ROADWORKS SUMMARY
Garbett Street, STOKE-ON-TRENT, ST6 5RQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Garbett Street, ST6 5RQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Garbett Street, STOKE-ON-TRENT, ST6 5RQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Garbett Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Stoke-on-trent City Council logo
LONG TERM
Between
1 Mar 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Cobridge Road

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Cobridge Road, Cobridge, Stoke On Trent.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2023 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 6 Dec 2022 at 16:30.

Stoke-on-trent City Council logo
LONG TERM
Between
1 Mar 2023 and 31 Dec 2024
Details
View Map
Share
Follow
Waterloo Road

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Waterloo Road, Stoke On Trent.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 6 Dec 2022 at 16:30.

Stoke-on-trent City Council logo
LONG TERM
Between
15 Mar 2023 and 30 Mar 2025
Details
View Map
Share
Follow
College Road

Stoke-on-trent City Council are proposing to carry out Highway improvement works on College Road, Stoke-on-trent.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 26 Aug 2022 at 13:54.

Stoke-on-trent City Council logo
LONG TERM
Between
15 Mar 2023 and 30 Mar 2025
Details
View Map
Share
Follow
Avenue Road

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Avenue Road, Shelton, Stoke-on-trent.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 26 Aug 2022 at 13:54.

Stoke-on-trent City Council logo
LONG TERM
Between
15 Mar 2023 and 30 Mar 2025
Details
View Map
Share
Follow
The Parkway

Stoke-on-trent City Council are proposing to carry out Highway improvement works on The Parkway, Hanley, Stoke-on-trent.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 09:27.

Stoke-on-trent City Council logo
LONG TERM
Until
30 Mar 2025
Details
View Map
Share
Follow
Cleveland Road

Stoke-on-trent City Council are carrying out Highway improvement works on Cleveland Road, Shelton, Stoke-on-trent.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2024 at 08:00 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stoke-on-trent City Council on 17 Jul 2024 at 08:56.

Stoke-on-trent City Council logo
LONG TERM
Between
15 Mar 2023 and 30 Mar 2025
Details
View Map
Share
Follow
Harding Road

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Harding Road, Hanley, Stoke-on-trent.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 09:27.

Stoke-on-trent City Council logo
LONG TERM
Between
15 Mar 2023 and 30 Mar 2025
Details
View Map
Share
Follow
Victoria Avenue

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Victoria Avenue, Shelton, Stoke-on-trent.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 09:15.

Stoke-on-trent City Council logo
LONG TERM
Between
15 Mar 2023 and 30 Mar 2025
Details
View Map
Share
Follow
Shirley Road

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Shirley Road, Shelton, Stoke-on-trent.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 09:16.

Stoke-on-trent City Council logo
LONG TERM
Between
15 Mar 2023 and 30 Mar 2025
Details
View Map
Share
Follow
Potteries Way

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Potteries Way, Stoke-on-trent.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 10:50.

Stoke-on-trent City Council logo
LONG TERM
Between
15 Mar 2023 and 30 Mar 2025
Details
View Map
Share
Follow
Etruria Road

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Etruria Road, Stoke-on-trent.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 1 Sep 2022 at 07:42.

Stoke-on-trent City Council logo
LONG TERM
Between
15 Mar 2023 and 30 Mar 2025
Details
View Map
Share
Follow
Festival Way

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Festival Way, Etruria, Stoke-on-trent.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 1 Sep 2022 at 07:41.

Stoke-on-trent City Council logo
LONG TERM
Between
15 Mar 2023 and 30 Mar 2025
Details
View Map
Share
Follow
Trinity Street

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Trinity Street, Hanley, Stoke-on-trent.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 1 Sep 2022 at 07:42.

Stoke-on-trent City Council logo
LONG TERM
Until
3 Apr 2025
Details
View Map
Share
Follow
Lower Bethesda Street

Stoke-on-trent City Council are carrying out Highway improvement works on Lower Bethesda Street, Hanley, Stoke-on-trent.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2023 at 08:30 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stoke-on-trent City Council on 1 Nov 2023 at 10:46.

Stoke-on-trent City Council logo
LONG TERM
Until
31 Dec 2025
Details
View Map
Share
Follow
Station Road

Stoke-on-trent City Council are carrying out Highway improvement works on Station Road, Stoke, Stoke-on-trent.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 07:00 and could run through until 31 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stoke-on-trent City Council on 4 Jul 2024 at 13:16.

Stoke-on-trent City Council logo
LONG TERM
Until
30 Mar 2025
Details
View Map
Share
Follow
College Road

Stoke-on-trent City Council are carrying out Highway improvement works on College Road, Stoke-on-trent.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 27 November 2023 at 07:30 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stoke-on-trent City Council on 27 Nov 2023 at 07:53.

Stoke-on-trent City Council logo
LONG TERM
Between
12 Mar 2024 and 12 Mar 2025
Details
View Map
Share
Follow
Stoke Road

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Stoke Road, Stoke-on-trent.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2024 and could run through until 12 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 12 Mar 2024 at 12:28.

Stoke-on-trent City Council logo
LONG TERM
Until
30 Mar 2025
Details
View Map
Share
Follow
Regent Road

Stoke-on-trent City Council are carrying out Highway improvement works on Regent Road, Hanley, Stoke-on-trent.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 09:00 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stoke-on-trent City Council on 19 Jun 2024 at 12:49.

Stoke-on-trent City Council logo
LONG TERM
Between
1 Apr 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Ephraim Street

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Ephraim Street, Hanley, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 15:31.

Stoke-on-trent City Council logo
LONG TERM
Between
1 Apr 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Bucknall Road

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Bucknall Road, Hanley, Stoke-on-trent.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 11:51.

Stoke-on-trent City Council logo
LONG TERM
Between
1 Apr 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Porthill Road

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Porthill Road, Longport, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 15:26.

Stoke-on-trent City Council logo
LONG TERM
Between
1 Apr 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Station Street

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Station Street, Longport, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 15:26.

Stoke-on-trent City Council logo
LONG TERM
Between
1 Apr 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Brereton Place

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Brereton Place, Burslem, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 13:00.

Stoke-on-trent City Council logo
LONG TERM
Between
1 Apr 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Norman Avenue

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Norman Avenue, Tunstall, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 15:25.

Stoke-on-trent City Council logo
LONG TERM
Between
1 Apr 2024 and 31 Mar 2025
Details
View Map
Share
Follow
Chorley Avenue

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Chorley Avenue, Chell, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 13:56.

Staffordshire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Greenway Bank

Staffordshire County Council are carrying out Highway improvement works on Greenway Bank, Biddulph.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 10 June 2024 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:46.

Severn Trent Water logo
LONG TERM
Until
11 May 2025
Details
View Map
Share
Follow
Etruria Way

Severn Trent Water are carrying out Utility asset works on Etruria Way, Newcastle Under Lyme.

These works are categorised as Major.

The works started on 24 June 2024 at 09:26 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Jun 2024 at 08:26.

Stoke-on-trent City Council logo
LONG TERM
Until
30 Mar 2025
Details
View Map
Share
Follow
College Road

Stoke-on-trent City Council are carrying out Highway improvement works on College Road, Stoke-on-trent.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 September 2024 at 07:30 and could run through until 30 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Stoke-on-trent City Council on 9 Oct 2024 at 09:23.

Staffordshire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Beasley Avenue

Staffordshire County Council are carrying out Highway improvement works on Beasley Avenue, Newcastle Under Lyme.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 00:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 21 Nov 2024 at 10:33.

Staffordshire County Council logo
LONG TERM
Between
23 Sep 2024 and 5 Aug 2025
Details
View Map
Share
Follow
High Street

Staffordshire County Council are proposing to carry out Highway improvement works on High Street, Chesterton, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 5 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 14:20.

Cadent Gas logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
Lichfield Street

Cadent Gas are carrying out Utility repair and maintenance works on Lichfield Street, Stoke-on-trent.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 13:00 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 11:34.

Western Power Distribution (West Midlands) logo
LONG TERM
Until
4 Dec 2024
Details
View Map
Share
Follow
West Avenue

Western Power Distribution (West Midlands) are carrying out Utility asset works on West Avenue, Kidsgrove.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 15:00 and could run through until 4 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 21 Oct 2024 at 16:02.

Western Power Distribution (West Midlands) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Biddulph Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Biddulph Road, Chell, Stoke-on-trent.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 26 Jul 2024 at 10:04.

Western Power Distribution (West Midlands) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Biddulph Road

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Biddulph Road, Chell, Stoke-on-trent.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 8 Aug 2024 at 13:58.

Staffordshire County Council logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Scot Hay Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Scot Hay Road, Silverdale, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 15:30.

Staffordshire County Council logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Kents Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Kents Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 17:02.

Stoke-on-trent City Council logo
Finishing
Friday
Details
View Map
Share
Follow
Little Chell Lane

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Little Chell Lane, Little Chell, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Stoke-on-trent City Council on 21 Nov 2024 at 15:04.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Chatterley Drive

Cadent Gas are proposing to carry out Utility asset works on Chatterley Drive, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 14:39.

Severn Trent Water logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Hambro Place

Severn Trent Water are proposing to carry out Utility asset works on Hambro Place, Fegg Hayes, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Aug 2024 at 14:59.

Severn Trent Water logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Hambro Place

Severn Trent Water are proposing to carry out Utility asset works on Hambro Place, Fegg Hayes, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Aug 2024 at 08:57.

Severn Trent Water logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Hambro Place

Severn Trent Water are carrying out Utility asset works on Hambro Place, Fegg Hayes, Stoke-on-trent.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 12:30 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 4 Nov 2024 at 13:45.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Greasley Road

Severn Trent Water are carrying out Utility repair and maintenance works on Greasley Road, Stoke-on-trent.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 15:07.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Sparch Hollow

Cadent Gas are proposing to carry out Utility asset works on Sparch Hollow, Newcastle Under Lyme.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 12:00.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Hempstalls Lane

Cadent Gas are proposing to carry out Utility asset works on Hempstalls Lane, Newcastle Under Lyme.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 12:00.

Cadent Gas logo
Finishing
Thursday
Details
View Map
Share
Follow
Hoon Avenue

Cadent Gas are proposing to carry out Utility asset works on Hoon Avenue, Newcastle Under Lyme.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Aug 2024 at 12:00.

Western Power Distribution (West Midlands) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Victoria Street

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Victoria Street, Chesterton, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 27 Sep 2024 at 13:52.

Western Power Distribution (West Midlands) logo
Finishing
Friday
Details
View Map
Share
Follow
Victoria Street

Western Power Distribution (West Midlands) are carrying out New service connection on Victoria Street, Chesterton, Newcastle Under Lyme.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 12:07 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 22 Nov 2024 at 16:02.

Vodafone logo
Finishing
Today
Details
View Map
Share
Follow
Etruria Road

Vodafone are carrying out Utility repair and maintenance works on Etruria Road, Stoke-on-trent.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 21:00 and could run through until 23 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 19 Nov 2024 at 08:38.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Nelson Bank

Cadent Gas are proposing to carry out Utility asset works on Nelson Bank, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 29 Aug 2024 at 14:39.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Nelson Bank

Cadent Gas are carrying out Utility asset works on Nelson Bank, Newcastle Under Lyme.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 08:00 and could run through until 29 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 09:07.

Cadent Gas logo
Until
2 Dec 2024
Details
View Map
Share
Follow
Porthill Bank

Cadent Gas are carrying out Utility repair and maintenance works on Porthill Bank, Newcastle Under Lyme.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 15:30 and could run through until 2 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:37.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Moorland Road

Severn Trent Water are carrying out Utility repair and maintenance works on Moorland Road, Stoke-on-trent.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 16:24 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 09:17.

Cadent Gas logo
Between
19 Nov and 16 Dec 2024
Details
View Map
Share
Rydal Way

Cadent Gas were proposing to carry out Utility asset works on Rydal Way, Alsager.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 09:46.

Cadent Gas logo
LONG TERM
Between
19 Nov 2024 and 3 Feb 2025
Details
View Map
Share
Sandbach Road North

Cadent Gas were proposing to carry out Utility asset works on Sandbach Road North, Alsager.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 November 2024 and run through until 3 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 12:13.

Cadent Gas logo
Between
22 Nov and 6 Dec 2024
Details
View Map
Share
Gloucester Road

Cadent Gas were proposing to carry out Utility asset works on Gloucester Road, Newcastle Under Lyme.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 November 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 15:41.

United Utilities Water (formerly North West Water) logo
Finishing
Thursday
Details
View Map
Share
Follow
Linley Road

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Linley Road, Alsager.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 10:00 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Nov 2024 at 12:28.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Stubbs Street

Staffordshire County Council are carrying out Highway improvement works on Stubbs Street, Newcastle Under Lyme.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 November 2024 at 12:06 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 1 Nov 2024 at 12:18.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Keele Road

Staffordshire County Council are proposing to carry out Highway improvement works on Keele Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:44.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hanover Street

Staffordshire County Council are proposing to carry out Highway improvement works on Hanover Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Aug 2024 at 12:35.

Staffordshire County Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Scot Hay Road

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Scot Hay Road, Silverdale, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 15:47.

Staffordshire County Council logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Kents Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Kents Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 15:47.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Lower Milehouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Lower Milehouse Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Sep 2024 at 10:41.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Bellfield View

Staffordshire County Council are proposing to carry out Highway improvement works on Bellfield View, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 22 Aug 2024 at 10:25.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Kelvin Street

Staffordshire County Council are proposing to carry out Highway improvement works on Kelvin Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Sep 2024 at 09:35.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Watlands View

Staffordshire County Council are proposing to carry out Highway improvement works on Watlands View, Dimsdale, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Aug 2024 at 13:39.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Keeling Street

Staffordshire County Council are proposing to carry out Highway improvement works on Keeling Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Aug 2024 at 13:25.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Boulton Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Boulton Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Sep 2024 at 11:43.

Severn Trent Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Boulton Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Boulton Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2024 at 14:58.

Western Power Distribution (West Midlands) logo
Between
25 Nov and 18 Dec 2024
Details
View Map
Share
Follow
Apedale Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Apedale Road, Chesterton, Newcastle Under Lyme.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Sep 2024 at 14:54.

Western Power Distribution (West Midlands) logo
Between
25 Nov and 18 Dec 2024
Details
View Map
Share
Red Lion Square

Western Power Distribution (West Midlands) were proposing to carry out New service connection on Red Lion Square, Newcastle Under Lyme.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 28 Oct 2024 at 10:24.

Western Power Distribution (West Midlands) logo
Between
25 Nov and 18 Dec 2024
Details
View Map
Share
Victoria Street

Western Power Distribution (West Midlands) were proposing to carry out New service connection on Victoria Street, Chesterton, Newcastle Under Lyme.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Oct 2024 at 10:50.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Chemical Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Chemical Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Aug 2024 at 12:22.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Crackley Bank

Staffordshire County Council were proposing to carry out Highway improvement works on Crackley Bank, Newcastle Under Lyme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Aug 2024 at 15:01.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Queen Street

Staffordshire County Council are proposing to carry out Highway improvement works on Queen Street, Audley, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Aug 2024 at 13:25.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Barthomley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Barthomley Road, Barthomley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 14:15.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are proposing to carry out New service connection on Sandy Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 13 Sep 2024 at 11:58.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Mere Lake Road

Staffordshire County Council are proposing to carry out Highway improvement works on Mere Lake Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Aug 2024 at 13:25.

Severn Trent Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Old Butt Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Old Butt Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 11 Sep 2024 at 14:16.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Liverpool Road

Cadent Gas were proposing to carry out Utility asset works on Liverpool Road, Kidsgrove.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 09:23.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Liverpool Road East

Cadent Gas were proposing to carry out Utility asset works on Liverpool Road East, Newcastle Under Lyme.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 11:46.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Derwent Crescent

Staffordshire County Council are proposing to carry out Highway improvement works on Derwent Crescent, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Aug 2024 at 13:39.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Everest Road

Staffordshire County Council are proposing to carry out Highway improvement works on Everest Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Aug 2024 at 13:39.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Cobmoor Road

Staffordshire County Council were proposing to carry out Highway improvement works on Cobmoor Road, Newcastle Under Lyme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Aug 2024 at 13:39.

Cadent Gas logo
LONG TERM
Between
25 Nov 2024 and 24 Jan 2025
Details
View Map
Share
Sandbach Road North

Cadent Gas were proposing to carry out Utility asset works on Sandbach Road North, Alsager.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 24 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 10:30.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Congleton Road

Staffordshire County Council are proposing to carry out Highway improvement works on Congleton Road, Mow Cop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Aug 2024 at 15:02.

Staffordshire County Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Lask Edge Road

Staffordshire County Council are proposing to carry out Highway improvement works on Lask Edge Road, Leek.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Oct 2024 at 14:42.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Well Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Well Lane, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 12:50.

Staffordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Park Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Park Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 14:40.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Moss Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Moss Hill, Stockton Brook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Sep 2024 at 10:13.

Severn Trent Water logo
Finishing
Friday
Details
View Map
Share
Follow
Moss Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Moss Hill, Stockton Brook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2024 at 16:17.

Severn Trent Water logo
Between
2 and 6 Dec 2024
Details
View Map
Share
High Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on High Street, Newcastle Under Lyme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 12 Sep 2024 at 09:55.

Virgin Media logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Liverpool Road

Virgin Media are proposing to carry out Remedial works on Liverpool Road, Knutton, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 28 Aug 2024 at 08:58.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Minton Street

Staffordshire County Council are proposing to carry out Highway improvement works on Minton Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 09:14.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Boulton Street

Staffordshire County Council are proposing to carry out Highway improvement works on Boulton Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 09:14.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Leek Road

Staffordshire County Council were proposing to carry out Highway improvement works on Leek Road, Stockton Brook.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 10:49.

Severn Trent Water logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Stanley Bank

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stanley Bank, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 16:00.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Leek Road

Staffordshire County Council were proposing to carry out Highway improvement works on Leek Road, Endon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 4 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 13:50.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Brookfield Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Brookfield Avenue, Endon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 29 Aug 2024 at 08:09.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Woodstock Road

Staffordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 12:03.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Leek Road

Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 10:19.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Church Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Church Lane, Endon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 29 Aug 2024 at 08:09.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Oldcott Crescent

Staffordshire County Council are proposing to carry out Highway improvement works on Oldcott Crescent, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 12:03.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Oldcott Crescent

Staffordshire County Council are proposing to carry out Highway improvement works on Oldcott Crescent, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Sep 2024 at 15:28.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Ravenscliffe Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ravenscliffe Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 12:03.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Ravenscliffe Road

Staffordshire County Council are proposing to carry out Highway improvement works on Ravenscliffe Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Sep 2024 at 15:28.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Gratton Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Gratton Lane, Gratton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 11:17.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Gratton Lane

Staffordshire County Council are proposing to carry out Remedial works on Gratton Lane, Gratton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 11:18.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Brown Lees Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brown Lees Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 12:16.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Orme Road

Staffordshire County Council are proposing to carry out Highway improvement works on Orme Road, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 10:19.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Meadowside

Staffordshire County Council are proposing to carry out Highway improvement works on Meadowside, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 09:53.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Biddulph Road

Staffordshire County Council are proposing to carry out Highway improvement works on Biddulph Road, Mow Cop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2024 at 14:17.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Akesmore Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Akesmore Lane, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2024 at 14:17.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Tower Hill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Tower Hill Road, Mow Cop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 09:53.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Shepherd Street

Staffordshire County Council are proposing to carry out Highway improvement works on Shepherd Street, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 10:06.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Moorfield Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Moorfield Avenue, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 09:53.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Gunn Street

Staffordshire County Council are proposing to carry out Highway improvement works on Gunn Street, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 10:19.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Albert Street

Staffordshire County Council are proposing to carry out Highway improvement works on Albert Street, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Aug 2024 at 14:03.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Farmside Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Farmside Lane, Biddulph Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 9 Sep 2024 at 15:48.

Staffordshire County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Stoney Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Stoney Lane, Biddulph Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 10:06.

Staffordshire County Council logo
Between
2 and 4 Dec 2024
Details
View Map
Share
Follow
Stanways Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Stanways Lane, Biddulph Moor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 4 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Aug 2024 at 10:19.

Staffordshire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Barracks Road

Staffordshire County Council were proposing to carry out Highway improvement works on Barracks Road, Newcastle Under Lyme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 6 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 3 Sep 2024 at 11:13.

Staffordshire County Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Barracks Road

Staffordshire County Council are proposing to carry out Highway improvement works on Barracks Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 11:20.

Staffordshire County Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Queen Street

Staffordshire County Council were proposing to carry out Highway improvement works on Queen Street, The Brampton, Newcastle Under Lyme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 December 2024 and run through until 5 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 12:44.

Staffordshire County Council logo
Between
3 and 6 Dec 2024
Details
View Map
Share
Follow
Woodland Street

Staffordshire County Council are proposing to carry out Highway improvement works on Woodland Street, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 08:22.

Staffordshire County Council logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Seabridge Road

Staffordshire County Council are proposing to carry out Highway improvement works on Seabridge Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:31.

Staffordshire County Council logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Bankside

Staffordshire County Council are proposing to carry out Highway improvement works on Bankside, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:31.

Staffordshire County Council logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Watermills Road

Staffordshire County Council are proposing to carry out Highway improvement works on Watermills Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Oct 2024 at 14:12.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Bursley Way

Staffordshire County Council are proposing to carry out Highway improvement works on Bursley Way, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Sep 2024 at 09:29.

Severn Trent Water logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Moorland Road

Severn Trent Water are proposing to carry out Utility asset works on Moorland Road, Burslem, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 11:55.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Eardleyend Road

Staffordshire County Council are proposing to carry out Highway improvement works on Eardleyend Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 13:50.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Woodhouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 16:12.

Cadent Gas logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
Ravenscliffe Road

Cadent Gas are proposing to carry out Utility asset works on Ravenscliffe Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 15:14.

Staffordshire County Council logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Mount Road

Staffordshire County Council are proposing to carry out Highway improvement works on Mount Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 09:20.

Staffordshire County Council logo
Between
9 and 12 Dec 2024
Details
View Map
Share
Follow
Whitehill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Whitehill Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 09:20.

Staffordshire County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Mill Hayes Road

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Hayes Road, Knypersley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Nov 2024 at 08:24.

Staffordshire County Council logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Rowhurst Close

Staffordshire County Council are proposing to carry out Highway improvement works on Rowhurst Close, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 12:23.

Staffordshire County Council logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Queen Street

Staffordshire County Council are proposing to carry out Highway improvement works on Queen Street, Audley, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 12:36.

Staffordshire County Council logo
Between
10 and 13 Dec 2024
Details
View Map
Share
Follow
Boon Hill Road

Staffordshire County Council are proposing to carry out Highway improvement works on Boon Hill Road, Bignall End, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 12:23.

Staffordshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Nelson Street

Staffordshire County Council are proposing to carry out Highway improvement works on Nelson Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.

Staffordshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Minton Street

Staffordshire County Council are proposing to carry out Highway improvement works on Minton Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.

Staffordshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Ellison Street

Staffordshire County Council are proposing to carry out Highway improvement works on Ellison Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.

Staffordshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Boulton Street

Staffordshire County Council are proposing to carry out Highway improvement works on Boulton Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.

Staffordshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Keeling Street

Staffordshire County Council are proposing to carry out Highway improvement works on Keeling Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.

Staffordshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Templar Terrace

Staffordshire County Council are proposing to carry out Highway improvement works on Templar Terrace, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.

Staffordshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Audley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Audley Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 09:08.

Staffordshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Cross Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Cross Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:23.

Staffordshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Hough Hill

Staffordshire County Council are proposing to carry out Highway improvement works on Hough Hill, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 10:26.

Staffordshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Mere Lake Road

Staffordshire County Council are proposing to carry out Highway improvement works on Mere Lake Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.

Staffordshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Brook Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Brook Lane, Endon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 10:26.

Staffordshire County Council logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 10:26.

Cadent Gas logo
LONG TERM
Between
12 Dec 2024 and 26 Feb 2025
Details
View Map
Share
Sandbach Road North

Cadent Gas were proposing to carry out Utility asset works on Sandbach Road North, Alsager.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 December 2024 and run through until 26 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 11:55.

Cadent Gas logo
LONG TERM
Between
12 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Rydal Way

Cadent Gas are proposing to carry out Utility asset works on Rydal Way, Alsager.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 09:39.

Cadent Gas logo
LONG TERM
Between
12 Dec 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Sandbach Road North

Cadent Gas are proposing to carry out Utility asset works on Sandbach Road North, Alsager.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 December 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 09:47.

Stoke-on-trent City Council logo
LONG TERM
Between
15 Dec 2024 and 15 Jun 2025
Details
View Map
Share
Follow
Westport Road

Stoke-on-trent City Council are proposing to carry out Highway improvement works on Westport Road, Burslem, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 December 2024 and could run through until 15 June 2025. The works will impact the footway, carriageway and cycleway.

This roadwork event was last updated by Stoke-on-trent City Council on 19 Sep 2024 at 14:14.

Staffordshire County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Barracks Road

Staffordshire County Council were proposing to carry out Highway improvement works on Barracks Road, Newcastle Under Lyme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 09:32.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Sneyd Terrace

Staffordshire County Council are proposing to carry out Highway improvement works on Sneyd Terrace, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 08:48.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Newcastle Street

Staffordshire County Council are proposing to carry out Highway improvement works on Newcastle Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 14:40.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Peebles Road

Staffordshire County Council are proposing to carry out Highway improvement works on Peebles Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 08:22.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Wulstan Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Wulstan Drive, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 15:19.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Basford Park Road

Staffordshire County Council are proposing to carry out Highway improvement works on Basford Park Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 08:48.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Wilmot Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Wilmot Drive, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 15:19.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Hempstalls Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hempstalls Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 14:40.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Alexandra Road

Staffordshire County Council were proposing to carry out Highway improvement works on Alexandra Road, Newcastle Under Lyme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:40.

Staffordshire County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Crackley Bank

Staffordshire County Council are proposing to carry out Highway improvement works on Crackley Bank, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:39.

Staffordshire County Council logo
Between
16 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Chemical Lane

Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Chemical Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 16:38.

Staffordshire County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Barthomley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Barthomley Road, Barthomley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 10:22.

Staffordshire County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Leek Road

Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Stockton Brook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:08.

Staffordshire County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Leek Road

Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Endon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:08.

Staffordshire County Council logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Willfield Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Willfield Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:35.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Woodhouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 13:17.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Brook Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Brook Lane, Endon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 15:07.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Stonebank Road

Staffordshire County Council are proposing to carry out Highway improvement works on Stonebank Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 08:34.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Mount Road

Staffordshire County Council are proposing to carry out Highway improvement works on Mount Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 09:37.

Severn Trent Water logo
Between
16 and 19 Dec 2024
Details
View Map
Share
Follow
Old Butt Lane

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Old Butt Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 16:15.

Staffordshire County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Congleton Road

Staffordshire County Council are proposing to carry out Highway improvement works on Congleton Road, Mow Cop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:35.

Staffordshire County Council logo
Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Dimsdale Parade East

Staffordshire County Council are proposing to carry out Highway improvement works on Dimsdale Parade East, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 11:04.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Newcastle Street

Staffordshire County Council are proposing to carry out Highway improvement works on Newcastle Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 15:51.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Wulstan Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Wulstan Drive, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 15:47.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Basford Park Road

Staffordshire County Council are proposing to carry out Highway improvement works on Basford Park Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 15:20.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Wilmot Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Wilmot Drive, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 11:04.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Hempstalls Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hempstalls Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 14:53.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Alexandra Road

Staffordshire County Council are proposing to carry out Highway improvement works on Alexandra Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 15:06.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Dimsdale Parade East

Staffordshire County Council are proposing to carry out Highway improvement works on Dimsdale Parade East, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 11:04.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Eaves Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Eaves Lane, Armshead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 11:27.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Park Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Park Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 15:39.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Great Oak Road

Staffordshire County Council are proposing to carry out Highway improvement works on Great Oak Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 15:25.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Willfield Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Willfield Lane, Stockton Brook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:23.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Eardleyend Road

Staffordshire County Council are proposing to carry out Highway improvement works on Eardleyend Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 15:25.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Overland Drive

Staffordshire County Council were proposing to carry out Highway improvement works on Overland Drive, Brown Edge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:49.

Staffordshire County Council logo
Between
23 and 25 Dec 2024
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 25 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 15:06.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Gloucester Road

Staffordshire County Council were proposing to carry out Highway improvement works on Gloucester Road, Newcastle Under Lyme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 16:14.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Newchapel Road

Staffordshire County Council are proposing to carry out Highway improvement works on Newchapel Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 10:34.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Mill Hayes Road

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Hayes Road, Knypersley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 16:01.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Mow Cop Road

Staffordshire County Council are proposing to carry out Highway improvement works on Mow Cop Road, Mow Cop, Kidsgrove.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 10:34.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Woodland Street

Staffordshire County Council are proposing to carry out Highway improvement works on Woodland Street, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 10:14.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Warwick Street

Staffordshire County Council are proposing to carry out Highway improvement works on Warwick Street, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 15:56.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Warwick Street

Staffordshire County Council were proposing to carry out Highway improvement works on Warwick Street, Biddulph.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 18:56.

Staffordshire County Council logo
Between
23 and 26 Dec 2024
Details
View Map
Share
Follow
Church Road

Staffordshire County Council are proposing to carry out Highway improvement works on Church Road, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 12:22.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Lask Edge Road

Staffordshire County Council are proposing to carry out Highway improvement works on Lask Edge Road, Leek.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:49.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Thames Drive

Staffordshire County Council were proposing to carry out Highway improvement works on Thames Drive, Biddulph.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 10:49.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Meadows Way

Staffordshire County Council were proposing to carry out Highway improvement works on Meadows Way, Biddulph.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:49.

Staffordshire County Council logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Well Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Well Lane, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:49.

Staffordshire County Council logo
Between
24 and 27 Dec 2024
Details
View Map
Share
Follow
Orme Road

Staffordshire County Council are proposing to carry out Highway improvement works on Orme Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 15:47.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Silverdale Road

Staffordshire County Council are proposing to carry out Highway improvement works on Silverdale Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 12:56.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Wolstanton Road

Staffordshire County Council were proposing to carry out Highway improvement works on Wolstanton Road, Newcastle Under Lyme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 17:02.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Parkhouse Road West

Staffordshire County Council are proposing to carry out Highway improvement works on Parkhouse Road West, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 13:42.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Stanley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Stanley Road, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 12:45.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Stanley Bank

Staffordshire County Council are proposing to carry out Highway improvement works on Stanley Bank, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 12:32.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Post Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Post Lane, Stanley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 13:13.

Staffordshire County Council logo
Between
30 Dec 2024 and 1 Jan 2025
Details
View Map
Share
Follow
The Rocks

Staffordshire County Council are proposing to carry out Highway improvement works on The Rocks, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 11:04.

Staffordshire County Council logo
Between
30 Dec 2024 and 1 Jan 2025
Details
View Map
Share
Follow
Linley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Linley Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 1 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 13:42.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Tongue Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Tongue Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 12:07.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
St Davids Way

Staffordshire County Council are proposing to carry out Highway improvement works on St Davids Way, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 14:48.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Access Between Conway Road Service Road And Park Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Access Between Conway Road Service Road And Park Lane, Knypersley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 11:28.

Staffordshire County Council logo
Between
30 Dec 2024 and 2 Jan 2025
Details
View Map
Share
Follow
Moorfield Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Moorfield Avenue, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 13:10.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
East Drive

Staffordshire County Council are proposing to carry out Highway improvement works on East Drive, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 14:36.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Lawton Street

Staffordshire County Council are proposing to carry out Highway improvement works on Lawton Street, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 14:36.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Thames Drive

Staffordshire County Council were proposing to carry out Highway improvement works on Thames Drive, Biddulph.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Sep 2024 at 16:48.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Marshfield Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Marshfield Lane, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 12:19.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Long Valley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Long Valley Road, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 11:42.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Mow Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mow Lane, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 12:45.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Marsh Green Road

Staffordshire County Council are proposing to carry out Highway improvement works on Marsh Green Road, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 11:54.

Staffordshire County Council logo
Between
30 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Baileys Bank

Staffordshire County Council are proposing to carry out Highway improvement works on Baileys Bank, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 12:19.

Staffordshire County Council logo
Between
31 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Post Lane

Staffordshire County Council were proposing to carry out Highway improvement works on Post Lane, Stanley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Sep 2024 at 12:02.

Staffordshire County Council logo
Between
31 Dec 2024 and 3 Jan 2025
Details
View Map
Share
Follow
Park Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Park Lane, Knypersley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 14:48.

Cadent Gas logo
Between
2 and 16 Jan 2025
Details
View Map
Share
Follow
Gloucester Road

Cadent Gas are proposing to carry out Utility asset works on Gloucester Road, Newcastle Under Lyme.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:57.

Virgin Media logo
Between
3 and 17 Jan 2025
Details
View Map
Share
Follow
Liverpool Road

Virgin Media are proposing to carry out Utility asset works on Liverpool Road, Cross Heath, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 09:10.

Staffordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Stubbs Gate

Staffordshire County Council are proposing to carry out Highway improvement works on Stubbs Gate, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 14:59.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
York Street

Cadent Gas are proposing to carry out Utility asset works on York Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 11:04.

Virgin Media logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Liverpool Road

Virgin Media were proposing to carry out Utility asset works on Liverpool Road, Cross Heath, Newcastle Under Lyme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 18 Oct 2024 at 16:19.

Virgin Media logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Liverpool Road

Virgin Media are proposing to carry out Utility asset works on Liverpool Road, Cross Heath, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 18 Oct 2024 at 16:20.

Severn Trent Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Westfield Avenue

Severn Trent Water are proposing to carry out New service connection on Westfield Avenue, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 11:11.

Staffordshire County Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Post Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Post Lane, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 09:22.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Brookfield Avenue

Staffordshire County Council are proposing to carry out Highway improvement works on Brookfield Avenue, Endon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 11:40.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Sytch Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sytch Road, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 26 Sep 2024 at 12:53.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Sytch Road

Staffordshire County Council are proposing to carry out Highway improvement works on Sytch Road, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 27 Sep 2024 at 08:19.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Church Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Church Lane, Endon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 11:40.

Staffordshire County Council logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Overland Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Overland Drive, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 10:15.

Cadent Gas logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Liverpool Road

Cadent Gas are proposing to carry out Utility asset works on Liverpool Road, Kidsgrove.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:57.

Staffordshire County Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Blackwood Hill Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Blackwood Hill Lane, Gratton, Endon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 13:52.

Staffordshire County Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Brown Lees Road

Staffordshire County Council are proposing to carry out Highway improvement works on Brown Lees Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 14:32.

Staffordshire County Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Barrage Road

Staffordshire County Council are proposing to carry out Highway improvement works on Barrage Road, Ladymoor Gate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 10:30.

Western Power Distribution (West Midlands) logo
Between
6 and 22 Jan 2025
Details
View Map
Share
Follow
Access Between Conway Road Service Road And Park Lane

Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Access Between Conway Road Service Road And Park Lane, Knypersley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 9 Oct 2024 at 13:07.

Staffordshire County Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
St Johns Road

Staffordshire County Council are proposing to carry out Highway improvement works on St Johns Road, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 10:15.

Staffordshire County Council logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Slater Street

Staffordshire County Council are proposing to carry out Highway improvement works on Slater Street, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 10:15.

Staffordshire County Council logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Alsager Road

Staffordshire County Council are proposing to carry out Highway improvement works on Alsager Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 08:09.

Staffordshire County Council logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Holehouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Holehouse Lane, Ladymoor Gate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 11:40.

Staffordshire County Council logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Judgefield Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Judgefield Lane, Childerplay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 08:09.

Staffordshire County Council logo
Between
7 and 10 Jan 2025
Details
View Map
Share
Follow
Greenway Bank

Staffordshire County Council are proposing to carry out Highway improvement works on Greenway Bank, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 08:09.

Severn Trent Water logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
The Rocks

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Rocks, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 09:22.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Clayton Road

Staffordshire County Council are proposing to carry out Highway improvement works on Clayton Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 22 Nov 2024 at 14:12.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Nelson Street

Staffordshire County Council are proposing to carry out Highway improvement works on Nelson Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 09:02.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Ellison Street

Staffordshire County Council are proposing to carry out Highway improvement works on Ellison Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 09:15.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Templar Terrace

Staffordshire County Council are proposing to carry out Highway improvement works on Templar Terrace, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 09:27.

Cadent Gas logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Hallwater

Cadent Gas are proposing to carry out New service connection on Hallwater, Endon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:05.

Staffordshire County Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Tongue Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Tongue Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 08:09.

United Utilities Water (formerly North West Water) logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Old Butt Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Old Butt Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Sep 2024 at 11:17.

Cadent Gas logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Furlong Lane

Cadent Gas are proposing to carry out New service connection on Furlong Lane, Burslem, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:43.

Cadent Gas logo
Between
14 and 17 Jan 2025
Details
View Map
Share
Follow
Furlong Lane

Cadent Gas are proposing to carry out New service connection on Furlong Lane, Burslem, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:33.

BT logo
Between
14 and 16 Jan 2025
Details
View Map
Share
Follow
Park Lane

BT are proposing to carry out Utility asset works on Park Lane, Knypersley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Nov 2024 at 12:52.

Severn Trent Water logo
Between
15 and 17 Jan 2025
Details
View Map
Share
Follow
The Rocks

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Rocks, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 15:49.

Severn Trent Water logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Queens Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Queens Road, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 09:47.

Severn Trent Water logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Queens Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Queens Road, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 15:24.

Severn Trent Water logo
Between
20 and 24 Jan 2025
Details
View Map
Share
High Street

Severn Trent Water were proposing to carry out Utility repair and maintenance works on High Street, Newcastle Under Lyme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 10:54.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Lower Milehouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Lower Milehouse Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 09:06.

Severn Trent Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
Stanley Bank

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stanley Bank, Stanley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 6 Nov 2024 at 07:18.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Wedgwood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wedgwood Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 09:16.

Staffordshire County Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Woodland Street

Staffordshire County Council are proposing to carry out Highway improvement works on Woodland Street, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 15:07.

Staffordshire County Council logo
Between
21 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Boathorse Road

Staffordshire County Council are proposing to carry out Highway improvement works on Boathorse Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 15:47.

Staffordshire County Council logo
Between
21 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Boathorse Road

Staffordshire County Council are proposing to carry out Highway improvement works on Boathorse Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 13:10.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Orme Road

Staffordshire County Council are proposing to carry out Highway improvement works on Orme Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 14:34.

Vodafone logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Etruria Road

Vodafone are proposing to carry out Utility repair and maintenance works on Etruria Road, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Vodafone on 5 Nov 2024 at 15:36.

Severn Trent Water logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Greasley Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Greasley Road, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 17 Oct 2024 at 12:50.

Severn Trent Water logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Greasley Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Greasley Road, Stoke-on-trent.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 4 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 18:22.

Severn Trent Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Stanley Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stanley Road, Stockton Brook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 17:27.

Severn Trent Water logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Stanley Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stanley Road, Stockton Brook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 09:15.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Cross Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Cross Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 14:48.

Staffordshire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Moss Hill

Staffordshire County Council are proposing to carry out Highway improvement works on Moss Hill, Stockton Brook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 11:01.

Staffordshire County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Overland Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Overland Drive, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 10:20.

Staffordshire County Council logo
Between
27 and 30 Jan 2025
Details
View Map
Share
Follow
Barrage Road

Staffordshire County Council are proposing to carry out Highway improvement works on Barrage Road, Ladymoor Gate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 09:53.

Staffordshire County Council logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Slater Street

Staffordshire County Council are proposing to carry out Highway improvement works on Slater Street, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 09:53.

Virgin Media logo
Between
28 Jan and 11 Feb 2025
Details
View Map
Share
Liverpool Road

Virgin Media were proposing to carry out Utility asset works on Liverpool Road, Cross Heath, Newcastle Under Lyme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 11 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 29 Oct 2024 at 09:54.

Cadent Gas logo
Between
28 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Sandy Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Sandy Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 14:00.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Stubbs Street

Staffordshire County Council are proposing to carry out Highway improvement works on Stubbs Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 09:11.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Hassell Street

Staffordshire County Council are proposing to carry out Highway improvement works on Hassell Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 10:04.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Sneyd Terrace

Staffordshire County Council are proposing to carry out Highway improvement works on Sneyd Terrace, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 10:18.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Newcastle Street

Staffordshire County Council are proposing to carry out Highway improvement works on Newcastle Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 10:43.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Peebles Road

Staffordshire County Council are proposing to carry out Highway improvement works on Peebles Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 15:02.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Wulstan Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Wulstan Drive, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 11:17.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Basford Park Road

Staffordshire County Council are proposing to carry out Highway improvement works on Basford Park Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 09:26.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Lower Milehouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Lower Milehouse Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 12:15.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Wilmot Drive

Staffordshire County Council are proposing to carry out Highway improvement works on Wilmot Drive, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 10:56.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Hempstalls Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Hempstalls Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 10:30.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Alexandra Road

Staffordshire County Council are proposing to carry out Highway improvement works on Alexandra Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 13:32.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Dimsdale Parade East

Staffordshire County Council are proposing to carry out Highway improvement works on Dimsdale Parade East, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 09:10.

Murphy Power Distribution logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Audley Road

Murphy Power Distribution are proposing to carry out Utility asset works on Audley Road, Newcastle Under Lyme.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 18 Nov 2024 at 11:18.

Severn Trent Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Westfield Avenue

Severn Trent Water are proposing to carry out New service connection on Westfield Avenue, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 12:27.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Barthomley Road

Staffordshire County Council are proposing to carry out Highway improvement works on Barthomley Road, Barthomley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 08:57.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Park Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Park Lane, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 08:44.

Cadent Gas logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Edgefields Lane

Cadent Gas are proposing to carry out Disconnection or alteration of supply on Edgefields Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 13:30.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Stonebank Road

Staffordshire County Council are proposing to carry out Highway improvement works on Stonebank Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 09:51.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Congleton Road

Staffordshire County Council are proposing to carry out Highway improvement works on Congleton Road, Mow Cop.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 08:41.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Mow Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mow Lane, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 11:32.

Staffordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Well Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Well Lane, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 12:02.

Virgin Media logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
Liverpool Road

Virgin Media are proposing to carry out Utility asset works on Liverpool Road, Cross Heath, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 4 Nov 2024 at 11:40.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Peebles Road

Staffordshire County Council are proposing to carry out Highway improvement works on Peebles Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:53.

Severn Trent Water logo
Between
10 and 18 Feb 2025
Details
View Map
Share
Follow
Silverdale Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Silverdale Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 15:59.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Alsager Road

Staffordshire County Council are proposing to carry out Highway improvement works on Alsager Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 10:35.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Wedgwood Road

Staffordshire County Council are proposing to carry out Highway improvement works on Wedgwood Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 11:04.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Staffordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:04.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Woodhouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:46.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Woodhouse Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:26.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Hough Hill

Staffordshire County Council are proposing to carry out Highway improvement works on Hough Hill, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:13.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Brook Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Brook Lane, Endon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:26.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Tongue Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Tongue Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 10:50.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Broad Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Brown Edge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:26.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Mount Road

Staffordshire County Council are proposing to carry out Highway improvement works on Mount Road, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 10:06.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Judgefield Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Judgefield Lane, Childerplay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 10:50.

Staffordshire County Council logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Greenway Bank

Staffordshire County Council are proposing to carry out Highway improvement works on Greenway Bank, Biddulph.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 10:50.

Cadent Gas logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Chorlton Road

Cadent Gas are proposing to carry out New service connection on Chorlton Road, Birches Head, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 14:30.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Crackley Bank

Staffordshire County Council were proposing to carry out Highway improvement works on Crackley Bank, Newcastle Under Lyme.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 11:32.

Severn Trent Water logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Chapel Street

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Severn Trent Water on 24 Sep 2024 at 12:56.

Severn Trent Water logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Follow
Endon Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Endon Road, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 19 Nov 2024 at 14:45.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Chatterley Drive

Cadent Gas are proposing to carry out Utility asset works on Chatterley Drive, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 11:58.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Coalpit Hill

Staffordshire County Council are proposing to carry out Highway improvement works on Coalpit Hill, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 08:30.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Coalpit Hill

Staffordshire County Council are proposing to carry out Highway improvement works on Coalpit Hill, Newcastle Under Lyme.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 12:56.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Mill Hayes Road

Staffordshire County Council are proposing to carry out Highway improvement works on Mill Hayes Road, Knypersley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 09:18.

Cadent Gas logo
Between
17 and 28 Feb 2025
Details
View Map
Share
Station Road

Cadent Gas were proposing to carry out Utility asset works on Station Road, Scholar Green.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 12:30.

Staffordshire County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Mow Lane

Staffordshire County Council are proposing to carry out Highway improvement works on Mow Lane, Stoke-on-trent.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 09:46.

Connect Fibre (Fibre Assets) logo
Between
18 and 25 Feb 2025
Details
View Map
Share
Follow
High Street

Connect Fibre (Fibre Assets) are proposing to carry out Utility repair and maintenance works on High Street, The Rookery, Kidsgrove.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Connect Fibre (Fibre Assets) on 18 Nov 2024 at 09:59.

Murphy Power Distribution logo
Between
19 Feb and 18 Mar 2025
Details
View Map
Share
Follow
Church Street

Murphy Power Distribution are proposing to carry out Utility asset works on Church Street, Chesterton, Newcastle Under Lyme.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 18 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 18 Nov 2024 at 11:18.


Roadworks Map near to Garbett Street, STOKE-ON-TRENT, ST6 5RQ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 23 Nov 2024 13:47
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Garbett Street, STOKE-ON-TRENT, ST6 5RQ (16 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Stoke-on-trent City Council logo
MAJOR
  
GARBETT STREET, GOLDENHILL 
(0.1 miles)
Stoke-on-trent City Council
Section 58 - Carriageway - No carriageway incursion
Planned
Scheduled: 2 Mar 2022 - 2 Mar 2025
0.1
Details
Share
Follow
2
Stoke-on-trent City Council logo
MAJOR
  
ANDREW STREET, GOLDENHILL 
(0.2 miles)
Stoke-on-trent City Council
Section 58 - Carriageway - No carriageway incursion
Planned
Scheduled: 4 Mar 2022 - 4 Mar 2025
0.2
Details
Share
Follow
3
Stoke-on-trent City Council logo
MAJOR
  
TURNHURST ROAD 
(0.7 miles)
Stoke-on-trent City Council
Section 58 - Carriageway - No carriageway incursion
Planned
Scheduled: 1 Aug 2023 - 1 Aug 2026
0.7
Details
Share
Follow
4
Cadent Gas logo
MAJOR
  
HILLSIDE AVENUE 
(0.8 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 1 Nov 2024 - 29 Nov 2024
0.8
Details
Share
Follow
5
Cadent Gas logo
MAJOR
  
HILLSIDE AVENUE 
(0.8 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Give and take
In Progress
Since: 16 Oct 2024 11:30
(Scheduled: 11 Oct 2024 - 29 Nov 2024)
0.8
Details
Share
Follow
6
Staffordshire County Council logo
ROWAN CLOSE 
(0.8 miles)
Staffordshire County Council
Highway improvement works - Carriageway - Some carriageway incursion
Planned
Scheduled: 22 Nov 2024 - 25 Nov 2024
0.8
Details
Share
Follow
7
Cadent Gas logo
MAJOR
  
CHATTERLEY DRIVE 
(0.8 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Road closure
Planned
Scheduled: 4 Nov 2024 - 29 Nov 2024
0.8
Details
Share
Follow
8
Lightspeed Network logo
GREENSIDE CLOSE 
(0.9 miles)
Lightspeed Network
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 18 Nov 2024 - 29 Nov 2024
0.9
Details
Share
Follow
9
Cadent Gas logo
MAJOR
  
NELSON BANK 
(0.9 miles)
Cadent Gas
Utility asset works - Carriageway, Verge - Road closure
Planned
Scheduled: 18 Nov 2024 - 29 Nov 2024
0.9
Details
Share
Follow
10
Cadent Gas logo
MAJOR
  
NELSON BANK 
(0.9 miles)
Cadent Gas
Utility asset works - Carriageway, Verge - Road closure
In Progress
Since: 19 Nov 2024 08:00
(Scheduled: 18 Nov 2024 - 29 Nov 2024)
0.9
Details
Share
Follow