ROADWORKS SUMMARY
The Chase, Bournemouth Park Road, SOUTHEND-ON-SEA, SS2 5LW
Introduction
View current and future planned roadworks and road closures for The Chase, Bournemouth Park Road, SS2 5LW and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to The Chase, Bournemouth Park Road, SOUTHEND-ON-SEA, SS2 5LW
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Chase, Bournemouth Park Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Monday
Cadent Gas were proposing to carry out Utility asset works on Snakes Lane, Eastwood.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 16 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 10:39.
Monday
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Eastern Avenue, Southend-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 16 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 17 Sep 2024 at 11:23.
Thursday
BT are carrying out Utility asset works on Barnstaple Road, Southend-on-sea, Thorpe Bay.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 09:30 and could run through until 19 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 22 Nov 2024 at 14:20.
Thursday
BT were proposing to carry out Utility asset works on Barnstaple Road, Southend-on-sea, Thorpe Bay.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 November 2024 and run through until 19 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 22 Nov 2024 at 13:38.
Monday
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Ness Road, Shoeburyness, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 29 November 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 17 Sep 2024 at 08:38.
Monday
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Shoebury Common Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 9 Sep 2024 at 12:50.
Monday
Southend-on-sea Borough Council are carrying out Highway repair and maintenance works on Ditton Court Road, Westcliff-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 November 2024 at 23:00 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 3 Dec 2024 at 09:03.
Monday
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Ditton Court Road, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 November 2024 and could run through until 16 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 29 Nov 2024 at 13:05.
Thursday
UK Power Networks Eastern & London are carrying out Utility repair and maintenance works on Elmwood Avenue, Hawkwell.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 1 December 2024 at 16:56 and could run through until 19 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 11 Dec 2024 at 16:19.
Wednesday
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Cumberland Avenue, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 11 Sep 2024 at 15:45.
9 and 23 Dec 2024
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Carlingford Drive, Westcliff-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 15 Oct 2024 at 11:18.
9 and 23 Dec 2024
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Arterial Road, Leigh-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 30 Sep 2024 at 11:51.
Wednesday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Hadleigh Road, Leigh-on-sea.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 08:19 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 12 Dec 2024 at 10:32.
Wednesday
Essex And Suffolk Water are carrying out Utility repair and maintenance works on Scotts Hall Road, Canewdon.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 December 2024 at 08:43 and could run through until 18 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 12 Dec 2024 at 12:31.
16 and 20 Dec 2024
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Preston Road, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 2 Sep 2024 at 11:44.
16 and 20 Dec 2024
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Preston Road, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 3 Sep 2024 at 10:05.
19 Dec 2024 and 8 Jan 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Stock Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 3 Oct 2024 at 11:34.
20 and 23 Dec 2024
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Manners Way, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 December 2024 and could run through until 23 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 3 Oct 2024 at 12:53.
22 and 24 Dec 2024
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Southsea Avenue, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 December 2024 and could run through until 24 December 2024. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 27 Sep 2024 at 13:38.
27 Dec 2024 and 13 Jan 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on High Street, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 December 2024 and could run through until 13 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 10 Oct 2024 at 14:16.
31 Dec 2024 and 16 Jan 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Thorpe Hall Avenue, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 December 2024 and could run through until 16 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 16 Oct 2024 at 11:19.
6 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wakering Avenue, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Nov 2024 at 11:42.
6 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wakering Avenue, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 10:26.
6 Jan and 10 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Wakering Avenue, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 10:29.
6 and 11 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 17:15.
6 and 17 Jan 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Southchurch Avenue, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 3 Dec 2024 at 12:11.
6 and 11 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Southend Road, Hockley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 29 Oct 2024 at 17:14.
7 Jan and 4 Feb 2025
Essex And Suffolk Water were proposing to carry out Remedial works on Prittlewell Chase, Westcliff-on-sea.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 January 2025 and run through until 4 February 2025. The works were due to impact the carriageway, verge and cycleway.
This roadwork event was last updated by Essex And Suffolk Water on 9 Dec 2024 at 08:06.
11 and 13 Jan 2025
Essex And Suffolk Water are proposing to carry out Permanent reinstatement on Highbank Close, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Essex And Suffolk Water on 22 Nov 2024 at 15:34.
13 and 24 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Greenacres, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 14 Oct 2024 at 12:28.
13 and 18 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 08:55.
13 and 18 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 18 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 19 Nov 2024 at 08:54.
13 and 15 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Daws Heath Road, Rayleigh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 14 Nov 2024 at 15:45.
13 and 17 Jan 2025
Cadent Gas are proposing to carry out New service connection on South Street, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 11:31.
14 and 16 Jan 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Coleman Street, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 2 Sep 2024 at 15:29.
14 and 16 Jan 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Coleman Street, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 16 January 2025. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 3 Sep 2024 at 10:04.
15 and 29 Jan 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Carlingford Drive, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 16 Oct 2024 at 12:11.
20 and 23 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Paglesham Road, Paglesham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 12:41.
20 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Cherry Orchard Way, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 13:38.
20 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road Roundabout, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 13:23.
20 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 13:43.
20 and 22 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 26 Nov 2024 at 13:35.
20 and 23 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Paglesham Road, Stambridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 12:41.
23 and 27 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 11:54.
23 and 27 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Main Road, Hawkwell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 12:13.
23 and 27 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Hall Road, Rochford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 10 Dec 2024 at 12:13.
27 and 29 Jan 2025
Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 18 Oct 2024 at 12:11.
27 Jan and 7 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Greenacres, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex County Council on 25 Nov 2024 at 12:36.
27 Jan and 7 Feb 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Ness Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 29 Nov 2024 at 13:34.
27 Jan and 7 Feb 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Shoebury Common Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 29 Nov 2024 at 12:14.
27 Jan and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 13:04.
27 Jan and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on High Street, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 14:46.
27 Jan and 10 Feb 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Thorpe Hall Avenue, Thorpe Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 19 Sep 2024 at 15:38.
28 and 31 Jan 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Tankerville Drive, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 11 Sep 2024 at 14:51.
28 and 31 Jan 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Tankerville Drive, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 13 Sep 2024 at 11:45.
3 and 6 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Middlesex Avenue, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 6 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 12 Nov 2024 at 14:59.
10 and 24 Feb 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on North Shoebury Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the verge only.
This roadwork event was last updated by Southend-on-sea Borough Council on 11 Nov 2024 at 10:28.
10 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on The Goslings, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:53.
10 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Rectory Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Dec 2024 at 16:32.
10 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on The Goslings, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 14:56.
10 and 24 Feb 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Rochford Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 11 Nov 2024 at 13:15.
10 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Scrub Lane, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Dec 2024 at 17:04.
10 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on New Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Dec 2024 at 17:04.
10 and 14 Feb 2025
Essex County Council are proposing to carry out Highway improvement works on Daws Heath Road, Hadleigh, Benfleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Essex County Council on 12 Dec 2024 at 16:32.
11 and 25 Feb 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Marine Parade, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 25 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 18 Nov 2024 at 12:19.
13 and 27 Feb 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Stock Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 10 Dec 2024 at 10:23.
17 Feb and 17 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Chalkwell Avenue, Westcliff-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 15:38.
17 Feb and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chalkwell Esplanade, Westcliff-on-sea.
These works are categorised as Major.
The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 11:00.
17 Feb and 17 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Chalkwell Avenue, Westcliff-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 13:24.
17 Feb and 18 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chalkwell Esplanade, Westcliff-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 12:30.
17 Feb and 17 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Ashingdon Road, Hawkwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 26 Nov 2024 at 12:18.
17 Feb and 17 Mar 2025
Nexfibre Networks Limited are proposing to carry out Utility asset works on Ashingdon Road, Hawkwell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 5 Dec 2024 at 15:57.
17 and 23 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bournemouth Park Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 28 Nov 2024 at 13:52.
17 and 23 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bournemouth Park Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 6 Nov 2024 at 10:49.
17 and 23 Feb 2025
UK Power Networks Eastern & London are proposing to carry out New service connection on Bournemouth Park Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 25 Oct 2024 at 16:47.
17 and 28 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Southchurch Avenue, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 3 Dec 2024 at 11:45.
17 Feb and 3 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Esplanade Gardens, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 13:00.
17 Feb and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on First Avenue, Westcliff-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 13:00.
18 and 21 Feb 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Middlesex Avenue, Leigh-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Essex And Suffolk Water on 25 Nov 2024 at 12:33.
24 Feb and 11 Mar 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Southchurch Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 14 Oct 2024 at 13:30.
24 Feb and 10 Mar 2025
Southend-on-sea Borough Council were proposing to carry out Highway repair and maintenance works on Southchurch Road, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 10 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 24 Sep 2024 at 11:27.
25 Feb and 3 Mar 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Independent Footpath From Audleys Close To Carolines Close, Southend-on-sea.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 25 February 2025 and could run through until 3 March 2025. The works will impact the verge and footpath.
This roadwork event was last updated by Cityfibre Metro Networks on 6 Dec 2024 at 16:58.
26 Feb and 12 Mar 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Queensway, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 4 Dec 2024 at 14:57.
26 Feb and 3 Mar 2025
BT were proposing to carry out Utility asset works on Southchurch Road, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 February 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 27 Sep 2024 at 12:14.
26 Feb and 3 Mar 2025
BT were proposing to carry out Utility asset works on Tyrrel Drive, Southend-on-sea.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 February 2025 and run through until 3 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 27 Sep 2024 at 12:12.
3 Mar and 21 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Elm Road, Shoeburyness.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:19.
3 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wakering Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Nov 2024 at 09:52.
3 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Wakering Road, Shoeburyness, Southend-on-sea.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:02.
3 and 24 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Elm Road, Shoeburyness.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 24 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 14:01.
3 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Blackgate Road, Shoeburyness.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 13:01.
3 Mar and 21 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Elm Road, Shoeburyness.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Oct 2024 at 12:49.
3 and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Blackgate Road, Shoeburyness.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Oct 2024 at 15:23.
3 and 17 Mar 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Porters Grange Roundabout, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 17 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 27 Nov 2024 at 08:59.
3 Mar and 4 Apr 2025
Essex And Suffolk Water are proposing to carry out Utility repair and maintenance works on Eastern Avenue, Southend-on-sea.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Essex And Suffolk Water on 14 Oct 2024 at 15:55.
3 and 14 Mar 2025
BT are proposing to carry out Utility asset works on Manners Way Service Road East, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 6 Dec 2024 at 14:37.
5 and 7 Mar 2025
BT are proposing to carry out Utility asset works on Sycamore Grove, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 5 Dec 2024 at 13:03.
5 and 7 Mar 2025
Southend-on-sea Borough Council are proposing to carry out Highway repair and maintenance works on Chichester Road, Southend-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southend-on-sea Borough Council on 5 Dec 2024 at 10:57.
Roadworks Map near to The Chase, Bournemouth Park Road, SOUTHEND-ON-SEA, SS2 5LW
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to The Chase, Bournemouth Park Road, SOUTHEND-ON-SEA, SS2 5LW (90 Events)
(Scheduled Dates)
(miles)
(Scheduled: 7 Jul 2023 - 13 Mar 2025)
(Scheduled: 22 Jul 2024 - 21 Feb 2025)
(Scheduled: 10 Dec 2024 - 20 Dec 2024)
(Scheduled: 21 Jun 2023 - 7 Feb 2025)
Contains public sector information licensed under the Open Government Licence v3.0.