ROADWORKS SUMMARY
Lewisham Drive, STOKE-ON-TRENT, ST6 5QX
Introduction
View current and future planned roadworks and road closures for Lewisham Drive, ST6 5QX and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Lewisham Drive, STOKE-ON-TRENT, ST6 5QX
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lewisham Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
1 Mar 2023 and 31 Dec 2024
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Cobridge Road, Cobridge, Stoke On Trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2023 and could run through until 31 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 6 Dec 2022 at 16:30.
1 Mar 2023 and 31 Dec 2024
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Waterloo Road, Stoke On Trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2023 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 6 Dec 2022 at 16:30.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on College Road, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 26 Aug 2022 at 13:54.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Avenue Road, Shelton, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 26 Aug 2022 at 13:54.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on The Parkway, Hanley, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 09:27.
30 Mar 2025
Stoke-on-trent City Council are carrying out Highway improvement works on Cleveland Road, Shelton, Stoke-on-trent.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2024 at 08:00 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 17 Jul 2024 at 08:56.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Harding Road, Hanley, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 09:27.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Victoria Avenue, Shelton, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 09:15.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Shirley Road, Shelton, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 09:16.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Potteries Way, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 31 Aug 2022 at 10:50.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Etruria Road, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 1 Sep 2022 at 07:42.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Festival Way, Etruria, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 1 Sep 2022 at 07:41.
15 Mar 2023 and 30 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Trinity Street, Hanley, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 March 2023 and could run through until 30 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 1 Sep 2022 at 07:42.
3 Apr 2025
Stoke-on-trent City Council are carrying out Highway improvement works on Lower Bethesda Street, Hanley, Stoke-on-trent.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 15 September 2023 at 08:30 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 1 Nov 2023 at 10:46.
30 Mar 2025
Stoke-on-trent City Council are carrying out Highway improvement works on College Road, Stoke-on-trent.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 November 2023 at 07:30 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 27 Nov 2023 at 07:53.
12 Mar 2024 and 12 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Stoke Road, Stoke-on-trent.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 March 2024 and could run through until 12 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 12 Mar 2024 at 12:28.
30 Mar 2025
Stoke-on-trent City Council are carrying out Highway improvement works on Regent Road, Hanley, Stoke-on-trent.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 09:00 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Jun 2024 at 12:49.
1 Apr 2024 and 31 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Ephraim Street, Hanley, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 15:31.
1 Apr 2024 and 31 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Bucknall Road, Hanley, Stoke-on-trent.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 11:51.
1 Apr 2024 and 31 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Porthill Road, Longport, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 15:26.
1 Apr 2024 and 31 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Station Street, Longport, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 15:26.
1 Apr 2024 and 31 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Brereton Place, Burslem, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 13:00.
1 Apr 2024 and 31 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Norman Avenue, Tunstall, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 15:25.
1 Apr 2024 and 31 Mar 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Chorley Avenue, Chell, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2024 and could run through until 31 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Mar 2024 at 13:56.
20 Dec 2024
Staffordshire County Council are carrying out Highway improvement works on Greenway Bank, Biddulph.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 10 June 2024 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Sep 2024 at 12:46.
11 May 2025
Severn Trent Water are carrying out Utility asset works on Etruria Way, Newcastle Under Lyme.
These works are categorised as Major.
The works started on 24 June 2024 at 09:26 and could run through until 11 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 24 Jun 2024 at 08:26.
30 Mar 2025
Stoke-on-trent City Council are carrying out Highway improvement works on College Road, Stoke-on-trent.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 September 2024 at 07:30 and could run through until 30 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Stoke-on-trent City Council on 9 Oct 2024 at 09:23.
20 Dec 2024
Staffordshire County Council are carrying out Highway improvement works on Beasley Avenue, Newcastle Under Lyme.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 00:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 21 Nov 2024 at 10:33.
23 Sep 2024 and 5 Aug 2025
Staffordshire County Council are proposing to carry out Highway improvement works on High Street, Chesterton, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 5 August 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 14:20.
Friday
Severn Trent Water are proposing to carry out Utility asset works on Hambro Place, Fegg Hayes, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Severn Trent Water on 7 Aug 2024 at 14:59.
Friday
Severn Trent Water are proposing to carry out Utility asset works on Hambro Place, Fegg Hayes, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Severn Trent Water on 21 Aug 2024 at 08:57.
Monday
Cadent Gas were proposing to carry out Utility asset works on Rydal Way, Alsager.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 09:46.
19 Nov 2024 and 3 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Sandbach Road North, Alsager.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 November 2024 and run through until 3 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Aug 2024 at 12:13.
Monday
Severn Trent Water are carrying out Utility repair and maintenance works on Wedgwood Street, Stoke-on-trent.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 13:49 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 10:37.
25 Nov and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Scot Hay Road, Silverdale, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 15:47.
25 Nov and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Kents Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 15:47.
25 Nov and 18 Dec 2024
Western Power Distribution (West Midlands) are proposing to carry out New service connection on Apedale Road, Chesterton, Newcastle Under Lyme.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 6 Sep 2024 at 14:54.
25 Nov and 18 Dec 2024
Western Power Distribution (West Midlands) were proposing to carry out New service connection on Red Lion Square, Newcastle Under Lyme.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 28 Oct 2024 at 10:24.
25 Nov and 18 Dec 2024
Western Power Distribution (West Midlands) were proposing to carry out New service connection on Victoria Street, Chesterton, Newcastle Under Lyme.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 18 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 15 Oct 2024 at 10:50.
25 Nov and 20 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Liverpool Road, Kidsgrove.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 09:23.
25 Nov and 20 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Liverpool Road East, Newcastle Under Lyme.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 20 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Aug 2024 at 11:46.
25 Nov 2024 and 24 Jan 2025
Cadent Gas were proposing to carry out Utility asset works on Sandbach Road North, Alsager.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 10:30.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Seabridge Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:31.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Bankside, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Sep 2024 at 13:31.
Tomorrow
Staffordshire County Council were proposing to carry out Highway improvement works on Watermills Road, Newcastle Under Lyme.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 12 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 11:41.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Bursley Way, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Sep 2024 at 09:29.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Eardleyend Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Oct 2024 at 13:50.
9 and 20 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Ravenscliffe Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 15:14.
Today
Staffordshire County Council are proposing to carry out Highway improvement works on Mount Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 09:20.
Friday
Staffordshire County Council are carrying out Highway improvement works on Greenway Bank, Biddulph.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 December 2024 at 10:03 and could run through until 13 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Staffordshire County Council on 11 Dec 2024 at 11:08.
Tomorrow
Staffordshire County Council are proposing to carry out Highway improvement works on Whitehill Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 09:20.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Hayes Road, Knypersley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Nov 2024 at 08:24.
Monday
Cadent Gas are carrying out Utility repair and maintenance works on Leek Road, Stoke-on-trent.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 10 December 2024 at 14:00 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 14:43.
Friday
Staffordshire County Council were proposing to carry out Highway improvement works on Rowhurst Close, Newcastle Under Lyme.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Dec 2024 at 11:41.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Queen Street, Audley, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 12:36.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Boon Hill Road, Bignall End, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 12:23.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Nelson Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Minton Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Ellison Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Boulton Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Keeling Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Templar Terrace, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Audley Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 09:08.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Cross Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Oct 2024 at 10:23.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Hough Hill, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 10:26.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Mere Lake Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Nov 2024 at 11:03.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Brook Lane, Endon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 10:26.
Friday
Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 10:26.
12 Dec 2024 and 26 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Sandbach Road North, Alsager.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 December 2024 and run through until 26 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Sep 2024 at 11:55.
12 Dec 2024 and 13 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Rydal Way, Alsager.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 09:39.
12 Dec 2024 and 29 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Sandbach Road North, Alsager.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 December 2024 and could run through until 29 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Sep 2024 at 09:47.
15 Dec 2024 and 15 Jun 2025
Stoke-on-trent City Council are proposing to carry out Highway improvement works on Westport Road, Burslem, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 December 2024 and could run through until 15 June 2025. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Stoke-on-trent City Council on 19 Sep 2024 at 14:14.
16 and 18 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Barracks Road, Newcastle Under Lyme.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 09:32.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Sneyd Terrace, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 08:48.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Newcastle Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 14:40.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Peebles Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 08:22.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Wulstan Drive, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 15:19.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Basford Park Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 08:48.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Wilmot Drive, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 15:19.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Hempstalls Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 14:40.
16 and 20 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Alexandra Road, Newcastle Under Lyme.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:40.
16 and 19 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Crackley Bank, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:39.
16 Dec 2024 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Chemical Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 16:38.
16 and 19 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Barthomley Road, Barthomley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 10:22.
16 and 19 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Stockton Brook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:08.
16 and 19 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Leek Road, Endon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 14:08.
16 and 19 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Willfield Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 17 Sep 2024 at 11:35.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Sep 2024 at 13:17.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Brook Lane, Endon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Sep 2024 at 15:07.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Stonebank Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 08:34.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Mount Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 11 Nov 2024 at 09:37.
16 and 19 Dec 2024
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Old Butt Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 22 Nov 2024 at 16:15.
16 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Congleton Road, Mow Cop.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 15:35.
17 and 20 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Dimsdale Parade East, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 11:04.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Newcastle Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 15:51.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Wulstan Drive, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 15:47.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Basford Park Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 15:20.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Wilmot Drive, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 11:04.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Hempstalls Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 14:53.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Alexandra Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 15:06.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Dimsdale Parade East, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 11:04.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Nantwich Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 15:25.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Park Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 15:39.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Great Oak Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 15:25.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Willfield Lane, Stockton Brook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:23.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Eardleyend Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 15:25.
23 and 27 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Overland Drive, Brown Edge.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:49.
23 and 25 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 25 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 15:06.
23 and 27 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Gloucester Road, Newcastle Under Lyme.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 16:14.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Newchapel Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 10:34.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Hayes Road, Knypersley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 16:01.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Mow Cop Road, Mow Cop, Kidsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 10:34.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Woodland Street, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 10:14.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Warwick Street, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 15:56.
23 and 27 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Warwick Street, Biddulph.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Sep 2024 at 18:56.
23 and 26 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Church Road, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 26 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Sep 2024 at 12:22.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Lask Edge Road, Leek.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:49.
23 and 27 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Thames Drive, Biddulph.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 10:49.
23 and 27 Dec 2024
Staffordshire County Council were proposing to carry out Highway improvement works on Meadows Way, Biddulph.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:49.
23 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Well Lane, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 19 Sep 2024 at 11:49.
24 and 27 Dec 2024
Staffordshire County Council are proposing to carry out Highway improvement works on Orme Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 December 2024 and could run through until 27 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 15:47.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Silverdale Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 12:56.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Wolstanton Road, Newcastle Under Lyme.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 17:02.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Parkhouse Road West, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 13:42.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stanley Road, Stanley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 12:45.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stanley Bank, Stanley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 12:32.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Post Lane, Stanley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 13:13.
30 Dec 2024 and 1 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on The Rocks, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 23 Sep 2024 at 11:04.
30 Dec 2024 and 1 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Linley Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 1 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 13:42.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Tongue Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 12:07.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on St Davids Way, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 14:48.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Access Between Conway Road Service Road And Park Lane, Knypersley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 11:28.
30 Dec 2024 and 2 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Moorfield Avenue, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 2 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 24 Sep 2024 at 13:10.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on East Drive, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 14:36.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lawton Street, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 14:36.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Thames Drive, Biddulph.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Sep 2024 at 16:48.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Marshfield Lane, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 12:19.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Long Valley Road, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 11:42.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mow Lane, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 12:45.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Marsh Green Road, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 11:54.
30 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Baileys Bank, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 12:19.
31 Dec 2024 and 3 Jan 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Post Lane, Stanley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 December 2024 and run through until 3 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Sep 2024 at 12:02.
31 Dec 2024 and 3 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Park Lane, Knypersley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 December 2024 and could run through until 3 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Sep 2024 at 14:48.
2 and 16 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Gloucester Road, Newcastle Under Lyme.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 16 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:57.
3 and 17 Jan 2025
Virgin Media are proposing to carry out Utility asset works on Liverpool Road, Cross Heath, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 30 Sep 2024 at 09:10.
6 and 8 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stubbs Gate, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 14:59.
6 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on York Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 11:04.
6 and 20 Jan 2025
Virgin Media were proposing to carry out Utility asset works on Liverpool Road, Cross Heath, Newcastle Under Lyme.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 18 Oct 2024 at 16:19.
6 and 20 Jan 2025
Virgin Media are proposing to carry out Utility asset works on Liverpool Road, Cross Heath, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 18 Oct 2024 at 16:20.
6 and 10 Jan 2025
Severn Trent Water are proposing to carry out Utility asset works on Moorland Road, Burslem, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 13:00.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Nantwich Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 11:53.
6 and 10 Jan 2025
Severn Trent Water are proposing to carry out New service connection on Westfield Avenue, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 21 Nov 2024 at 11:11.
6 and 9 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Post Lane, Stanley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 09:22.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Brookfield Avenue, Endon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 11:40.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Sytch Road, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Sep 2024 at 12:53.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Sytch Road, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Sep 2024 at 08:19.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Church Lane, Endon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 11:40.
6 and 8 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Overland Drive, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 10:15.
6 and 31 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Liverpool Road, Kidsgrove.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 11:57.
6 and 9 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Blackwood Hill Lane, Gratton, Endon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 13:52.
6 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Brown Lees Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Oct 2024 at 14:32.
6 and 9 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Barrage Road, Ladymoor Gate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 10:30.
6 and 22 Jan 2025
Western Power Distribution (West Midlands) are proposing to carry out Utility asset works on Access Between Conway Road Service Road And Park Lane, Knypersley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (West Midlands) on 9 Oct 2024 at 13:07.
6 and 9 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on St Johns Road, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 10:15.
6 and 9 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Slater Street, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Oct 2024 at 10:15.
7 and 13 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Greasley Road, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 13:14.
7 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Alsager Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 08:09.
7 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Holehouse Lane, Ladymoor Gate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Oct 2024 at 11:40.
7 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Judgefield Lane, Childerplay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 08:09.
7 and 10 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Greenway Bank, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 08:09.
8 and 10 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Rocks, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 09:22.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Clayton Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 22 Nov 2024 at 14:12.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Nelson Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 09:02.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Ellison Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 09:15.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Templar Terrace, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 8 Oct 2024 at 09:27.
13 and 31 Jan 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Audley Road, Newcastle Under Lyme.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 4 Dec 2024 at 15:25.
13 and 17 Jan 2025
Cadent Gas are proposing to carry out New service connection on Hallwater, Endon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:05.
13 and 17 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Tongue Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 08:09.
13 and 31 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Old Butt Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 23 Sep 2024 at 11:17.
14 and 17 Jan 2025
Cadent Gas are proposing to carry out New service connection on Furlong Lane, Burslem, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Oct 2024 at 13:43.
14 and 17 Jan 2025
Cadent Gas are proposing to carry out New service connection on Furlong Lane, Burslem, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Oct 2024 at 10:33.
14 and 16 Jan 2025
BT are proposing to carry out Utility asset works on Park Lane, Knypersley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 12 Nov 2024 at 12:52.
15 and 17 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Rocks, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 21 Oct 2024 at 15:49.
20 and 23 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Queens Road, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 14 Oct 2024 at 09:47.
20 and 23 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Queens Road, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 15:24.
20 and 24 Jan 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on High Street, Newcastle Under Lyme.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 31 Oct 2024 at 10:54.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lower Milehouse Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 31 Oct 2024 at 09:06.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Wedgwood Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 7 Nov 2024 at 09:16.
20 and 24 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Woodland Street, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 16 Oct 2024 at 15:07.
21 Jan and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Boathorse Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 15:47.
21 Jan and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Boathorse Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 13:10.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Orme Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 14:34.
27 and 31 Jan 2025
Vodafone are proposing to carry out Utility repair and maintenance works on Etruria Road, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 5 Nov 2024 at 15:36.
27 Jan and 4 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Greasley Road, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 17 Oct 2024 at 12:50.
27 Jan and 4 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Greasley Road, Stoke-on-trent.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 4 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 14 Nov 2024 at 18:22.
27 and 30 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stanley Road, Stockton Brook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 7 Nov 2024 at 17:27.
27 and 30 Jan 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Stanley Road, Stockton Brook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 13 Nov 2024 at 09:15.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Cross Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 22 Oct 2024 at 14:48.
27 and 29 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Moss Hill, Stockton Brook.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 11:01.
27 and 31 Jan 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Sandy Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:35.
27 and 30 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Overland Drive, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 10:20.
27 and 30 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Barrage Road, Ladymoor Gate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 09:53.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on St Johns Road, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 07:43.
27 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Slater Street, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 09:53.
28 Jan and 11 Feb 2025
Virgin Media were proposing to carry out Utility asset works on Liverpool Road, Cross Heath, Newcastle Under Lyme.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 January 2025 and run through until 11 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Virgin Media on 29 Oct 2024 at 09:54.
28 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Sandy Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 16:17.
29 and 31 Jan 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Brown Lees Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 27 Nov 2024 at 07:43.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stubbs Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 09:11.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hassell Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 10:04.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Sneyd Terrace, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 10:18.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Newcastle Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 10:43.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Peebles Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 28 Oct 2024 at 15:02.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Wulstan Drive, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 11:17.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Basford Park Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 09:26.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Lower Milehouse Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 12:15.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Wilmot Drive, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 10:56.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hempstalls Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 10:30.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Alexandra Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 13:32.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Dimsdale Parade East, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 09:10.
3 and 21 Feb 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Church Street, Chesterton, Newcastle Under Lyme.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 4 Dec 2024 at 11:15.
3 and 21 Feb 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Audley Road, Newcastle Under Lyme.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 18 Nov 2024 at 11:18.
3 and 7 Feb 2025
Severn Trent Water are proposing to carry out New service connection on Westfield Avenue, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 12:27.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Barthomley Road, Barthomley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 08:57.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Park Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 08:44.
3 and 7 Feb 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Edgefields Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 14:00.
3 and 7 Feb 2025
Cadent Gas are proposing to carry out Disconnection or alteration of supply on Edgefields Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 11:47.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Stonebank Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 30 Oct 2024 at 09:51.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Congleton Road, Mow Cop.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Nov 2024 at 08:41.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mow Lane, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 11:32.
3 and 7 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Well Lane, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 10:58.
4 and 6 Feb 2025
Virgin Media are proposing to carry out Utility asset works on Liverpool Road, Cross Heath, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Virgin Media on 4 Nov 2024 at 11:40.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Peebles Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:53.
10 and 18 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Silverdale Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 15:59.
10 and 18 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Silverdale Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 11:12.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Alsager Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 10:35.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Wedgwood Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 11:04.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 2 Dec 2024 at 10:36.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 4 Dec 2024 at 11:15.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 5 Nov 2024 at 13:46.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Woodhouse Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:26.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Hough Hill, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:13.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Brook Lane, Endon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:26.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Tongue Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 10:50.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Broad Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 09:26.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mount Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 10:06.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Judgefield Lane, Childerplay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 10:50.
10 and 14 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Greenway Bank, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Nov 2024 at 10:50.
12 and 14 Feb 2025
Cadent Gas are proposing to carry out New service connection on Chorlton Road, Birches Head, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 13:15.
12 and 14 Feb 2025
Cadent Gas are proposing to carry out New service connection on Chorlton Road, Birches Head, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 13:52.
17 and 21 Feb 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Crackley Bank, Newcastle Under Lyme.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 13 Nov 2024 at 11:32.
17 and 20 Feb 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Severn Trent Water on 24 Sep 2024 at 12:56.
17 and 28 Feb 2025
Severn Trent Water were proposing to carry out Utility repair and maintenance works on Endon Road, Stoke-on-trent.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 6 Dec 2024 at 11:30.
17 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chatterley Drive, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 11:58.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Coalpit Hill, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 08:30.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Coalpit Hill, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Oct 2024 at 12:56.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mill Hayes Road, Knypersley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 09:18.
17 and 23 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Station Road, Scholar Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 08:14.
17 and 28 Feb 2025
Cadent Gas were proposing to carry out Utility asset works on Station Road, Scholar Green.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 12:30.
17 and 21 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mow Lane, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 09:46.
18 and 25 Feb 2025
Connect Fibre (Fibre Assets) were proposing to carry out Utility repair and maintenance works on High Street, The Rookery, Kidsgrove.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 25 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Connect Fibre (Fibre Assets) on 10 Dec 2024 at 09:17.
19 Feb and 18 Mar 2025
Murphy Power Distribution are proposing to carry out Utility asset works on Church Street, Chesterton, Newcastle Under Lyme.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 18 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Murphy Power Distribution on 18 Nov 2024 at 11:18.
22 Feb and 2 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Station Road, Scholar Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 February 2025 and could run through until 2 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 14:26.
24 Feb and 28 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Clayton Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Nov 2024 at 08:40.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Knutton Lane Link, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 6 Dec 2024 at 11:39.
24 Feb and 7 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Etruscan Street, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 16:50.
24 Feb and 7 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Etruscan Street, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 09:45.
24 Feb and 4 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cemetery Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 5 Dec 2024 at 10:23.
24 Feb and 4 Mar 2025
Severn Trent Water are proposing to carry out Utility repair and maintenance works on Cemetery Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Severn Trent Water on 10 Dec 2024 at 11:12.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Parkhouse Road West, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 10:11.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Crackley Bank, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 14 Nov 2024 at 11:25.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Crackley Bank, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 15 Nov 2024 at 08:53.
24 Feb and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Woodstock Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:15.
24 and 28 Feb 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Linley Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 12 Nov 2024 at 10:11.
24 Feb and 14 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Mow Lane, Stoke-on-trent.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 10 Sep 2024 at 11:34.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Orme Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 18 Nov 2024 at 12:53.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Crown Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 21 Nov 2024 at 11:25.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Crown Street, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 25 Nov 2024 at 11:41.
3 Mar and 18 Jul 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Wilmot Drive, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Staffordshire County Council on 3 Dec 2024 at 12:16.
3 Mar and 29 Aug 2025
Staffordshire County Council are proposing to carry out Highway repair and maintenance works on Chemical Lane, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 29 August 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Staffordshire County Council on 28 Nov 2024 at 11:30.
3 and 7 Mar 2025
Cadent Gas are proposing to carry out New service connection on Sandy Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 9 Dec 2024 at 16:55.
3 and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Ravenscliffe Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:15.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Brown Lees Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 15:46.
3 and 5 Mar 2025
BT are proposing to carry out Utility asset works on Park Lane, Knypersley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 2 Dec 2024 at 16:05.
3 and 7 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on St Johns Road, Biddulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 26 Nov 2024 at 15:46.
3 and 5 Mar 2025
BT are proposing to carry out Utility asset works on Mow Cop Road, Mow Cop, Kidsgrove.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Nov 2024 at 12:36.
7 Mar and 3 Apr 2025
Cadent Gas were proposing to carry out Utility asset works on Walton Place, Newcastle Under Lyme.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 March 2025 and run through until 3 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 13:13.
7 Mar and 3 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Walton Place, Newcastle Under Lyme.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Nov 2024 at 09:49.
10 and 14 Mar 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Silverdale Road, Newcastle Under Lyme.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Nov 2024 at 17:06.
10 and 14 Mar 2025
Staffordshire County Council were proposing to carry out Highway improvement works on Knutton Lane, Newcastle Under Lyme.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 March 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Staffordshire County Council on 20 Nov 2024 at 17:06.
10 and 14 Mar 2025
Cadent Gas are proposing to carry out New service connection on Sandy Lane, Brown Edge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 15:00.
10 and 14 Mar 2025
Staffordshire County Council are proposing to carry out Highway improvement works on Gloucester Road, Newcastle Under Lyme.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Staffordshire County Council on 9 Dec 2024 at 12:08.
Roadworks Map near to Lewisham Drive, STOKE-ON-TRENT, ST6 5QX
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Lewisham Drive, STOKE-ON-TRENT, ST6 5QX (21 Events)
(Scheduled Dates)
(miles)
(Scheduled: 25 Nov 2024 - 11 Dec 2024)
(Scheduled: 10 Dec 2024 - 13 Dec 2024)
(Scheduled: 3 Dec 2024 - 19 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.