAM HILL EAST 
(0.3 miles)
London Borough Of Lambeth
Highway repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 2 Dec 2024 - 10 Jan 2025)
0.3
Details
Share
7
London Borough Of Lambeth logo
MAJOR
  
LYDHURST AVENUE, STREATHAM HILL EAST 
(0.3 miles)
London Borough Of Lambeth
Highway repair and maintenance works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 29 Nov 2024 - 9 Jan 2025)
0.3
Details
Share
8
BT logo
PRIORESS ROAD, KNIGHT'S HILL 
(0.3 miles)
BT
Utility asset works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 12 Dec 2024 - 16 Dec 2024
0.3
Details
Share
Follow
9
Thames Water logo
MAJOR
  
NORTHSTEAD ROAD, ST MARTIN'S 
(0.3 miles)
Thames Water
Disconnection or alteration of supply - Carriageway - Road closure
Planned
Scheduled: 5 Dec 2024 - 20 Dec 2024
0.3
Details
Share
Follow
10
Thames Water logo
MAJOR
  
NORTHSTEAD ROAD, ST MARTIN'S 
(0.3 miles)
Thames Water
Disconnection or alteration of supply - Carriageway - Road closure
Planned
Scheduled: 9 Sep 2024 - 20 Dec 2024
0.3
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.
Traffic camera information is Powered by TfL Open Data